August 5, 2022 Tech group meeting

From GlueXWiki
Revision as of 13:21, 4 August 2022 by Whitey (Talk | contribs) (Created page with "= Meeting Time and Place == Friday August 5, 2022 10:30am Hall D counting House and Teams == Agenda == * Safety - Bill Formichelli - Electrical * Last day to submit PR for...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Meeting Time and Place =

Friday August 5, 2022 10:30am Hall D counting House and Teams

Agenda

  • Safety - Bill Formichelli - Electrical
  • Last day to submit PR for FY 22, Aug 19
  • CPP removal/Primex install gant chart O:\halld_engineering\Installation Schedules\MS Projects
    • delayed until Aug 18, needs to be completed by Aug 26
  • Hall D current Tasks
    • FCAL Insert Module fabrication
      • brass straps
      • matching mu metal to steel shields - steel housings should arrive this morning - please bring for UHV cleaning
      • cutting tool
      • Tent move to EEL 108 - are the plastic strips up so we can move tables in and set up shelves?
    • Tagger NMR issues
  • FCAL Insert Drawings - 98% complete
    • need cooling pipe to chiller assy
    • need dark room mod for electronic patch panels, need to complete 0200 final assy dwg
    • need installation drawing
    • insert plexiglass
    • Tungsten
    • Procurement plan developed and started J:\Hall D\FCAL insert
    • Assemble FCAL2 step plates - arrived in ESB
    • order assembly hardware
  • New Profiler install - unlikely this go around
  • Controls
    • solenoid ramp - next time we ramp down to 800A
    • FDC chiller flow meter
  • DIRC Bar Box DP sensor
  • DIRC vacuum pump cooling water
  • General Maintenance
  • On Call -
  • ePAS Training and trial https://www.jlab.org/esh/epas

Action Items