Difference between revisions of "Controls Meeting 26-Jul-2012"

From GlueXWiki
Jump to: navigation, search
m
m
Line 53: Line 53:
  
 
=Minutes=
 
=Minutes=
 +
 +
Present:  Elliott W, Josh B, Mark S, Scot S, Hovanes E.
 +
 +
 +
 +
'''Gas System'''
 +
 +
* Current designs are a bit more complicated than was expected.
 +
* Beni will give a presentation at one of the Aug Controls meetings.
 +
* Josh is talking to Narcisco to coordinate controls choices.
 +
* Narcisco is working on a P&I diagram.
 +
 +
 +
 +
'''Danfysik Power Supply'''
 +
 +
* Tom just wants to use H-D personnel to work on the supply.
 +
* Due to his workload Mark will not much more than the minimum necessary to get the supply going for the Solenoid test.
 +
* We'll revisit generic refurbishment and upgrades after the test.
 +
* Mark will sort his Danfysik maintenance list into must do, should do, would like to do.
 +
 +
 +
 +
'''Purchases'''
 +
 +
* Josh ordered one Windows quad-core computer.  After much discussion we decided he should order two more plus three big monitors for the test.
 +
* Josh is having procurement return the A-B stuff from Tiger Controls and reorder from EECO (authorized distributor).  Seals on some items from Tiger Controls were broken and they were more expensive than EECO.
 +
* Elliott will identify an old Linux to be used to host the MySql database.
 +
 +
 +
 +
'''EPICS'''

Revision as of 15:25, 26 July 2012

Agenda

  • Announcements
    • FPGA programming tutorial by Ben Raydo some time in Aug at Online meeting
    • Beni will talk about the Gas System next meeting
    • Hall D complex A/C power monitoring restarted
    • Followup by Sarin in Aug?
    • Nerses should be arriving early Aug
  • Minutes from previous meeting 12-Jul-2012
  • Gas system - Josh
  • Danfysik refurbishment: who and what? - Mark
  • Hardware purchase status - Josh, Hovanes
  • EPICS - Hovanes, Vanik
    • motion control, alarm system, goniometer, other power supplies, etc.
  • Counting house installation - Hovanes, Mark, Elliott
    • do we need to communicate with both UPS and RDC?
  • Solenoid test - Mark, Josh, Scot, Elliott
    • Fasttrack schedule
    • Maintenance and other OSP's
    • Goals, test plan, procedures, reviews
    • Computers
    • FMEA, SOE, quench detector, overcurrent protection, ground fault detector, etc.
  • PLC programming and PXI system - Josh, Dave, Yi
  • Test stand - Hovanes, Josh
    • SOE test
  • JInventory - Josh, Hovanes, Elliott
  • Elogs and databases - Elliott
  • Mantis task tracker
  • Experiment Control Supervisor - Elliott


Time/Location

NOTE change of room
9:30 AM Thurs 26-Jul-2012 ARC 233


Announcements

Next Meeting

9:30am Thurs 9-Aug-2012 CC L207


Minutes

Present: Elliott W, Josh B, Mark S, Scot S, Hovanes E.


Gas System

  • Current designs are a bit more complicated than was expected.
  • Beni will give a presentation at one of the Aug Controls meetings.
  • Josh is talking to Narcisco to coordinate controls choices.
  • Narcisco is working on a P&I diagram.


Danfysik Power Supply

  • Tom just wants to use H-D personnel to work on the supply.
  • Due to his workload Mark will not much more than the minimum necessary to get the supply going for the Solenoid test.
  • We'll revisit generic refurbishment and upgrades after the test.
  • Mark will sort his Danfysik maintenance list into must do, should do, would like to do.


Purchases

  • Josh ordered one Windows quad-core computer. After much discussion we decided he should order two more plus three big monitors for the test.
  • Josh is having procurement return the A-B stuff from Tiger Controls and reorder from EECO (authorized distributor). Seals on some items from Tiger Controls were broken and they were more expensive than EECO.
  • Elliott will identify an old Linux to be used to host the MySql database.


EPICS