Difference between revisions of "Controls Meeting 23-Aug-2012"

From GlueXWiki
Jump to: navigation, search
m
m
Line 47: Line 47:
  
 
=Minutes=
 
=Minutes=
 +
 +
Present:  Elliott W, Mark S, Josh B, Dave B, Sarin P.
 +
 +
 +
Most of the meeting was taken up with Sarin's presentation.  A few topics were discussed briefly:

Revision as of 15:27, 23 August 2012

Agenda

  • Announcements
    • FPGA programming tutorial by Ben Raydo on 29-Aug at Online meeting
    • Beni will talk about the Gas System in early Sep.
  • Minutes from previous meeting 9-Aug-2012
  • Hardware purchase status - Josh, Hovanes
  • Test Stand - Josh
    • SOE, Turbo pump
  • EPICS - Hovanes
  • Counting house installation - Hovanes
  • JInventory improvements - Elliott
  • Solenoid test - Mark, Josh, Scot, Elliott
    • Fasttrack schedule
    • Power supply maintenance OSP
    • Test plan, procedures, operations OSP, review
    • Vacuum, SOE, quench detector, etc.
  • PLC programming and PXI system - Josh, Dave, Yi
  • Danfysik tutorial part 3 - Sarin P.
  • Mantis task tracker
  • Midas elog


  • Experiment Control Supervisor - Elliott
  • Accelerator Elog - Elliott


Time/Location

Note change of location

9:30AM Thurs 9-Aug-2012 CC L102


Announcements

Next Meeting

9:30am Thurs 6-Sep-2012 CC L207


Minutes

Present: Elliott W, Mark S, Josh B, Dave B, Sarin P.


Most of the meeting was taken up with Sarin's presentation. A few topics were discussed briefly: