Difference between revisions of "April 5, 2018 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
(5 intermediate revisions by 3 users not shown)
Line 21: Line 21:
 
#* Roll fixture testing
 
#* Roll fixture testing
 
# Bar box transportation
 
# Bar box transportation
#* Crate fabrication
+
#* Crate fabrication (John)
 
#* Monitoring system procurements
 
#* Monitoring system procurements
#* Meeting with SLAC April 12
+
#** At JLab: 2 additional switches and 6 additional cameras (assembly with plates in progress)
 +
#** Expect LORD accelerometers and base station delivered next week
 +
#** LED strips
 +
#* Meeting with SLAC April 12 @ 4 pm ET
 +
#** Any documents needed for discussion: layout of crates, etc. in trailer for SLAC loading plan?
 
# Optical box
 
# Optical box
 
#* Status update (Ernie and Jason)
 
#* Status update (Ernie and Jason)
Line 29: Line 33:
 
#** PMT test fixture
 
#** PMT test fixture
 
#** Other items and quotes
 
#** Other items and quotes
# Simulation studies ([https://gluexdirc.mit.edu/dirc-time-imaging-reco Maria] and Roman)  
+
# Simulation studies ([https://gluexdirc.mit.edu/dirc-time-imaging-reco Maria] [https://gluexdirc.mit.edu/dirc-1d-separation-power-lut 1] and Roman [https://web-docs.gsi.de/~rdzhigad/www/research/pik-sep-power-updated (update on geometrical reconstruction)])))  
# MAPMT testing (Bill)
+
# MAPMT testing ([https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3581 Bill])
 
# AOB
 
# AOB

Latest revision as of 09:52, 5 April 2018

Meeting Information

GlueX DIRC Meeting
Thursday April 5, 2018
10:00 am, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
    • Fall 2018 schedule?
  2. Support structure update (John, Tim, Mark)
    • Roll fixture testing
  3. Bar box transportation
    • Crate fabrication (John)
    • Monitoring system procurements
      • At JLab: 2 additional switches and 6 additional cameras (assembly with plates in progress)
      • Expect LORD accelerometers and base station delivered next week
      • LED strips
    • Meeting with SLAC April 12 @ 4 pm ET
      • Any documents needed for discussion: layout of crates, etc. in trailer for SLAC loading plan?
  4. Optical box
    • Status update (Ernie and Jason)
      • Box production at Lesker
      • PMT test fixture
      • Other items and quotes
  5. Simulation studies (Maria 1 and Roman (update on geometrical reconstruction))))
  6. MAPMT testing (Bill)
  7. AOB