* Announcements
 
* Announcements
 +
** CNU summer students
 
* Minutes from previous meeting [[Controls_Meeting_3-May-2012|3-May-2012]]
 
* Minutes from previous meeting [[Controls_Meeting_3-May-2012|3-May-2012]]
* Barcode scanner - Elliott
+
* Barcode scanner - Elliott, Hovanes
 
** wireless? USB? base station?
 
** wireless? USB? base station?
 
** how many? how and where used?
 
** how many? how and where used?
 +
** [http://www.motorola.com/Business/US-EN/Business+Product+and+Services/Bar+Code+Scanning/General+Purpose+Scanners/DS4208 Motorolla DS4208]
 +
* FCC Class B UPS's - Hovanes, Elliott
 +
** [http://www.grainger.com/Grainger/GENERAL-ELECTRIC-UPS-System-5EFA0?cm_sp=IO-_-IDP-_-BTM_BTB05209020&cm_vc=IDPBBZ2 Grainger 5 kVA], [http://www.grainger.com/Grainger/GENERAL-ELECTRIC-UPS-System-5EFA2?cm_sp=IO-_-IDP-_-BTM_BTB05209020&cm_vc=IDPBBZ2 Grainger 8 kVA]
 +
** how much power is needed?  power factor?
 
* EPICS - Hovanes, Vanik
 
* EPICS - Hovanes, Vanik
 
** alarm system, goniometer, UConn boards, other power supplies, etc.
 
** alarm system, goniometer, UConn boards, other power supplies, etc.
Line 12: Line 17:
 
** FMEA
 
** FMEA
 
** UPS power to Danfysik, SOE, QD, overcurrent protection, ground fault detector, etc.
 
** UPS power to Danfysik, SOE, QD, overcurrent protection, ground fault detector, etc.
* [http://halldweb1.jlab.org/JInventory JInventory database] - Elliott
+
* [http://halldweb.jlab.org/JInventory JInventory database] - Elliott
 
* Test stand - Hovanes, Josh
 
* Test stand - Hovanes, Josh
 
* PLC programming and PXI system - Josh
 
* PLC programming and PXI system - Josh
 
* Elogs and databases - Elliott
 
* Elogs and databases - Elliott
** [https://halldweb1.jlab.org/elog-halld Midas elog]
+
** [https://halldweb.jlab.org/elog-halld Midas elog]
 
** Operator elog
 
** Operator elog
* [http://halldweb1.jlab.org/mantisbt Mantis task tracker]
+
* [http://halldweb.jlab.org/mantisbt Mantis task tracker]
 
* Experiment Control Supervisor - Elliott
 
* Experiment Control Supervisor - Elliott
  
Line 41: Line 46:
  
 
=Minutes=
 
=Minutes=
 +
 +
Present:  Elliott W, Hovanes E, Vanik K, Mark S, Dave B.
 +
 +
 +
 +
'''JInventory system and barcode scanner'''
 +
 +
* Hovanes suggested adding two new fields, MAC_Address and IPName.  Elliott will do this.  The Telecom field will stay.
 +
* Wired barcodes scanners around $300, full-function wireless around $1600 or more.
 +
* Elliott will find out about Bluetooth versions.
 +
* Consensus is that we need at least two, one wired, one wireless.
 +
* Will purchase wired model now, not sure whether to buy wireless model now or later.
 +
* Consensus to enter slots as full items in the JInventory system.
 +
* Elliott will create scripts to automate creation of slot entries for crates.
 +
* Josh entered many A-B modules.
 +
* Mark will enter electrical substations and panel boards.
 +
 +
 +
 +
'''Small UPS's'''
 +
 +
* Still not clear how much power needed.  We know what out equipment needs, not sure about other systems (e.g. SiPM cooling).
 +
* Hovanes found high-capacity expensive FCC Class B UPS's at Grainger.  Low-capacity ones are easy to find.
 +
* Elliott asked Paul Powers to look into filtering Class A power down to Class B specs.
 +
* We believe our power factors are typically near one, maybe 0.9.
 +
 +
 +
 +
'''EPICS'''
 +
 +
* Vanik continues to make progress on the stepper motor controller.  He got the optical counter feature to work.
 +
* Will likely need optical limit switches since "home" feature not working well.  Unfortunately they are easily radiation damaged.
 +
* UConn boards may be redesigned.
 +
* We're hoping Accelerator will take over four of our five power supplies (not the Solenoid supply).
 +
 +
 +
 +
'''Counting House'''
 +
 +
* RDC will be installed next week.
 +
* Giles finalizing rack room power distribution plan.
 +
* Everything is cleaned up for the Open House.
 +
 +
 +
 +
'''Solenoid'''
 +
 +
* Mark installed new Danfysik boards.
 +
* Mark installed center tap on dump resistor.
 +
* Mark is working on SOE circuits.
 +
* We misplaced Hall C's flow switch, had to order another.
 +
 +
 +
 +
'''Test Stand'''
 +
 +
* Hovanes ordered a 32-port terminal server, updated version of the ones used in Hall B.  About $1500.
 +
 +
 +
 +
'''PLC'''
 +
 +
* Dave Butler is learning about our PLC system.
 +
* Josh may have a good first project for him, reworking the Danfysik communication code.

Latest revision as of 10:36, 31 March 2015

Agenda

  • Announcements
    • CNU summer students
  • Minutes from previous meeting 3-May-2012
  • Barcode scanner - Elliott, Hovanes
  • FCC Class B UPS's - Hovanes, Elliott
  • EPICS - Hovanes, Vanik
    • alarm system, goniometer, UConn boards, other power supplies, etc.
  • Counting house installation - Hovanes, Mark
  • Solenoid_Controls_Redesign - Mark, Josh, Scot, Yi, Elliott
    • FMEA
    • UPS power to Danfysik, SOE, QD, overcurrent protection, ground fault detector, etc.
  • JInventory database - Elliott
  • Test stand - Hovanes, Josh
  • PLC programming and PXI system - Josh
  • Elogs and databases - Elliott
  • Mantis task tracker
  • Experiment Control Supervisor - Elliott


Time/Location

9:30 AM Thurs 17-May-2012 CC L207


Announcements

Next Meeting

9:30am 31-May-2012 CC L207


Minutes

Present: Elliott W, Hovanes E, Vanik K, Mark S, Dave B.


JInventory system and barcode scanner

  • Hovanes suggested adding two new fields, MAC_Address and IPName. Elliott will do this. The Telecom field will stay.
  • Wired barcodes scanners around $300, full-function wireless around $1600 or more.
  • Elliott will find out about Bluetooth versions.
  • Consensus is that we need at least two, one wired, one wireless.
  • Will purchase wired model now, not sure whether to buy wireless model now or later.
  • Consensus to enter slots as full items in the JInventory system.
  • Elliott will create scripts to automate creation of slot entries for crates.
  • Josh entered many A-B modules.
  • Mark will enter electrical substations and panel boards.


Small UPS's

  • Still not clear how much power needed. We know what out equipment needs, not sure about other systems (e.g. SiPM cooling).
  • Hovanes found high-capacity expensive FCC Class B UPS's at Grainger. Low-capacity ones are easy to find.
  • Elliott asked Paul Powers to look into filtering Class A power down to Class B specs.
  • We believe our power factors are typically near one, maybe 0.9.


EPICS

  • Vanik continues to make progress on the stepper motor controller. He got the optical counter feature to work.
  • Will likely need optical limit switches since "home" feature not working well. Unfortunately they are easily radiation damaged.
  • UConn boards may be redesigned.
  • We're hoping Accelerator will take over four of our five power supplies (not the Solenoid supply).


Counting House

  • RDC will be installed next week.
  • Giles finalizing rack room power distribution plan.
  • Everything is cleaned up for the Open House.


Solenoid

  • Mark installed new Danfysik boards.
  • Mark installed center tap on dump resistor.
  • Mark is working on SOE circuits.
  • We misplaced Hall C's flow switch, had to order another.


Test Stand

  • Hovanes ordered a 32-port terminal server, updated version of the ones used in Hall B. About $1500.


PLC

  • Dave Butler is learning about our PLC system.
  • Josh may have a good first project for him, reworking the Danfysik communication code.