Line 13: Line 13:
 
* Need to uncable DIRC and reroute gas lines
 
* Need to uncable DIRC and reroute gas lines
 
* Need to come up with a detailed plan for Lead glass unstacking, refurb and restack (Sasha)
 
* Need to come up with a detailed plan for Lead glass unstacking, refurb and restack (Sasha)
** Materials needed
+
** Materials needed (mylar, silicone sheets etc..)
 
** Manpower required
 
** Manpower required
 
** Equipment needed (shelving, tooling etc)
 
** Equipment needed (shelving, tooling etc)
 
** Space needed
 
** Space needed
 
** include CCAL disassy and refurb modules
 
** include CCAL disassy and refurb modules
 +
** Cookie inspection?
 
** Include testing of all crystals inside hall
 
** Include testing of all crystals inside hall
 +
** Include additional dividers for crystals
 +
** Help from detector support group?
 +
** FCAL used teflon sheet to slide upper modules into place
 
* Discussion on attaching racks to platform - Tim to investigate
 
* Discussion on attaching racks to platform - Tim to investigate
 
* Maybe a good idea to do a 10x10 stack up to practice and see where the difficulties lie
 
* Maybe a good idea to do a 10x10 stack up to practice and see where the difficulties lie
Line 24: Line 28:
 
* Develop Cable map and labelling (Fernado)
 
* Develop Cable map and labelling (Fernado)
 
** Determine space where cables can be labelled as well as manpower
 
** Determine space where cables can be labelled as well as manpower
** Investigate if additional trays are needed for additional crystal signal cables
+
** Investigate if additional cable trays are needed for additional crystal signal cables
 
** will signal cables be light weight and thin?
 
** will signal cables be light weight and thin?
 
** Cabling mock up for center section
 
** Cabling mock up for center section
* Need to include disa
+
** How many new racks are needed?
 +
* Matt to go through spare parts he has and send needed stuff to JLAB.
 +
** plastic crates for modules
 +
** assembled modules

Revision as of 08:01, 15 August 2022

Meeting Time and Place

Wednesday August 10,2022 9:30am At Jefferson Lab, Hall D Counting House and on Teams

Agenda

Minutes

  • Presented the attached presentation covering schedule,space, equipment and manpower
  • Need to uncable DIRC and reroute gas lines
  • Need to come up with a detailed plan for Lead glass unstacking, refurb and restack (Sasha)
    • Materials needed (mylar, silicone sheets etc..)
    • Manpower required
    • Equipment needed (shelving, tooling etc)
    • Space needed
    • include CCAL disassy and refurb modules
    • Cookie inspection?
    • Include testing of all crystals inside hall
    • Include additional dividers for crystals
    • Help from detector support group?
    • FCAL used teflon sheet to slide upper modules into place
  • Discussion on attaching racks to platform - Tim to investigate
  • Maybe a good idea to do a 10x10 stack up to practice and see where the difficulties lie
  • Develop a very detailed procedure and schedule for the entire project including manpower (Tim/Scot)
  • Develop Cable map and labelling (Fernado)
    • Determine space where cables can be labelled as well as manpower
    • Investigate if additional cable trays are needed for additional crystal signal cables
    • will signal cables be light weight and thin?
    • Cabling mock up for center section
    • How many new racks are needed?
  • Matt to go through spare parts he has and send needed stuff to JLAB.
    • plastic crates for modules
    • assembled modules