Difference between revisions of "April 22, 2022 Tech group SAD meeting"

From GlueXWiki
Jump to: navigation, search
(Created page with "= Meeting Time and Place == Friday April 22 2022 10:30am Hall D Counting House and Teams == Agenda == * Safety - * Hall D SAD Tasks Media:SAD2022_Acc_schedule.pdf ** CPP...")
 
(Agenda)
Line 9: Line 9:
 
*** Microscope move/Hodoscope  - poly shieldingcomplete [[image:hodo7.png|thumb]]
 
*** Microscope move/Hodoscope  - poly shieldingcomplete [[image:hodo7.png|thumb]]
 
*** Moveable Lead absorber - Tim to Write procedure
 
*** Moveable Lead absorber - Tim to Write procedure
*** Target - Bobby - fit check - need drawings
+
*** Target - Bobby - fit check - need drawings [[image:Target-cartridge-lead.png|thumb]]
 
*** Gas - Scot
 
*** Gas - Scot
 
*** Helium bag [[image:He_bag.jpg|thumb]]
 
*** Helium bag [[image:He_bag.jpg|thumb]]
Line 25: Line 25:
 
* FCAL Insert Drawings
 
* FCAL Insert Drawings
 
* New Profiler install
 
* New Profiler install
* New 3x3 CCAL for TAC [[Media:CPP_TAC.pdf]]
+
* New 3x3 CCAL for TAC [[Media:CPP_TAC.pdf]][[image:TAC-3x3.png|thumb]]  
 
* Tagger Radiator Mod [[Media:Fork_mod.pdf]]
 
* Tagger Radiator Mod [[Media:Fork_mod.pdf]]
 
* Controls
 
* Controls

Revision as of 09:19, 22 April 2022

Meeting Time and Place =

Friday April 22 2022 10:30am Hall D Counting House and Teams

Agenda

  • Safety -
  • Hall D SAD Tasks Media:SAD2022_Acc_schedule.pdf
    • CPP INstall O:\halld_engineering\Installation Schedules
      • Microscope move/Hodoscope - poly shieldingcomplete
        Hodo7.png
      • Moveable Lead absorber - Tim to Write procedure
      • Target - Bobby - fit check - need drawings
        Target-cartridge-lead.png
      • Gas - Scot
      • Helium bag
        He bag.jpg
    • PS Parasitic Detectors stages
    • FCAL Insert Module fabrication
      • 40 brass straps per week needed
      • matching mu metal to steel shields
      • cutting tool
    • Tagger NMR repair - Scot
    • Tagger controls UPS
    • BCAL Coldshot Chiller commissioning - Josh
    • Target/Goni Turbo repair - Keith
    • TEDF move in May to EEL stockroom area
  • JT file creation - Anthony gave presentation - file and instructions on O drive
  • FCAL Insert Drawings
  • New Profiler install
  • New 3x3 CCAL for TAC Media:CPP_TAC.pdf
    TAC-3x3.png
  • Tagger Radiator Mod Media:Fork_mod.pdf
  • Controls
    • Solenoid vacuum controls
  • General Maintenance
  • On Call - Scot
  • ePAS Training and trial https://www.jlab.org/esh/epas

Action Items

  • Set up next PS parasitic meeting
  • Decide on Goni maintenance
  • Delineate ePAS permit requests for Isolation Certificate