(Created page with " {| class="wikitable" style="text-align: center;" |+ Time estimates for Run Plan |- ! Activity !! Duration (PAC Days) !! Duration (hours) !! Current !! Target !! Collimator...")
 
Line 7: Line 7:
 
| style="text-align:left" | Full target (Production)  ||  20 || 960 || 27 nA|| Pb (0.3 mm) || 3.4 mm || JD70-103 or JD70-107  
 
| style="text-align:left" | Full target (Production)  ||  20 || 960 || 27 nA|| Pb (0.3 mm) || 3.4 mm || JD70-103 or JD70-107  
 
| style="text-align:left" | Alternate 0/90 deg diamond configuration
 
| style="text-align:left" | Alternate 0/90 deg diamond configuration
|-
 
| style="text-align:left" | TOF, CDC HV Scans  ||  0.2 || 10 || 27 nA || - || 3.4 mm || AMO (1x10-4)
 
|style="text-align:left" | Need time to assess data before updating settings. FCAL/BCAL trigger
 
|-
 
| style="text-align:left" | Empty Target  ||  1.5? || 72 || 27 nA || - || 3.4 mm || JD70-103 or JD70-107
 
|style="text-align:left" | Run at higher current?
 
|-
 
| style="text-align:left" | Diamond Alignment  ||  0.5? || 24 || 20 nA  || Pb (0.3 mm) || 3.4 mm ||  JD70-103 and JD70-107
 
|style="text-align:left" |
 
|-
 
| style="text-align:left" | Trigger Commissioning ||  1? ||  48 || 100 nA? || Pb (0.3 mm) || 3.4 mm || JD70-103 or JD70-107
 
| style="text-align:left" |
 
|-
 
| style="text-align:left" | Lead Shield Alignment  ||  0.2 ||  10 || 30-100 nA || Pb (0.3 mm) || 3.4 mm || JD70-103 or JD70-107
 
| style="text-align:left" |
 
|-
 
| style="text-align:left" | Beam Energy Calibration  ||  0.1? || 5 || 100 nA || Pb (0.3 mm) || 3.4 mm || JD70-103 or JD70-107
 
| style="text-align:left" | Collimator Blocking for 5 min, periodically
 
|-
 
| style="text-align:left" | Straight Track (Solenoid off)  ||  0.5? || 24 || 100 nA? || Pb (0.3 mm) || 3.4 mm || JD70-103 or JD70-107
 
| style="text-align:left" | Ramping magnet takes about a shift.
 
|-
 
| style="text-align:left" | PS magnet at GlueX nominal current  ||  0.1? || 5 || 27 nA? || Pb (0.3 mm) || 3.4 mm || JD70-103 or JD70-107
 
| style="text-align:left" |
 
 
|-
 
|-
 
| style="text-align:left" | TAC Runs  ||  1.5? || 72 || <2 nA || - || 3.4 mm ||  AMO (2x10-5)
 
| style="text-align:left" | TAC Runs  ||  1.5? || 72 || <2 nA || - || 3.4 mm ||  AMO (2x10-5)

Revision as of 08:24, 11 May 2022

Time estimates for Run Plan
Activity Duration (PAC Days) Duration (hours) Current Target Collimator Radiator Comment
Full target (Production) 20 960 27 nA Pb (0.3 mm) 3.4 mm JD70-103 or JD70-107 Alternate 0/90 deg diamond configuration
TAC Runs 1.5? 72 <2 nA - 3.4 mm AMO (2x10-5)
All Non-production total 5.6 269 - - - - -