Controls Meeting 12-Jul-2018

From GlueXWiki
Jump to: navigation, search
  • Announcements
  • Solenoid status (Tim,Beni,Brian)
    • ADC calibrations
  • Goniometer (Tim, Hovanes)
  • ComCal
    • Translation stages (Tim, Hovanes)
    • Voltages (Hovanes, Nick)
    • LED pulser (Hovanes)
    • Temperature monitoring and chiller ??
  • DIRC controls
    • Water system (Nick)
    • Gas system (Nick)
    • Voltages (Nick, Hovanes)
    • LED Pulser (Hovanes)
  • Other

Time/Location

10:00AM Thursday 12-Jul-2018 CC B101