Difference between revisions of "April 07, 2022 CPP Design/Install Meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
 
Line 27: Line 27:
 
* Adjustable Lead - what is the plan for usage? [[image:Adj_Lead.png|thumb]]
 
* Adjustable Lead - what is the plan for usage? [[image:Adj_Lead.png|thumb]]
 
* Helium Bag inside CDC [[Media:Hebag.jpg]]
 
* Helium Bag inside CDC [[Media:Hebag.jpg]]
 +
 +
== Minutes ==
 +
* Decided an OSP is needed since this is not baseline equipment. Still keep in ESAD - Elton
 +
* Rory requested practice for moving adjustable lead absorber -
 +
** Tim to write procedure
 +
** Should only need to move early in calibration mode
 +
** Tim will talk to Dave Hamlette about being able to adjust the lead without Radcon present
 +
* Six signal cables are in house and being tested
 +
* Target and helium bag
 +
** Simon and Beni would like the geometry of the target/thin windows and helium bag layout
 +
** OK to proceed with helium bag design with PVC plastic tube at upstream end

Latest revision as of 13:34, 21 April 2022

Meeting Time and Place

Thursday April 07, 2022, 3:00pm

Zoom Meeting

https://jlab-org.zoomgov.com/j/1602846419?pwd=YTNEeXI3aHBKSERjMGpsTVJZd25sQT09&from=addon

Meeting ID: 160 284 6419
  Passcode: 459361
  • Invited - Elton, Dave, Stephanie, Ilya, Rory, Mark S, Beni, Simon, Mark I, Anthony, Alex S., Eugene

Agenda

Minutes

  • Decided an OSP is needed since this is not baseline equipment. Still keep in ESAD - Elton
  • Rory requested practice for moving adjustable lead absorber -
    • Tim to write procedure
    • Should only need to move early in calibration mode
    • Tim will talk to Dave Hamlette about being able to adjust the lead without Radcon present
  • Six signal cables are in house and being tested
  • Target and helium bag
    • Simon and Beni would like the geometry of the target/thin windows and helium bag layout
    • OK to proceed with helium bag design with PVC plastic tube at upstream end