Difference between revisions of "April 16, 2019 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
 
(3 intermediate revisions by 2 users not shown)
Line 20: Line 20:
 
# Summer installation planning:
 
# Summer installation planning:
 
#* Window for upper box (Ernie)
 
#* Window for upper box (Ernie)
#* Plans for tests with LED fibers and canullas (Bill/Fernando)
 
 
#* [https://halldweb.jlab.org/wiki/index.php/Bar_box_darkening_procedure Plans for making bar boxes light tight] (All)
 
#* [https://halldweb.jlab.org/wiki/index.php/Bar_box_darkening_procedure Plans for making bar boxes light tight] (All)
 +
#** Reminder of the problem from LED data today [https://logbooks.jlab.org/entry/3679281 Logbook]
 +
#* [https://halldweb.jlab.org/wiki/index.php/File:DIRC_weekly_April16_small.pdf Cookies update] (Yunjie/Maria)
 +
#* Plans for tests with LED fibers and canullas ([https://halldweb.jlab.org/DocDB/0035/003581/002/DIRC_meeting_Apr_16.pdf Bill/Fernando])
 
# [[Spring 2019 DIRC Commissioning]] (All)
 
# [[Spring 2019 DIRC Commissioning]] (All)
 
#* Next pass over REST with plugins to make ROOT TTrees: dirc_reactions,dirc_tree,ReactionFilter  
 
#* Next pass over REST with plugins to make ROOT TTrees: dirc_reactions,dirc_tree,ReactionFilter  
Line 28: Line 30:
 
# Software/simulations
 
# Software/simulations
 
#* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
 
#* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
#* Cookies update (Maria)
 
 
#* FastDIRC geometry implementation and alignment work (Cris/[https://halldweb.jlab.org/wiki/images/2/25/FastDIRC_integration_041619.pdf Yunjie])
 
#* FastDIRC geometry implementation and alignment work (Cris/[https://halldweb.jlab.org/wiki/images/2/25/FastDIRC_integration_041619.pdf Yunjie])
 
# Software [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Overview overview] and [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Tasks tasks] (All)
 
# Software [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Overview overview] and [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Tasks tasks] (All)
 
# AOB
 
# AOB

Latest revision as of 12:48, 16 April 2019

Meeting Information

GlueX DIRC Meeting
Tuesday April 16, 2019
1:00 pm, EDT
JLab F326

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Summer installation planning:
  3. Spring 2019 DIRC Commissioning (All)
    • Next pass over REST with plugins to make ROOT TTrees: dirc_reactions,dirc_tree,ReactionFilter
      • What changes are needed to plugins/analysis before processing can begin? (Roman/Ahmed/All)
    • LED data analysis and comparison to laser test stand data (Bill/Andrew)
  4. Software/simulations
    • Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
    • FastDIRC geometry implementation and alignment work (Cris/Yunjie)
  5. Software overview and tasks (All)
  6. AOB