Difference between revisions of "August 10, 2022 FCAL Insert Installation Meeting"

From GlueXWiki
Jump to: navigation, search
(Minutes)
(Minutes)
Line 13: Line 13:
 
* Need to uncable DIRC and reroute gas lines
 
* Need to uncable DIRC and reroute gas lines
 
* Need to come up with a detailed plan for Lead glass unstacking, refurb and restack (Sasha)
 
* Need to come up with a detailed plan for Lead glass unstacking, refurb and restack (Sasha)
 +
** Materials needed
 +
** Manpower required
 +
** Equipment needed (shelving, tooling etc)
 +
** Space needed
 +
* Discussion on attaching racks to platform - Tim to investigate
 +
* Maybe a good idea to do a 10x10 stack up to practice and see where the difficulties lie
 +
* Develop a very detailed procedure and schedule for the entire project including manpower (Tim/Scot)
 +
* Develop Cable map and labelling (Fernado)
 +
** Determine space where cables can be labelled as well as manpower
 +
** Investigate if additional trays are needed for additional crystal signal cables
 +
** will signal cables be light weight and thin?
 +
** Cabling mock up for center section

Revision as of 07:50, 15 August 2022

Meeting Time and Place

Wednesday August 10,2022 9:30am At Jefferson Lab, Hall D Counting House and on Teams

Agenda

Minutes

  • Presented the attached presentation covering schedule,space, equipment and manpower
  • Need to uncable DIRC and reroute gas lines
  • Need to come up with a detailed plan for Lead glass unstacking, refurb and restack (Sasha)
    • Materials needed
    • Manpower required
    • Equipment needed (shelving, tooling etc)
    • Space needed
  • Discussion on attaching racks to platform - Tim to investigate
  • Maybe a good idea to do a 10x10 stack up to practice and see where the difficulties lie
  • Develop a very detailed procedure and schedule for the entire project including manpower (Tim/Scot)
  • Develop Cable map and labelling (Fernado)
    • Determine space where cables can be labelled as well as manpower
    • Investigate if additional trays are needed for additional crystal signal cables
    • will signal cables be light weight and thin?
    • Cabling mock up for center section