Difference between revisions of "BLTWG Meeting 1/22/2018"

From GlueXWiki
Jump to: navigation, search
(Created page with "=== Organization === * Time: 11:30 EDT * JLab meeting room: A110 * Connecting: detailed instructions are here ** H.323 ip address: 199....")
 
Line 12: Line 12:
 
# Announcements
 
# Announcements
 
# [[GlueX-Collaboration-Feb-2018|Collaboration Meeting]] February 22-24, 2018
 
# [[GlueX-Collaboration-Feb-2018|Collaboration Meeting]] February 22-24, 2018
 +
# Updates on polarization studies
 +
#* CB spectrum and polarization studies - ''Glasgow''
 +
#* Update on hadronic asymmetries - ''anyone''
 +
# Hardware issues being worked out
 +
#* new V-wire radiator - ''Alexandre D.''
 +
#* new diamond radiators - ''Richard J.''
 +
#* triplet polarimeter - ''Mike D.''
 +
#* tagger microscope - ''Richard J.''
 +
#* tagger hodoscope - ''Sasha S.''
 +
#* pair spectrometer - ''Sasha S''
 +
# Virtual spot uncertainties
 +
#* [https://logbooks.jlab.org/entry/3517880 logbook entries regarding harp measurements]
 +
#* [https://drive.google.com/file/d/0B8giqd10L9kkV1dSSXBrMEIxdXc/view?usp=sharing Todd harp locations 3-9-2017]
 +
# Updates on simulations
 +
#* TAC run simulations
 +
#* simulation of a fast raster
 +
# Updates from the to-do list
 +
#* refining the beam energy scale
 +
#* PS analysis and acceptance
 +
#* improved calibrations
 +
# Any other business

Revision as of 03:04, 22 January 2018

Organization

  • Time: 11:30 EDT
  • JLab meeting room: A110
  • Connecting: detailed instructions are here
  • Conference id: 536076821
  • Present:

Agenda

  1. Announcements
  2. Collaboration Meeting February 22-24, 2018
  3. Updates on polarization studies
    • CB spectrum and polarization studies - Glasgow
    • Update on hadronic asymmetries - anyone
  4. Hardware issues being worked out
    • new V-wire radiator - Alexandre D.
    • new diamond radiators - Richard J.
    • triplet polarimeter - Mike D.
    • tagger microscope - Richard J.
    • tagger hodoscope - Sasha S.
    • pair spectrometer - Sasha S
  5. Virtual spot uncertainties
  6. Updates on simulations
    • TAC run simulations
    • simulation of a fast raster
  7. Updates from the to-do list
    • refining the beam energy scale
    • PS analysis and acceptance
    • improved calibrations
  8. Any other business