Difference between revisions of "April 30, 2019 DIRC"

From GlueXWiki
Jump to: navigation, search
(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Tuesday April 30, 2019<br> 1:00 pm, EDT<br> JLab F326 <br> == Connection Using Bluejeans == # To join via Polycom room syste...")
 
(Agenda)
 
(8 intermediate revisions by 3 users not shown)
Line 20: Line 20:
 
# Summer installation planning:
 
# Summer installation planning:
 
#* Window for upper box (Ernie)
 
#* Window for upper box (Ernie)
#* Ongoing ar box light tightness work (All)
+
#* Ongoing bar box light tightness work (Mark/Bill/All [https://halldweb.jlab.org/DocDB/0035/003581/002/DIRC_meeting_Apr_30.pdf])
#* Cookies update] (Yunjie/Maria)
+
#* Cookies (Yunjie/Maria)
 
#* Plans for tests with LED fibers and canullas (Bill/Fernando)
 
#* Plans for tests with LED fibers and canullas (Bill/Fernando)
 +
#* All DIRC equipment removed form EEL126 for renovation
 +
# Documentation
 +
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3974 Comprehensive writeup (Maria)]
 +
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3983 Cookies (Maria)]
 
# [[Spring 2019 DIRC Commissioning]] (All)
 
# [[Spring 2019 DIRC Commissioning]] (All)
#* Half of REST data processed with updated dirc_tree plugin. Disk failure prematurely ended the processing this past weekend
+
#* Half of REST data processed with updated dirc_tree plugin (ver08_pass04). Disk failure on JLab farm prematurely ended the processing this past weekend.
#** dirc_tree plugin  (Roman/Ahmed/All)
+
#** Files located at /volatile/halld/home/jrsteven/RunPeriod-2019-01/dirc_monitoring/analysis_REST/ver08_pass04/merged/
#* LED data analysis and comparison to laser test stand data (Bill/Andrew)
+
#* Another pass will begin shortly to finish processing the full dataset
 +
#* Reconstruction with FastDIRC ([https://halldweb.jlab.org/wiki/images/b/b1/FastDIRC_recon_043019.pdf Yunjie])
 +
#* [http://web-docs.gsi.de/~aali/dirc_1.pdf Commissioning analyses (Ahmed)]
 
# Software/simulations
 
# Software/simulations
 
#* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
 
#* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)

Latest revision as of 14:48, 30 April 2019

Meeting Information

GlueX DIRC Meeting
Tuesday April 30, 2019
1:00 pm, EDT
JLab F326

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Summer installation planning:
    • Window for upper box (Ernie)
    • Ongoing bar box light tightness work (Mark/Bill/All [2])
    • Cookies (Yunjie/Maria)
    • Plans for tests with LED fibers and canullas (Bill/Fernando)
    • All DIRC equipment removed form EEL126 for renovation
  3. Documentation
  4. Spring 2019 DIRC Commissioning (All)
    • Half of REST data processed with updated dirc_tree plugin (ver08_pass04). Disk failure on JLab farm prematurely ended the processing this past weekend.
      • Files located at /volatile/halld/home/jrsteven/RunPeriod-2019-01/dirc_monitoring/analysis_REST/ver08_pass04/merged/
    • Another pass will begin shortly to finish processing the full dataset
    • Reconstruction with FastDIRC (Yunjie)
    • Commissioning analyses (Ahmed)
  5. Software/simulations
    • Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
    • FastDIRC geometry implementation and alignment work (Cris/Yunjie)
  6. Software overview and tasks (All)
  7. AOB