Difference between revisions of "April 1, 2022 Tech group SAD meeting"

From GlueXWiki
Jump to: navigation, search
(Created page with "= Meeting Time and Place == Friday April 1, 2022 10:30am Hall D Counting House and Teams == Agenda == * Safety - fuel spill * Hall D SAD Tasks Media:SAD2022_Acc_schedule.pd...")
 
(Agenda)
Line 9: Line 9:
 
*** Microscope move/Hodoscope plate #7
 
*** Microscope move/Hodoscope plate #7
 
*** Moveable Lead absorber
 
*** Moveable Lead absorber
*** Target - Bobby
+
*** Target - Bobby [[image:CPP_Target_fid.png|thumb]]
 
*** Gas - Scot
 
*** Gas - Scot
 
*** Helium bag [[Media:CPP_He_Bag.pdf]]
 
*** Helium bag [[Media:CPP_He_Bag.pdf]]

Revision as of 08:07, 1 April 2022

Meeting Time and Place =

Friday April 1, 2022 10:30am Hall D Counting House and Teams

Agenda

  • Safety - fuel spill
  • Hall D SAD Tasks Media:SAD2022_Acc_schedule.pdf
    • CPP INstall O:\halld_engineering\Installation Schedules
    • Goniometer Maintenance/Diamonds - use existing diamonds - grease stage?
    • FDC and Target heat exchanger - Josh
    • PS Parasitic Detectors stages
    • FCAL Insert Module fabrication
      • 40 brass straps per week needed
      • Honing test a few steel shields
      • Sasha wants help matching mu metal to steel shields
    • Tagger NMR repair - Scot
    • FDC chiller repair - Josh
    • BCAL Coldshot Chiller commissioning - Josh
    • Target Turbo repair - Keith
    • TEDF move in late April to EEL stockroom area
  • JT file creation
  • FCAL Insert Drawings
  • Controls
    • Solenoid vacuum controls
  • General Maintenance
  • On Call - Chris
  • ePAS Training and trial https://www.jlab.org/esh/epas

Action Items

  • Set up PS parasitic meeting
  • Decide on Goni maintenance
  • Delineate ePAS permit requests for CPP install HDList