Difference between revisions of "2021-08-12"

From GlueXWiki
Jump to: navigation, search
m (Shepherd moved page 2021-08-11 to 2021-08-12)
(Additional brief reports from working groups as needed: add Mark's notes)
 
Line 37: Line 37:
 
** Production and Analysis Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/August_11,_2021,_Analysis_Working_Group August 11, 2021] (Alex)
 
** Production and Analysis Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/August_11,_2021,_Analysis_Working_Group August 11, 2021] (Alex)
 
** Offline Meeting:  last meet [[GlueX_Software_Meeting,_July_20,_2021 | July 20, 2021]] (Mark)
 
** Offline Meeting:  last meet [[GlueX_Software_Meeting,_July_20,_2021 | July 20, 2021]] (Mark)
 +
*** [https://markito3.wordpress.com/2021/08/11/gluex-meeting-report-august-12-2021/ Mark's Notes]
 
** Particle ID Working Group: last meeting was [[GlueX_PID_Meeting,_August_10,_2021 | August 10, 2021]] (Simon)
 
** Particle ID Working Group: last meeting was [[GlueX_PID_Meeting,_August_10,_2021 | August 10, 2021]] (Simon)
  

Latest revision as of 21:07, 11 August 2021

Meeting Coordinates

The meeting will be on Thursday, August 12, 2021 at 11:00 AM EST.

Connecting

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
  3. To join via phone, use one of the following numbers and the Conference ID: 660743227.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
    • Start of Summer 2021 run is August 23 (Eugene)
    • September Collaboration meeting 9/22 - 9/24 will be online (Matt)
    • JSA Initiatives Funds -- proposals due 8/27 (?)
  2. Updates concerning MEDCON levels or site access (Eugene)
  3. Preparation for the PrimEx run (Sasha)
  4. Run preparation engineering update (Tim)
  5. Guidance for remote shifters is available (Matt)
  6. Update on CPP (Elton)
  7. Update on GlueX-II production, calibration, and monitoring (Igal)
  8. Specific areas where specialized help is needed -- contact Matt if you are interested in contributing to these
    • TAGH calibration, PS calibration, hardware maintenance, etc.
    • Systematic studies of kinematic fitting, efficiency of chi^2 cuts, etc., in data and MC
      • maintenance of kinematic fitting framework
    • Development of offsite data processing systems
    • Maintenance of online monitoring tools (rootspy or full transition to hydra)

Additional brief reports from working groups as needed