Difference between revisions of "Controls Meeting 16-Jun-2011"

From GlueXWiki
Jump to: navigation, search
m
m (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/")
 
(One intermediate revision by one other user not shown)
Line 7: Line 7:
 
** E.g:  gas system, CAN system, FDC cooling, target, magnets, goniometer, HV/LV channels, crate control, etc.
 
** E.g:  gas system, CAN system, FDC cooling, target, magnets, goniometer, HV/LV channels, crate control, etc.
 
* Update on Brooks 0254  control IOC and CSS/BOY evaluation - Hovanes
 
* Update on Brooks 0254  control IOC and CSS/BOY evaluation - Hovanes
* [http://halldweb1.jlab.org/mantisbt Mantis task tracker] - now being used for controls tasks
+
* [http://halldweb.jlab.org/mantisbt Mantis task tracker] - now being used for controls tasks
 
* AOT
 
* AOT
  
Line 40: Line 40:
 
Beni presented a preliminary P&I diagram for the FDC/CDC gas systems.  Much discussion ensued.
 
Beni presented a preliminary P&I diagram for the FDC/CDC gas systems.  Much discussion ensued.
  
*
+
* < 15 psig, non-flammable gases allow us to avoid many ASME issues.  Engineers need to sign off anything > 15 psig.
 +
* methane may be used < 5%, non-flammable, pre-mix with another gas the best strategy.
 +
* may need special vents if there's a way for the methane to collect.
 +
* may bubble through alcohol - anti-aging, quencher.
 +
* CDC uses 3 L/min, FDC 1 L/min nominal.
 +
* will use embedded controls, probably will not need any control loops in PLC.

Latest revision as of 18:44, 31 March 2015

Agenda

  • Minutes from previous meeting 2-Jun-2011
  • Preliminary P&I diagram for FDC/CDC gas system Tracking Chamber Gas system - Beni
  • Strategy for use of PLC vs IOC vs mixed system - Elliott
    • what criteria push us one way or the other?
    • E.g: gas system, CAN system, FDC cooling, target, magnets, goniometer, HV/LV channels, crate control, etc.
  • Update on Brooks 0254 control IOC and CSS/BOY evaluation - Hovanes
  • Mantis task tracker - now being used for controls tasks
  • AOT


Time/Location

9:30 AM Thurs 16-Jun-2011 CC F326


Announcements

Next Meeting

Thurs 30-Jun-2011 CC F326


Minutes

Attendees: Elliott W, Beni Z, Tim W, Josh B, Eugene C.


FDC Gas System

Beni presented a preliminary P&I diagram for the FDC/CDC gas systems. Much discussion ensued.

  • < 15 psig, non-flammable gases allow us to avoid many ASME issues. Engineers need to sign off anything > 15 psig.
  • methane may be used < 5%, non-flammable, pre-mix with another gas the best strategy.
  • may need special vents if there's a way for the methane to collect.
  • may bubble through alcohol - anti-aging, quencher.
  • CDC uses 3 L/min, FDC 1 L/min nominal.
  • will use embedded controls, probably will not need any control loops in PLC.