Difference between revisions of "2011-08-10"
From GlueXWiki
(10 intermediate revisions by 2 users not shown) | |||
Line 22: | Line 22: | ||
3.) EVO: | 3.) EVO: | ||
A conference has been booked under "GlueX" from 10:00am until 1:00pm (EST). | A conference has been booked under "GlueX" from 10:00am until 1:00pm (EST). | ||
+ | |||
== Agenda == | == Agenda == | ||
Line 30: | Line 31: | ||
*** FIU | *** FIU | ||
*** UVA | *** UVA | ||
− | |||
*** UMass | *** UMass | ||
− | *** | + | *** Mephi |
** [[Private:Construction |Construction Contracts]] | ** [[Private:Construction |Construction Contracts]] | ||
− | *** | + | *** Athens |
*** FSU | *** FSU | ||
*** CUA | *** CUA | ||
* Beam Tests | * Beam Tests | ||
+ | * Collaboration Meeting [[GlueX-Collaboration-Sep-2011|October 6-8]] at Jefferson Lab. | ||
+ | * Workshops and [[Conferences]]. | ||
* Reports from Technical Groups. | * Reports from Technical Groups. | ||
− | ** Trigger/DAQ/Monitoring/Controls [[OWG Meeting | + | ** Trigger/DAQ/Monitoring/Controls [[OWG Meeting 3-Aug-2011 |August 3, 2011]] |
− | ** Tracking [[ | + | ** Tracking [[August 3, 2011 Tracking CDC/FDC | August 3, 2011]] |
** Calorimeters | ** Calorimeters | ||
− | *** Calorimetry [[ | + | *** Calorimetry [[Aug 2, 2011 Calorimetry|August 2, 2011]] |
− | *** BCAL Readout [[ | + | *** BCAL Readout [[Aug 9, 2011 Readout|August 9, 2011]] |
− | *** Readout Segmentation [[BCAL Readout Segmentation Task group Meeting: | + | *** Readout Segmentation [[BCAL Readout Segmentation Task group Meeting: Aug 5, 2011|August 5, 2011]] |
− | ** TOF [[GlueX TOF Meeting, | + | ** TOF [[GlueX TOF Meeting, August 4, 2011#Minutes|August 4, 2011]] |
− | ** Start Counter [[GlueX Start Counter Meeting, | + | ** Start Counter [[GlueX Start Counter Meeting, July 28, 2011#Minutes|July 28, 2011]] |
** Magnet | ** Magnet | ||
** Engineering | ** Engineering | ||
** Electronics | ** Electronics | ||
** Target [[GlueX Target Meeting, July 12, 2011#Minutes|July 12, 2011]] | ** Target [[GlueX Target Meeting, July 12, 2011#Minutes|July 12, 2011]] | ||
− | ** Offline Software [[GlueX Offline Meeting, July | + | ** Offline Software [[GlueX Offline Meeting, July 27, 2011#Minutes|July 27, 2011]] |
− | ** Photon Beam and Tagger [[BLTWG Meeting | + | ** Photon Beam and Tagger [[BLTWG Meeting 08/08/2011|August 8, 2011]] |
− | ** Physics [[ | + | ** Physics [[August 1, 2011 (11:30AM), Physics Working Group|August 1, 2011]] |
* AOT | * AOT |
Latest revision as of 07:09, 10 August 2011
Meeting Time and Place
The meeting will be on Wednesday August 10, 2011 at 11:00am EDT. For those people at Jefferson Lab, the meeting will be in room F326/F327.
Meeting Connections
To connect from the outside:
1.) ESNET:
Call ESNET Number 8542553 (this is the preferred connection method).
2.) Phone: (should not be needed)
+1-866-740-1260 : US and Canada +1-303-248-0285 : International then use participant code: 3421244# (the # is needed when using the phone) or www.readytalk.com then type access code 3421244 into "join a meeting" (you need java plugin)
3.) EVO:
A conference has been booked under "GlueX" from 10:00am until 1:00pm (EST).
Agenda
- Announcements
- MOU and Contract Status
- MOU Status
- UCONN
- FIU
- UVA
- UMass
- Mephi
- Construction Contracts
- Athens
- FSU
- CUA
- MOU Status
- Beam Tests
- Collaboration Meeting October 6-8 at Jefferson Lab.
- Workshops and Conferences.
- Reports from Technical Groups.
- Trigger/DAQ/Monitoring/Controls August 3, 2011
- Tracking August 3, 2011
- Calorimeters
- Calorimetry August 2, 2011
- BCAL Readout August 9, 2011
- Readout Segmentation August 5, 2011
- TOF August 4, 2011
- Start Counter July 28, 2011
- Magnet
- Engineering
- Electronics
- Target July 12, 2011
- Offline Software July 27, 2011
- Photon Beam and Tagger August 8, 2011
- Physics August 1, 2011
- AOT