Controls Meeting 13-Jun-2019

From GlueXWiki
Revision as of 09:29, 13 June 2019 by Hovanes (Talk | contribs)

Jump to: navigation, search
  • Announcements
  • Solenoid status (Tim,Beni)
    • Cooldown
  • Goniometer controls
    • Boards for linear stages (Tim, Nick).
    • XPS Controllers (Nick, Hovanes)
  • Remote resets (Hovanes, Nick)
    • CAEN HV crates (Almost Done)
    • Setpoints not lost with power reset
  • EDM screens in WMENU/JMENU (Tyler, Peter)
  • New ComCal chiller controls
  • Test setup for power crates (Nick)
  • TOF upgrades
  • DIRC installations
  • Other business
    Possible upgrades to RHEL7 in August.

Time/Location

10:00AM Thursday 13-Jun-2019 CC B101