Difference between revisions of "2021-08-26"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Additional brief reports from working groups as needed)
 
(6 intermediate revisions by one other user not shown)
Line 15: Line 15:
  
 
# Announcements
 
# Announcements
#* Start of run is September 4 (Eugene)
+
#* Start of run is delayed to September 7 (Eugene/Alexandre)
 +
#* [https://mailman.jlab.org/pipermail/halld/2021-August/000905.html Access to the Lab - new requirements] (Eugene)
 +
#** [https://misportal.jlab.org/vaccinations Link to upload vaccination cards]
 
#* September Collaboration meeting 9/22 - 9/24 will be online:  [https://misportal.jlab.org/Ul/conferences/generic_conference/registration.cfm?conference_id=COLLAB-GLUEX-SEP21 please register]
 
#* September Collaboration meeting 9/22 - 9/24 will be online:  [https://misportal.jlab.org/Ul/conferences/generic_conference/registration.cfm?conference_id=COLLAB-GLUEX-SEP21 please register]
 
# PrimEx run preparations (Sasha)
 
# PrimEx run preparations (Sasha)
Line 22: Line 24:
 
# Preparations for Shifts
 
# Preparations for Shifts
 
#* [https://forms.gle/WSYJXiRZsdqg3Eci7 Required Reading for Remote Shifters]
 
#* [https://forms.gle/WSYJXiRZsdqg3Eci7 Required Reading for Remote Shifters]
 +
#* [https://halldweb.jlab.org/hdops/wiki/index.php/Guidelines_for_Remote_Worker_Shift Instructions for Remote Shifters]
 
#* remote shift connection demonstration planned for Thursday, Sept. 2 at 11A  (Beni/Matt)
 
#* remote shift connection demonstration planned for Thursday, Sept. 2 at 11A  (Beni/Matt)
 
#* local experts are encouraged to sign up for the [https://mailman.jlab.org/mailman/listinfo/Gluex_shift_standby gluex_shift_standby mailing list] (Naomi)
 
#* local experts are encouraged to sign up for the [https://mailman.jlab.org/mailman/listinfo/Gluex_shift_standby gluex_shift_standby mailing list] (Naomi)
Line 38: Line 41:
 
** Production and Analysis Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/August_25,_2021,_Analysis_Working_Group August 25, 2021] (Alex)
 
** Production and Analysis Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/August_25,_2021,_Analysis_Working_Group August 25, 2021] (Alex)
 
** Offline Meeting:  last meet [[GlueX_Software_Meeting,_August_17,_2021 | August 17, 2021]] (Mark)
 
** Offline Meeting:  last meet [[GlueX_Software_Meeting,_August_17,_2021 | August 17, 2021]] (Mark)
 +
*** [https://markito3.wordpress.com/2021/08/26/gluex-meeting-report-august-26-2021/ Mark's Notes]
 
** Particle ID Working Group: [[GlueX_PID_Meeting,_August_24,_2021 | August 24, 2021]] (Simon)
 
** Particle ID Working Group: [[GlueX_PID_Meeting,_August_24,_2021 | August 24, 2021]] (Simon)
  

Latest revision as of 11:09, 26 August 2021

Meeting Coordinates

The meeting will be on Thursday, August 26, 2021 at 11:00 AM EST.

Connecting

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
  3. To join via phone, use one of the following numbers and the Conference ID: 660743227.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. PrimEx run preparations (Sasha)
  3. Hall and hot checkout status (Tim)
  4. Preparations for Shifts
  5. Update on CPP (Elton)
  6. Update on GlueX-II production, calibration, and monitoring (Igal)
  7. Specific areas where specialized help is needed -- contact Matt if you are interested in contributing to these
    • TAGH calibration, PS calibration, hardware maintenance, etc.
    • Systematic studies of kinematic fitting, efficiency of chi^2 cuts, etc., in data and MC
      • maintenance of kinematic fitting framework
    • Development of offsite data processing systems
    • Maintenance of online monitoring tools (rootspy or full transition to hydra)

Additional brief reports from working groups as needed