Controls Meeting 17-Nov-2011

From GlueXWiki
Revision as of 18:34, 14 November 2011 by Wolin (Talk | contribs) (Created page with "=Agenda= * Announcements ** FMEA for solenoid required by Lehman committee * Minutes from previous meeting 20-Oct-2011 * Equipment orders - all ...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Agenda

  • Announcements
    • FMEA for solenoid required by Lehman committee
  • Minutes from previous meeting 20-Oct-2011
  • Equipment orders - all
  • Solenoid_Controls_Redesign - Mark, Josh, Scot, Cody, Yi, Elliott
    • shunt replacement
    • coil tap isolation, range and precision
    • UPS power to Danfysik
    • quench detector balance, new quench detector
    • ground fault detector using dump resistor
    • redundant Danfysik contactor, quench detector, dump diodes?
    • fast DAQ replacement
  • Experiment Control Supervisor - Elliott, Hovanes
    • use CSS?
  • JLab discriminator and EPICS - Nerses
  • Controls test stand - Hovanes, Josh
    • SOE module
    • 435NBX serial module
    • EPICS drivers and gui's
  • EPICS evaluation
    • archiver
    • alarm system
    • backup/restore
  • PLC programming, Viewpoint, licenses, etc. - Josh
    • high-priority tasks
    • add-on instructions -- ladder logic, function block, structured text
  • Networking - Hovanes, Elliott
  • UPS power in the hall - Elliott
  • ELog - Elliott
    • Midas for notebooks
    • operator log?
  • Mantis task tracker
  • PyIRMIS - Hovanes, Elliott


Time/Location

9:30 AM Thurs 17-Nov-2011 CC L207


Announcements

Next Meeting

Thurs 1-Dec-2011 9:30am CC L207


Minutes