Controls Meeting 20-Sep-2012

From GlueXWiki
Revision as of 12:28, 18 September 2012 by Wolin (Talk | contribs) (Created page with "=Agenda= '''Note: we will move quickly through the status reports to give Dan plenty of time''' * Announcements ** Daniel will talk about the FCAL base control system and firm...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Agenda

Note: we will move quickly through the status reports to give Dan plenty of time

  • Announcements
    • Daniel will talk about the FCAL base control system and firmware at the 20-Sep meeting
    • Ed Jastrzembski will give a followup talk about FPGA programming in Oct
  • Minutes from previous meeting 6-Sep-2012
  • Hardware purchase status - Josh, Hovanes
  • Danfysik board repair - Josh
  • Test Stand - Josh
  • EPICS - Hovanes
  • Counting house installation - Hovanes
  • JInventory improvements - Elliott
    • purchase barcode labels now?
  • Solenoid test - Mark, Josh, Scot, Elliott
    • Revised Cooldown Date
    • Required documenation includes entries into JInventory database!
    • Fasttrack schedule
    • Power supply maintenance OSP, Cooldown OSP, Powered operations OSP, reviews
    • Test plan, procedures, THA, FMEA
    • Vacuum, SOE, quench detector, etc.
  • PLC programming and PXI system - Josh, Dave, Yi
  • FCAL Control System - Dan
  • Mantis task tracker
  • Midas elog


  • Experiment Control Supervisor - Elliott
  • Accelerator Elog - Elliott


Time/Location

9:30AM Thurs 20-Sep-2012 CC L207


Announcements

Next Meeting

Not sure due to vacation schedule


Minutes