Controls Meeting 25-Mar-2021

From GlueXWiki
Revision as of 09:10, 25 March 2021 by Hovanes (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
  • Announcements
  • Solenoid status
    State code in PLC (Nick)
    PXI issues (Brian)
  • BCAL temperature PLC controls stability (Nick)
  • GUIs for BCAL chiller controls (Hovanes)
    Snapshot of EPICS GUIs
  • Magnet power supply related temperature readouts (Scot)
  • FCAL HV controls modifications (Hovanes, Nick)
  • FCAL2 chillers (Nick)
  • Vacuum gatevalve problems and PLC-s (Nick)
  • DIRC N2 Issues
    North DIRC N2 flow (Scot)
    New DIRC N2 controls
  • Other items
    power on FCAL platform
    network switch in the tagger hall
    disconnected racks in the tagger hall

Time/Location

10:00am Thursday 25-Mar-2021