Construction plan 1/1/2020 - 30/8/2020

From GlueXWiki
Revision as of 19:15, 8 January 2020 by Somov (Talk | contribs)

Jump to: navigation, search

The goal is to assemble 450 - 500 modules by the end of summer


  • Brazing straps
Procedure - brazing setup exists, has to be finalized
Time per module - 30 min


  • ESR shaping
- ESR cutting (cutting tool exist)
- Shaping in the oven (2 shaping tools exist, 30 min per cycle]