FCAL
 +
 +
- the slot 9 adc was not properly seated in the 3.3 Gev runs, it is seated now
 +
 +
BCAL
 +
 +
- gluing of the light guides is done, they are slightly over sized
 +
 +
- plan is to set up in 126 within a week and install in the hall on March 21
 +
 +
Hall A Calorimeter
 +
 +
- plan is to put in hall by Mar 14 and slide under tagger on March 21
 +
 +
General info
 +
 +
- Sergey, Alex, and John will characterize the energy of the 3 remote paddles under the tagger on the floor
 +
 +
- Hall will be at 5 pass for remainder of run except for a week with a global energy change at some future date

Revision as of 09:05, 15 March 2012

Agenda

  1. BCAL preparations
    1. Assembly Photos
    2. Electronics Update (Fernando)


Minutes

FCAL

- the slot 9 adc was not properly seated in the 3.3 Gev runs, it is seated now

BCAL

- gluing of the light guides is done, they are slightly over sized

- plan is to set up in 126 within a week and install in the hall on March 21

Hall A Calorimeter

- plan is to put in hall by Mar 14 and slide under tagger on March 21

General info

- Sergey, Alex, and John will characterize the energy of the 3 remote paddles under the tagger on the floor

- Hall will be at 5 pass for remainder of run except for a week with a global energy change at some future date