Difference between revisions of "2014-05-28"
From GlueXWiki
(→Announcements) |
m (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/") |
||
(11 intermediate revisions by 4 users not shown) | |||
Line 18: | Line 18: | ||
== Agenda == | == Agenda == | ||
=== Announcements === | === Announcements === | ||
− | |||
− | === | + | === Ongoing Activities === |
− | * [https:// | + | * [https://halldweb.jlab.org/wiki/index.php/StatusTable TDR Status] |
− | * [ | + | * Solenoid Current Studies |
− | * [[ | + | * Hall D Readiness Review. See [https://hdops.jlab.org Documentation for Shifts] |
+ | * [[PAC Proposals]] | ||
=== Reports from Technical Groups === | === Reports from Technical Groups === | ||
− | * Calorimeters: [[ | + | * Calorimeters: [[May 22, 2014 Calorimetry | May 22, 2014]] |
+ | ** FCAL | ||
** BCAL | ** BCAL | ||
− | ** | + | ** BCAL Reconstruction [[BCAL Reconstruction Meeting 2014-05-06 | May 6, 2014]] |
− | * Tracking [[ | + | * Tracking [[Minutes-5-22-2014|Joint FDC/CDC Meeting May. 22, 2014]] |
** CDC | ** CDC | ||
** FDC | ** FDC | ||
− | ** FADC FPGA [[ | + | ** FADC FPGA [[FADC_Data_Format_May_20,_2014 |May 20, 2014]] |
* PID | * PID | ||
− | ** TOF [[GlueX TOF Meeting, | + | ** TOF [[GlueX TOF Meeting, May 22, 2014|May 22, 2014]] |
** Start Counter [[GlueX Start Counter Meeting, April 17, 2014#Minutes|April 3, 2014]] | ** Start Counter [[GlueX Start Counter Meeting, April 17, 2014#Minutes|April 3, 2014]] | ||
** PID Upgrades [[April 25, 2014 PID Upgrade|May 2, 2014]] | ** PID Upgrades [[April 25, 2014 PID Upgrade|May 2, 2014]] | ||
Line 44: | Line 45: | ||
* Electronics | * Electronics | ||
* Trigger | * Trigger | ||
− | ** Hardware (Level-1) [[OWG Meeting | + | ** Hardware (Level-1) [[OWG Meeting 21-May-2014 |May 21, 2014]] |
− | ** Software (Level-3) [[ | + | ** Software (Level-3) [[May 27, 2014| May 27, 2014]] |
* DAQ/Monitoring/Controls [[OWG Meeting 23-Apr-2014 |April 23, 2014]] | * DAQ/Monitoring/Controls [[OWG Meeting 23-Apr-2014 |April 23, 2014]] | ||
* Offline Software | * Offline Software | ||
** Offline [[GlueX Offline Meeting, April 16, 2014|April 16, 2014]] | ** Offline [[GlueX Offline Meeting, April 16, 2014|April 16, 2014]] | ||
** Data Challenge Meeting [[GlueX Data Challenge Meeting, April 11, 2014|April 11, 2014]] | ** Data Challenge Meeting [[GlueX Data Challenge Meeting, April 11, 2014|April 11, 2014]] | ||
− | ** Calibration [[ | + | ** Calibration [[May 21, 2014 Calibration| May 21, 2014]] |
* Photon Beam and Tagger [[BLTWG Meeting 04/28/2014|April 28, 2014]] | * Photon Beam and Tagger [[BLTWG Meeting 04/28/2014|April 28, 2014]] | ||
− | * Physics [[ | + | * Physics [[May 19, 2014, Physics Working Group|May 19, 2014]] |
Latest revision as of 11:29, 31 March 2015
Contents
Meeting Time and Place
The meeting will be on Wednesday May 28, 2014 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
Announcements
Ongoing Activities
- TDR Status
- Solenoid Current Studies
- Hall D Readiness Review. See Documentation for Shifts
- PAC Proposals
Reports from Technical Groups
- Calorimeters: May 22, 2014
- FCAL
- BCAL
- BCAL Reconstruction May 6, 2014
- Tracking Joint FDC/CDC Meeting May. 22, 2014
- CDC
- FDC
- FADC FPGA May 20, 2014
- PID
- TOF May 22, 2014
- Start Counter April 3, 2014
- PID Upgrades May 2, 2014
- Engineering
- Magnets
- Target
- Engineering Activities
- Installation
- Electronics
- Trigger
- Hardware (Level-1) May 21, 2014
- Software (Level-3) May 27, 2014
- DAQ/Monitoring/Controls April 23, 2014
- Offline Software
- Offline April 16, 2014
- Data Challenge Meeting April 11, 2014
- Calibration May 21, 2014
- Photon Beam and Tagger April 28, 2014
- Physics May 19, 2014