Controls Meeting 12-Jul-2018
From GlueXWiki
Revision as of 17:01, 11 July 2018 by Hovanes (Talk | contribs) (Created page with "* Announcements * Solenoid status (Tim,Beni,Brian) ** ADC calibrations * Goniometer (Tim, Hovanes) * ComCal ** Translation stages (Tim, Hovanes) ** Voltages (Hovanes, Nick) **...")
- Announcements
- Solenoid status (Tim,Beni,Brian)
- ADC calibrations
- Goniometer (Tim, Hovanes)
- ComCal
- Translation stages (Tim, Hovanes)
- Voltages (Hovanes, Nick)
- LED pulser (Hovanes)
- Temperature monitoring ??
- DIRC controls
- Water system (Nick)
- Gas system (Nick)
- Voltages (Nick, Hovanes)
- LED Pulser (Hovanes)
- Other
Time/Location
10:00AM Thursday 12-Jul-2018 CC B101