Difference between revisions of "2021-08-26"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 15: Line 15:
  
 
# Announcements
 
# Announcements
#* Start of run is September 6 (Eugene/Alexandre)
+
#* Start of run is delayed to September 6 (Eugene/Alexandre)
#* [https://mailman.jlab.org/pipermail/halld/2021-August/000905.html Access to the Lab]
+
#* [https://mailman.jlab.org/pipermail/halld/2021-August/000905.html Access to the Lab] (Eugene)
 
#* September Collaboration meeting 9/22 - 9/24 will be online:  [https://misportal.jlab.org/Ul/conferences/generic_conference/registration.cfm?conference_id=COLLAB-GLUEX-SEP21 please register]
 
#* September Collaboration meeting 9/22 - 9/24 will be online:  [https://misportal.jlab.org/Ul/conferences/generic_conference/registration.cfm?conference_id=COLLAB-GLUEX-SEP21 please register]
 
# PrimEx run preparations (Sasha)
 
# PrimEx run preparations (Sasha)

Revision as of 09:46, 26 August 2021

Meeting Coordinates

The meeting will be on Thursday, August 26, 2021 at 11:00 AM EST.

Connecting

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
  3. To join via phone, use one of the following numbers and the Conference ID: 660743227.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
    • Start of run is delayed to September 6 (Eugene/Alexandre)
    • Access to the Lab (Eugene)
    • September Collaboration meeting 9/22 - 9/24 will be online: please register
  2. PrimEx run preparations (Sasha)
  3. Hall and hot checkout status (Tim)
  4. Preparations for Shifts
  5. Update on CPP (Elton)
  6. Update on GlueX-II production, calibration, and monitoring (Igal)
  7. Specific areas where specialized help is needed -- contact Matt if you are interested in contributing to these
    • TAGH calibration, PS calibration, hardware maintenance, etc.
    • Systematic studies of kinematic fitting, efficiency of chi^2 cuts, etc., in data and MC
      • maintenance of kinematic fitting framework
    • Development of offsite data processing systems
    • Maintenance of online monitoring tools (rootspy or full transition to hydra)

Additional brief reports from working groups as needed