Difference between revisions of "Controls Meeting 25-Jul-2019"

From GlueXWiki
Jump to: navigation, search
(Created page with "* Announcements * Solenoid status (Tim,Beni,Brian) ** Cooldown ** PXI * Goniometer controls ** Boards for linear stages (Tim, Nick). ** XPS Controllers (Nick, Hovanes) * New...")
 
Line 8: Line 8:
 
* New ComCal chiller controls
 
* New ComCal chiller controls
 
* TOF HV upgrades (Hovanes)
 
* TOF HV upgrades (Hovanes)
 +
* Tagger NMR
 
* Test setup for power crates  
 
* Test setup for power crates  
 
* DIRC installations  
 
* DIRC installations  

Revision as of 16:29, 24 July 2019

  • Announcements
  • Solenoid status (Tim,Beni,Brian)
    • Cooldown
    • PXI
  • Goniometer controls
    • Boards for linear stages (Tim, Nick).
    • XPS Controllers (Nick, Hovanes)
  • New ComCal chiller controls
  • TOF HV upgrades (Hovanes)
  • Tagger NMR
  • Test setup for power crates
  • DIRC installations
  • Other business

Time/Location

10:00AM Thursday 25-Jul-2019 CC B101