August 10, 2022 FCAL Insert Installation Meeting

From GlueXWiki
Revision as of 07:52, 15 August 2022 by Whitey (Talk | contribs) (Minutes)

Jump to: navigation, search

Meeting Time and Place

Wednesday August 10,2022 9:30am At Jefferson Lab, Hall D Counting House and on Teams

Agenda

Minutes

  • Presented the attached presentation covering schedule,space, equipment and manpower
  • Need to uncable DIRC and reroute gas lines
  • Need to come up with a detailed plan for Lead glass unstacking, refurb and restack (Sasha)
    • Materials needed
    • Manpower required
    • Equipment needed (shelving, tooling etc)
    • Space needed
    • include CCAL disassy and refurb modules
    • Include testing of all crystals inside hall
  • Discussion on attaching racks to platform - Tim to investigate
  • Maybe a good idea to do a 10x10 stack up to practice and see where the difficulties lie
  • Develop a very detailed procedure and schedule for the entire project including manpower (Tim/Scot)
  • Develop Cable map and labelling (Fernado)
    • Determine space where cables can be labelled as well as manpower
    • Investigate if additional trays are needed for additional crystal signal cables
    • will signal cables be light weight and thin?
    • Cabling mock up for center section
  • Need to include disa