April 1, 2022 Tech group SAD meeting

From GlueXWiki
Revision as of 08:29, 1 April 2022 by Whitey (Talk | contribs) (Agenda)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Meeting Time and Place =

Friday April 1, 2022 10:30am Hall D Counting House and Teams

Agenda

  • Safety - fuel spill
  • OccMed DR on site now
  • Run around May 25
  • Hall D SAD Tasks Media:SAD2022_Acc_schedule.pdf
    • CPP INstall O:\halld_engineering\Installation Schedules
    • PS Parasitic Detectors stages
    • FCAL Insert Module fabrication
      • 40 brass straps per week needed
      • matching mu metal to steel shields
      • cutting tool
    • Tagger NMR repair - Scot
    • FDC chiller repair - Josh
    • BCAL Coldshot Chiller commissioning - Josh
    • Target Turbo repair - Keith
    • TEDF move in May to EEL stockroom area
  • JT file creation
  • FCAL Insert Drawings
  • New Polarimeter install
  • New 3x3 CCAL for TAC Media:CPP_TAC.pdf
  • Controls
    • Solenoid vacuum controls
  • General Maintenance
  • On Call - Scot
  • ePAS Training and trial https://www.jlab.org/esh/epas

Action Items

  • Set up next PS parasitic meeting
  • Decide on Goni maintenance
  • Delineate ePAS permit requests for Isolation Certificate