Difference between revisions of "Controls Meeting 13-Jun-2019"

From GlueXWiki
Jump to: navigation, search
 
Line 6: Line 6:
 
** XPS Controllers (Nick, Hovanes)  
 
** XPS Controllers (Nick, Hovanes)  
 
* Remote resets (Hovanes, Nick)
 
* Remote resets (Hovanes, Nick)
** CAEN HV crates  (Almost Done)
+
** CAEN HV crates  (almost done)
 
** Setpoints not lost with power reset  
 
** Setpoints not lost with power reset  
 
* EDM screens in WMENU/JMENU (Tyler, Peter)
 
* EDM screens in WMENU/JMENU (Tyler, Peter)
 +
*: [https://epicsweb.jlab.org/wmenu/#HallCMenu-page Hall C WMENU]
 +
*: [https://epicsweb.jlab.org/wmenu/#HallDMenu-page Hall D WMENU]
 
* New ComCal chiller controls
 
* New ComCal chiller controls
 
* Test setup for power crates (Nick)
 
* Test setup for power crates (Nick)

Latest revision as of 09:31, 13 June 2019

  • Announcements
  • Solenoid status (Tim,Beni)
    • Cooldown
  • Goniometer controls
    • Boards for linear stages (Tim, Nick).
    • XPS Controllers (Nick, Hovanes)
  • Remote resets (Hovanes, Nick)
    • CAEN HV crates (almost done)
    • Setpoints not lost with power reset
  • EDM screens in WMENU/JMENU (Tyler, Peter)
    Hall C WMENU
    Hall D WMENU
  • New ComCal chiller controls
  • Test setup for power crates (Nick)
  • TOF upgrades
  • DIRC installations
  • Other business
    Possible upgrades to RHEL7 in August.

Time/Location

10:00AM Thursday 13-Jun-2019 CC B101