Controls Meeting 12-Jul-2018

From GlueXWiki
Revision as of 17:01, 11 July 2018 by Hovanes (Talk | contribs) (Created page with "* Announcements * Solenoid status (Tim,Beni,Brian) ** ADC calibrations * Goniometer (Tim, Hovanes) * ComCal ** Translation stages (Tim, Hovanes) ** Voltages (Hovanes, Nick) **...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
  • Announcements
  • Solenoid status (Tim,Beni,Brian)
    • ADC calibrations
  • Goniometer (Tim, Hovanes)
  • ComCal
    • Translation stages (Tim, Hovanes)
    • Voltages (Hovanes, Nick)
    • LED pulser (Hovanes)
    • Temperature monitoring ??
  • DIRC controls
    • Water system (Nick)
    • Gas system (Nick)
    • Voltages (Nick, Hovanes)
    • LED Pulser (Hovanes)
  • Other

Time/Location

10:00AM Thursday 12-Jul-2018 CC B101