Difference between revisions of "Apr 21"

From GlueXWiki
Jump to: navigation, search
Line 4: Line 4:
 
* TOF crates booted
 
* TOF crates booted
 
* working on trigger through GTP
 
* working on trigger through GTP
 +
  
 
== FCAL Update ==
 
== FCAL Update ==

Revision as of 11:47, 21 April 2014

DAQ

  • 5 ADCs swapped on FCAL S6 daq, not yet working (old firmware)
  • F1 readout within a week or two
  • TOF crates booted
  • working on trigger through GTP


FCAL Update

  • detector 100% working
  • Update [1]


BCAL Update

  • Detector has 100% HV now working
  • About to begin full 4 crate testing