Difference between revisions of "Controls Meeting 24-Jan-2013"

From GlueXWiki
Jump to: navigation, search
m
m (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/")
 
(4 intermediate revisions by 2 users not shown)
Line 2: Line 2:
  
 
* Announcements
 
* Announcements
 +
** '''Interview seminar at 11am'''
 
* Minutes from previous meeting [[Controls_Meeting_15-Nov-2012|15-Nov-2012]]
 
* Minutes from previous meeting [[Controls_Meeting_15-Nov-2012|15-Nov-2012]]
 +
* Gas System hardware purchase - Beni, Josh
 +
**[[File:gassystem.pdf]]
 
* Counting House computer purchase update - Hovanes, Elliott
 
* Counting House computer purchase update - Hovanes, Elliott
 
** Hall D file server is central component
 
** Hall D file server is central component
 
** Windows applications - PC vs terminal server
 
** Windows applications - PC vs terminal server
* Gas System hardware purchase - Beni, Josh
 
 
* UPS power in the hall - Elliott
 
* UPS power in the hall - Elliott
 
* EPICS update - Hovanes
 
* EPICS update - Hovanes
Line 18: Line 20:
 
** Code management for PLC code
 
** Code management for PLC code
 
** FCAL, BCAL, FDC cooling, etc.
 
** FCAL, BCAL, FDC cooling, etc.
* [http://halldweb1.jlab.org/JInventory JInventory] - Elliott
+
* [http://halldweb.jlab.org/JInventory JInventory] - Elliott
 
** barcode readers and labels, conventions, etc.
 
** barcode readers and labels, conventions, etc.
* [http://halldweb1.jlab.org/mantisbt Mantis task tracker]
+
* [http://halldweb.jlab.org/mantisbt Mantis task tracker]
* [https://halldweb1.jlab.org/elog-halld Midas elog]
+
* [https://halldweb.jlab.org/elog-halld Midas elog]
  
  
Line 49: Line 51:
  
 
=Minutes=
 
=Minutes=
 +
 +
Present:  Elliott W, Beni Z, Damon, Narciso G, Mark S, Hovanes E, Dave B, Josh B.
 +
 +
 +
'''Gas System'''
 +
 +
We spent the entire (short) meeting going over the gas system drawings (see link above), and discussed safety issues, sensor choice, buffer tank size, power, installation, etc.  Dave B will do the PLC programming since Josh will be gone by then.  Note that all PID loops reside in Brooks controllers, none needed in the PLC.
 +
 +
Plan is for Dave/Josh and Beni/Narciso to agree on channel types and counts, and for Mark S to decide what power supplies and auxiliary equipment is needed.  Dave B will come up with a final PLC parts list and place the order.

Latest revision as of 11:09, 31 March 2015

Agenda

  • Announcements
    • Interview seminar at 11am
  • Minutes from previous meeting 15-Nov-2012
  • Gas System hardware purchase - Beni, Josh
  • Counting House computer purchase update - Hovanes, Elliott
    • Hall D file server is central component
    • Windows applications - PC vs terminal server
  • UPS power in the hall - Elliott
  • EPICS update - Hovanes
  • Solenoid test status - Josh, Mark, Scot, Elliott
    • MySQL and logging
    • SOE installation, PXI UPS, Danfysik fan on UPS, QD, EWEB
  • Tom's printer/scanner?
  • Experience with new Elog - all
  • Other controls applications
    • Josh leaving in 5 weeks, Dave takes over, who will be backup?
    • Code management for PLC code
    • FCAL, BCAL, FDC cooling, etc.
  • JInventory - Elliott
    • barcode readers and labels, conventions, etc.
  • Mantis task tracker
  • Midas elog


  • Experiment Control Supervisor - Elliott


Time/Location

Note room change!

9:30AM Thurs 24-Jan-2013 CC A110



Announcements

Next Meeting

9:30am Thurs 7-Feb-2013


Minutes

Present: Elliott W, Beni Z, Damon, Narciso G, Mark S, Hovanes E, Dave B, Josh B.


Gas System

We spent the entire (short) meeting going over the gas system drawings (see link above), and discussed safety issues, sensor choice, buffer tank size, power, installation, etc. Dave B will do the PLC programming since Josh will be gone by then. Note that all PID loops reside in Brooks controllers, none needed in the PLC.

Plan is for Dave/Josh and Beni/Narciso to agree on channel types and counts, and for Mark S to decide what power supplies and auxiliary equipment is needed. Dave B will come up with a final PLC parts list and place the order.