Controls Meeting 20-Sep-2018

From GlueXWiki
Revision as of 19:47, 19 September 2018 by Hovanes (Talk | contribs) (Created page with "* Announcements * Solenoid status (Tim,Beni,Brian) ** Liquid level : sensors vs formulae ** ROOT GUIs on RHEL7 ** Time offset * ComCal ** Translation stages (Tim, Vanik) ** Vo...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
  • Announcements
  • Solenoid status (Tim,Beni,Brian)
    • Liquid level : sensors vs formulae
    • ROOT GUIs on RHEL7
    • Time offset
  • ComCal
    • Translation stages (Tim, Vanik)
    • Voltages (Vanick, Nick)
      Interlocks for CAEN modules
    • LED pulser (Hovanes)
    • Temperature monitoring (Nick)
    • Chiller
  • DIRC controls
    • Voltages (Nick, Vanik)
      MPOD boards
    • LED Pulser (Hovanes)
    • Scalers and Temperatures (Hovanes)
    • Interlocks
  • Other

Time/Location

10:00AM Thursday 20-Sep-2018 CC B101