Construction plan 1/1/2020 - 30/8/2020
From GlueXWiki
The goal is to assemble 450 - 500 modules by the end of summer
- Brazing straps
- Procedure - brazing setup exists, has to be finalized
- Time per module - 30 min
- ESR shaping
- - ESR cutting (cutting tool exist)
- - Shaping in the oven (2 shaping tools exist, 30 min per cycle]