Difference between revisions of "August 17, 2020 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
Line 19: Line 19:
 
# DIRC startup and production running (Bill, Justin, All)
 
# DIRC startup and production running (Bill, Justin, All)
 
#* [https://halldweb.jlab.org/wiki/images/4/45/GEM_TRD_setup_Aug2020.pdf TRD/GEM opportunity] (Lubomir, All)
 
#* [https://halldweb.jlab.org/wiki/images/4/45/GEM_TRD_setup_Aug2020.pdf TRD/GEM opportunity] (Lubomir, All)
#* New gain settings based on Time-Over-Threshold equalization (Andrew, Bill)
+
#* [https://halldweb.jlab.org/wiki/images/1/16/DIRC_TOT_UPDATE_AUG17.pdf New gain settings based on Time-Over-Threshold equalization] (Andrew, Bill)
 
# DIRC commissioning analyses and 2020 studies (All)
 
# DIRC commissioning analyses and 2020 studies (All)
 
#* Spring 2020 monitoring and data production status (Justin)
 
#* Spring 2020 monitoring and data production status (Justin)

Latest revision as of 12:24, 17 August 2020

Meeting Information

GlueX DIRC Meeting
Monday August 17, 2020
1:00 pm, EDT
Remote only

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements:
  2. DIRC startup and production running (Bill, Justin, All)
  3. DIRC commissioning analyses and 2020 studies (All)
    • Spring 2020 monitoring and data production status (Justin)
      • Production launch testing at NERSC ongoing
    • Geometric reconstruction update (Ahmed/Roman)
    • FastDIRC update (Yunjie)
  4. Follow-up on additional action items from workfest (All)
    • 100M event MC samples required for ρ and φ data/MC comparisons:
      • /volatile/halld/home/gxproj7/RunPeriod-2019-11/dircsim-2019_11-ver02/analysis/hd_root_gen_2pi_pass00.root
      • /volatile/halld/home/gxproj7/RunPeriod-2019-11/dircsim-2019_11-ver02/analysis/hd_root_gen_2k_pass00.root
  5. AOB