Controls Meeting 25-Jul-2019

From GlueXWiki
Revision as of 09:38, 25 July 2019 by Hovanes (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
  • Announcements
  • Solenoid status (Tim,Beni,Brian)
    • Cooldown
    • PXI
  • Goniometer controls
    • Boards for linear stages (Tim, Nick).
    • XPS Controllers (Nick, Hovanes)
    • Survey in lab
  • New ComCal chiller controls
  • TOF HV upgrades (Hovanes)
    New TOF HV GUI
  • Tagger NMR
  • Test setup for power crates
  • DIRC installations
  • Other business

Time/Location

10:00AM Thursday 25-Jul-2019 CC B101