Difference between revisions of "2011-08-10"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 98: | Line 98: | ||
** Offline Software [[GlueX Offline Meeting, July 13, 2011#Minutes|July 13, 2011]] | ** Offline Software [[GlueX Offline Meeting, July 13, 2011#Minutes|July 13, 2011]] | ||
** Photon Beam and Tagger [[BLTWG Meeting 07/25/2011|July 25, 2011]] | ** Photon Beam and Tagger [[BLTWG Meeting 07/25/2011|July 25, 2011]] | ||
− | ** Physics [[ | + | ** Physics [[August 1, 2011 (11:30AM), Physics Working Group|August 1, 2011]] |
* AOT | * AOT |
Revision as of 12:54, 9 August 2011
Contents
Meeting Time and Place
The meeting will be on Wednesday August 10, 2011 at 11:00am EDT. For those people at Jefferson Lab, the meeting will be in room F326/F327.
Meeting Connections
To connect from the outside:
1.) ESNET:
Call ESNET Number 8542553 (this is the preferred connection method).
2.) Phone: (should not be needed)
+1-866-740-1260 : US and Canada +1-303-248-0285 : International then use participant code: 3421244# (the # is needed when using the phone) or www.readytalk.com then type access code 3421244 into "join a meeting" (you need java plugin)
3.) EVO:
A conference has been booked under "GlueX" from 10:00am until 1:00pm (EST).
Meeting Time and Place
The meeting will be on Wednesday July 27, 2011 at 11:00am EDT. For those people at Jefferson Lab, the meeting will be in room F326/F327.
Meeting Connections
To connect from the outside:
1.) ESNET:
Call ESNET Number 8542553 (this is the preferred connection method).
2.) Phone: (should not be needed)
+1-866-740-1260 : US and Canada +1-303-248-0285 : International then use participant code: 3421244# (the # is needed when using the phone) or www.readytalk.com then type access code 3421244 into "join a meeting" (you need java plugin)
3.) EVO:
A conference has been booked under "GlueX" from 10:00am until 1:00pm (EST).
Agenda
- Announcements
- MOU and Contract Status
- MOU Status
- UCONN
- FIU
- UVA
- UMass
- Mephi
- Construction Contracts
- Athens
- FSU
- CUA
- MOU Status
- Beam Tests
- Reports from Technical Groups.
- Trigger/DAQ/Monitoring/Controls August 3, 2011
- Tracking August 3, 2011
- Calorimeters
- Calorimetry August 2, 2011
- BCAL Readout August 9, 2011
- Readout Segmentation BCAL Readout Segmentation Task group Meeting: Jul 22, 2011
- TOF August 4, 2011
- Start Counter July 28, 2011
- Magnet
- Engineering
- Electronics
- Target July 12, 2011
- Offline Software July 27, 2011
- Photon Beam and Tagger August 8, 2011
- Physics August 1, 2011
- AOT
- FSU
- CUA
- Beam Tests
- Reports from Technical Groups.
- Trigger/DAQ/Monitoring/Controls June 8, 2011
- Tracking June 8, 2011
- Calorimeters
- Calorimetry Jul 19, 2011 Calorimetry
- BCAL Readout Jul 26, 2011 Readout
- Readout Segmentation BCAL Readout Segmentation Task group Meeting: Jul 22, 2011
- TOF July 21, 2011
- Start Counter June 30, 2011
- Magnet
- Engineering
- Electronics
- Target July 12, 2011
- Offline Software July 13, 2011
- Photon Beam and Tagger July 25, 2011
- Physics August 1, 2011
- AOT