Beam Test Meeting Mon. Apr. 09, 2012

From GlueXWiki
Revision as of 14:38, 9 April 2012 by Leckey (Talk | contribs) (Agenda)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Agenda

FCAL GEANT simulations (Kei)


Minutes

-Hall B going to 3 pass = ~2.5 GeV until next Wednesday

-FCAL simulation presentation, see link above

-BCAL – see elog for daily changes

-Temp of chiller dropped 5C today to reduce temp

-need to understand oscillations

-need to understand chiller and internal temps better

-need to add calibrated remote counter to BCAL DAQ

-some channels have overflow bit, need to understand