Difference between revisions of "Controls Meeting 25-Jul-2019"

From GlueXWiki
Jump to: navigation, search
 
(One intermediate revision by the same user not shown)
Line 6: Line 6:
 
** Boards for linear stages (Tim, Nick).
 
** Boards for linear stages (Tim, Nick).
 
** XPS Controllers (Nick, Hovanes)  
 
** XPS Controllers (Nick, Hovanes)  
** Survey
+
** Survey in lab
 
* New ComCal chiller controls
 
* New ComCal chiller controls
 
* TOF HV upgrades (Hovanes)
 
* TOF HV upgrades (Hovanes)
 +
*: [[Media:new_tof_hvv_gui.png | New TOF HV GUI]]
 
* Tagger NMR  
 
* Tagger NMR  
 
* Test setup for power crates  
 
* Test setup for power crates  

Latest revision as of 09:38, 25 July 2019

  • Announcements
  • Solenoid status (Tim,Beni,Brian)
    • Cooldown
    • PXI
  • Goniometer controls
    • Boards for linear stages (Tim, Nick).
    • XPS Controllers (Nick, Hovanes)
    • Survey in lab
  • New ComCal chiller controls
  • TOF HV upgrades (Hovanes)
    New TOF HV GUI
  • Tagger NMR
  • Test setup for power crates
  • DIRC installations
  • Other business

Time/Location

10:00AM Thursday 25-Jul-2019 CC B101