(Created page with "= Meeting Time and Place == Friday August 5, 2022 10:30am Hall D counting House and Teams == Agenda == * Safety - Bill Formichelli - Electrical * Last day to submit PR for...")
 
(Agenda)
 
Line 7: Line 7:
 
* Safety -  Bill Formichelli - Electrical
 
* Safety -  Bill Formichelli - Electrical
 
* Last day to submit PR for FY 22, Aug 19
 
* Last day to submit PR for FY 22, Aug 19
 +
* Any new equipment or spares needed for 2023 operations? Alcohol refrig?
 
* CPP removal/Primex install gant chart O:\halld_engineering\Installation Schedules\MS Projects
 
* CPP removal/Primex install gant chart O:\halld_engineering\Installation Schedules\MS Projects
 
**  delayed until Aug 18, needs to be completed by Aug 26
 
**  delayed until Aug 18, needs to be completed by Aug 26

Latest revision as of 06:53, 5 August 2022

Meeting Time and Place =

Friday August 5, 2022 10:30am Hall D counting House and Teams

Agenda

  • Safety - Bill Formichelli - Electrical
  • Last day to submit PR for FY 22, Aug 19
  • Any new equipment or spares needed for 2023 operations? Alcohol refrig?
  • CPP removal/Primex install gant chart O:\halld_engineering\Installation Schedules\MS Projects
    • delayed until Aug 18, needs to be completed by Aug 26
  • Hall D current Tasks
    • FCAL Insert Module fabrication
      • brass straps
      • matching mu metal to steel shields - steel housings should arrive this morning - please bring for UHV cleaning
      • cutting tool
      • Tent move to EEL 108 - are the plastic strips up so we can move tables in and set up shelves?
    • Tagger NMR issues
  • FCAL Insert Drawings - 98% complete
    • need cooling pipe to chiller assy
    • need dark room mod for electronic patch panels, need to complete 0200 final assy dwg
    • need installation drawing
    • insert plexiglass
    • Tungsten
    • Procurement plan developed and started J:\Hall D\FCAL insert
    • Assemble FCAL2 step plates - arrived in ESB
    • order assembly hardware
  • New Profiler install - unlikely this go around
  • Controls
    • solenoid ramp - next time we ramp down to 800A
    • FDC chiller flow meter
  • DIRC Bar Box DP sensor
  • DIRC vacuum pump cooling water
  • General Maintenance
  • On Call -
  • ePAS Training and trial https://www.jlab.org/esh/epas

Action Items