Difference between revisions of "Controls Meeting 17-Nov-2011"

From GlueXWiki
Jump to: navigation, search
m
m
Line 64: Line 64:
  
 
=Minutes=
 
=Minutes=
 +
 +
Present:  Elliott W, Josh B, Mark S.
 +
 +
 +
'''Equipment Orders'''
 +
 +
* Mark still has to order rack parts.
 +
* Mark will produce a desired equipment list in priority order.
 +
* Josh has received everything he ordered (SOE, 435NBX, etc).
 +
 +
 +
 +
'''Solenoid Controls Redesign'''

Revision as of 15:17, 18 November 2011

Agenda

  • Announcements
    • FMEA for solenoid required by Lehman committee
    • Need EE help?
  • Minutes from previous meeting 20-Oct-2011
    • Vendor show doomed the 3-Nov meeting
  • Equipment orders - all
  • Solenoid_Controls_Redesign - Mark, Josh, Scot, Cody, Yi, Elliott
    • Preliminay P&I completed, cryo vessel to be ordered soon
    • changes to cryo control system
    • shunt replacement
    • coil tap isolation, range and precision
    • UPS power to Danfysik
    • quench detector balance, new quench detector
    • ground fault detector using dump resistor
    • redundant Danfysik contactor, quench detector, dump diodes?
    • fast DAQ replacement
  • Experiment Control Supervisor - Vardan, Hovanes, Elliott
    • use CSS?
  • EPICS evaluation
    • archiver
    • alarm system
    • backup/restore
  • EPICS - Nerses, Hovanes, Elliott
    • JLab discriminator
    • directory structure
  • Controls test stand - Hovanes, Josh
    • SOE module
    • 435NBX serial module
    • EPICS drivers and gui's
  • PLC programming, Viewpoint, licenses, etc. - Josh
    • high-priority tasks
    • add-on instructions -- ladder logic, function block, structured text
  • Networking - Hovanes, Elliott
  • UPS power in the hall - Elliott
  • Elog - Elliott
  • Mantis task tracker
  • PyIRMIS - Hovanes, Elliott


Time/Location

9:30 AM Thurs 17-Nov-2011 CC L207


Announcements

Next Meeting

Thurs 1-Dec-2011 9:30am CC L207


Minutes

Present: Elliott W, Josh B, Mark S.


Equipment Orders

  • Mark still has to order rack parts.
  • Mark will produce a desired equipment list in priority order.
  • Josh has received everything he ordered (SOE, 435NBX, etc).


Solenoid Controls Redesign