Difference between revisions of "April 22, 2016 PID Upgrade"

From GlueXWiki
Jump to: navigation, search
Line 19: Line 19:
 
# Announcements
 
# Announcements
 
# Optical box design update (MIT):
 
# Optical box design update (MIT):
# [[https://gluexdirc.mit.edu/superposition-3-fibers-sig-15-inc-6#overlay-context=superposition-3-fibers-sig-10-inc-5 | Calibration]]
+
# [[https://gluexdirc.mit.edu/superposition-3-fibers-sig-15-inc-6#overlay-context=superposition-3-fibers-sig-10-inc-5| Calibration]]
 
# Bar box shipping (John and Matt)
 
# Bar box shipping (John and Matt)
 
# Support structure design update (IU)
 
# Support structure design update (IU)
 
# [[DIRC Planning for FY16|Planning for FY16]]
 
# [[DIRC Planning for FY16|Planning for FY16]]
 
# AOB
 
# AOB

Revision as of 14:27, 21 April 2016

Meeting Information

GlueX PID Upgrade Meeting
Friday, April 22, 2016
11 am, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Optical box design update (MIT):
  3. [Calibration]
  4. Bar box shipping (John and Matt)
  5. Support structure design update (IU)
  6. Planning for FY16
  7. AOB