Difference between revisions of "Controls Meeting 20-Mar-2014"

From GlueXWiki
Jump to: navigation, search
(Created page with "=Agenda= * Announcements * Minutes from previous meeting Controls Meeting 6-Mar-2014 * UPS requirements for solenoid controls (Dave, Yi, Hovanes) * BCAL power supply interlo...")
 
(Agenda)
Line 5: Line 5:
 
* UPS requirements for solenoid controls (Dave, Yi, Hovanes)
 
* UPS requirements for solenoid controls (Dave, Yi, Hovanes)
 
* BCAL power supply interlocks (Dave)
 
* BCAL power supply interlocks (Dave)
 +
* PLC archiving
 
* Radiator insertion stage test (Hovanes, Yi)
 
* Radiator insertion stage test (Hovanes, Yi)
 
* Save/restore for voltage parameters (Hovanes, Nerses)
 
* Save/restore for voltage parameters (Hovanes, Nerses)

Revision as of 08:41, 19 March 2014

Agenda

  • Announcements
  • Minutes from previous meeting Controls Meeting 6-Mar-2014
  • UPS requirements for solenoid controls (Dave, Yi, Hovanes)
  • BCAL power supply interlocks (Dave)
  • PLC archiving
  • Radiator insertion stage test (Hovanes, Yi)
  • Save/restore for voltage parameters (Hovanes, Nerses)
  • Suggested modifications to BCAL and FDC voltage software (Elton, others)
  • Any other business


Time/Location

9:30AM Thurs 20-Mar-2014 CC A110