(Created page with " == Minutes == Hall - 3 pass (~2.5 GeV) until Thursday - 5 pass for remainder of time after Thursday FCAL - data taken at 5% of 2.5 GeV BCAL - found clog in quick disconnec...")
 
Line 1: Line 1:
== Minutes ==
+
== Minutes ==
  
 
Hall
 
Hall
  
 
- 3 pass (~2.5 GeV) until Thursday
 
- 3 pass (~2.5 GeV) until Thursday
 +
 
- 5 pass for remainder of time after Thursday
 
- 5 pass for remainder of time after Thursday
 +
  
 
FCAL
 
FCAL
  
 
- data taken at 5% of 2.5 GeV
 
- data taken at 5% of 2.5 GeV
 +
  
 
BCAL
 
BCAL
  
 
- found clog in quick disconnect (Elton, Alex, Yi, John) temps dropped by few degrees C, still +3 C on downstream side, differential between chiller and downstream decreased to 1 C
 
- found clog in quick disconnect (Elton, Alex, Yi, John) temps dropped by few degrees C, still +3 C on downstream side, differential between chiller and downstream decreased to 1 C
 +
 
- swapped flow direction from down to up to up to down (Elton, John) and downstream stayed +3C, confirming hypothesis of poor thermal connection on downstream side
 
- swapped flow direction from down to up to up to down (Elton, John) and downstream stayed +3C, confirming hypothesis of poor thermal connection on downstream side
 +
 
- Elton will give thorough report on thermal glue used at next meeting
 
- Elton will give thorough report on thermal glue used at next meeting
 +
 
- data taken at different bias voltages
 
- data taken at different bias voltages
 +
 
- still see oscillations
 
- still see oscillations
 +
  
 
Future plans
 
Future plans
  
 
- look at scalars today(FCAL)
 
- look at scalars today(FCAL)
 +
 
- look at different DAQ modes tomorrow (FCAL)
 
- look at different DAQ modes tomorrow (FCAL)
 +
 
- will take data at different thresholds this week (BCAL)
 
- will take data at different thresholds this week (BCAL)
 +
 
- install CTP in a few weeks to look at trigger options
 
- install CTP in a few weeks to look at trigger options
 +
 
- all detectors will remain in current location until 5 pass beam is restored
 
- all detectors will remain in current location until 5 pass beam is restored
 +
 
- BCAL will go to 20 degree angled position on April 25, still 23 % E
 
- BCAL will go to 20 degree angled position on April 25, still 23 % E

Revision as of 14:57, 16 April 2012

Minutes

Hall

- 3 pass (~2.5 GeV) until Thursday

- 5 pass for remainder of time after Thursday


FCAL

- data taken at 5% of 2.5 GeV


BCAL

- found clog in quick disconnect (Elton, Alex, Yi, John) temps dropped by few degrees C, still +3 C on downstream side, differential between chiller and downstream decreased to 1 C

- swapped flow direction from down to up to up to down (Elton, John) and downstream stayed +3C, confirming hypothesis of poor thermal connection on downstream side

- Elton will give thorough report on thermal glue used at next meeting

- data taken at different bias voltages

- still see oscillations


Future plans

- look at scalars today(FCAL)

- look at different DAQ modes tomorrow (FCAL)

- will take data at different thresholds this week (BCAL)

- install CTP in a few weeks to look at trigger options

- all detectors will remain in current location until 5 pass beam is restored

- BCAL will go to 20 degree angled position on April 25, still 23 % E