https://halldweb1.jlab.org/wiki/api.php?action=feedcontributions&user=Whitey&feedformat=atomGlueXWiki - User contributions [en]2024-03-28T23:58:06ZUser contributionsMediaWiki 1.24.1https://halldweb1.jlab.org/wiki/index.php?title=March_26,_2024_KLONG_CPS_Design_Meeting&diff=125295March 26, 2024 KLONG CPS Design Meeting2024-03-27T18:14:11Z<p>Whitey: /* Minutes */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Tuesday, March 26, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/February_27,_2024_KLONG_CPS_Design_Meeting<br />
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)<br />
** Copper Absorber updated [[media:Copper absorber.pdf]]<br />
** Tagger Hall Layout (Stephanie/Keith)<br />
* De-gaussing of Tagger magnet (all)<br />
** Run test with an existing dipole magnet at magnet measurement (Tim, Joe Meyers)<br />
* Magnet update (Josh/Stephanie) [[media:CPS Magnet Design.pdf]]<br />
<br />
== Minutes ==<br />
* Reviewed minutes from last meeting<br />
* Discussed progress on 3D model<br />
** Discussed possibility of removing borated poly layer from the back side when moving CPS out of beamline<br />
*** Pavel will check radiation levels<br />
*** It will make more clearance for GlueX reinstall<br />
*** Poly can be attached outside of support frame<br />
** current model shows using cartridges from the FCAL for support and alignment set at 33% in Z. Need to move them out slightly<br />
** Ok to have a gap upstream of copper absorber for water lines - total shielding thickness still needed<br />
** On downstream end, keep center Cu/W inner block up against the absorber (inside of the water lines) OK for gap outside this<br />
** Currently the copper absorber model is 1.67 cm below beam center, we will move to 2 cm below<br />
** Cu absorber water channels modified to .5 in holes x8. Keith/Josh will get Pavel a usable 3D model of the modified absorber to import into Fluka<br />
* Need to set the center of the magnet poles 2cm below beamline<br />
* Magnet pole gap is clear of all materials, Cu/W can fill in coil regions<br />
<br />
== Action Items ==</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=March_26,_2024_KLONG_CPS_Design_Meeting&diff=125294March 26, 2024 KLONG CPS Design Meeting2024-03-27T18:12:21Z<p>Whitey: /* Minutes */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Tuesday, March 26, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/February_27,_2024_KLONG_CPS_Design_Meeting<br />
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)<br />
** Copper Absorber updated [[media:Copper absorber.pdf]]<br />
** Tagger Hall Layout (Stephanie/Keith)<br />
* De-gaussing of Tagger magnet (all)<br />
** Run test with an existing dipole magnet at magnet measurement (Tim, Joe Meyers)<br />
* Magnet update (Josh/Stephanie) [[media:CPS Magnet Design.pdf]]<br />
<br />
== Minutes ==<br />
* Reviewed minutes from last meeting<br />
* Discussed progress on 3D model<br />
** Discussed possibility of removing borated poly layer from the back side when moving CPS out of beamline<br />
*** Pavel will check radiation levels<br />
*** It will make more clearance for GlueX reinstall<br />
*** Poly can be attached outside of support frame<br />
** Ok to have a gap upstream of copper absorber for water lines - total shielding thickness still needed<br />
** On downstream end, keep center Cu/W inner block up against the absorber (inside of the water lines) OK for gap outside this<br />
** Currently the copper absorber model is 1.67 cm below beam center, we will move to 2 cm below<br />
** Cu absorber water channels modified to .5 in holes x8. Keith/Josh will get Pavel a usable 3D model of the modified absorber to import into Fluka<br />
* Need to set the center of the magnet poles 2cm below beamline<br />
* Magnet pole gap is clear of all materials, Cu/W can fill in coil regions<br />
<br />
== Action Items ==</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=March_26,_2024_KLONG_CPS_Design_Meeting&diff=125293March 26, 2024 KLONG CPS Design Meeting2024-03-27T18:11:22Z<p>Whitey: /* Minutes */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Tuesday, March 26, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/February_27,_2024_KLONG_CPS_Design_Meeting<br />
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)<br />
** Copper Absorber updated [[media:Copper absorber.pdf]]<br />
** Tagger Hall Layout (Stephanie/Keith)<br />
* De-gaussing of Tagger magnet (all)<br />
** Run test with an existing dipole magnet at magnet measurement (Tim, Joe Meyers)<br />
* Magnet update (Josh/Stephanie) [[media:CPS Magnet Design.pdf]]<br />
<br />
== Minutes ==<br />
* Reviewed minutes from last meeting<br />
* Discussed progress on 3D model<br />
** Discussed possibility of removing borated poly layer from the back side when moving CPS out of beamline<br />
*** Pavel will check radiation levels<br />
*** It will make more clearance for GlueX reinstall<br />
** Ok to have a gap upstream of copper absorber for water lines - total shielding thickness still needed<br />
** On downstream end, keep center Cu/W inner block up against the absorber (inside of the water lines) OK for gap outside this<br />
** Currently the copper absorber model is 1.67 cm below beam center, we will move to 2 cm below<br />
** Cu absorber water channels modified to .5 in holes x8. Keith/Josh will get Pavel a usable 3D model of the modified absorber to import into Fluka<br />
* Need to set the center of the magnet poles 2cm below beamline<br />
* Magnet pole gap is clear of all materials, Cu/W can fill in coil regions<br />
<br />
== Action Items ==</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=March_26,_2024_KLONG_CPS_Design_Meeting&diff=125292March 26, 2024 KLONG CPS Design Meeting2024-03-27T18:09:41Z<p>Whitey: /* Minutes */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Tuesday, March 26, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/February_27,_2024_KLONG_CPS_Design_Meeting<br />
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)<br />
** Copper Absorber updated [[media:Copper absorber.pdf]]<br />
** Tagger Hall Layout (Stephanie/Keith)<br />
* De-gaussing of Tagger magnet (all)<br />
** Run test with an existing dipole magnet at magnet measurement (Tim, Joe Meyers)<br />
* Magnet update (Josh/Stephanie) [[media:CPS Magnet Design.pdf]]<br />
<br />
== Minutes ==<br />
* Reviewed minutes from last meeting<br />
* Discussed progress on 3D model<br />
** Discussed possibility of removing borated poly layer from the back side when moving CPS out of beamline<br />
*** Pavel will check radiation levels<br />
*** It will make more clearance for GlueX reinstall<br />
** Ok to have a gap upstream of copper absorber for water lines - total shielding thickness still needed<br />
** On downstream end, keep center Cu/W inner block up against the absorber (inside of the water lines) OK for gap outside this<br />
** Currently the copper absorber model is 1.67 cm below beam center, we will move to 2 cm below<br />
* Need to set the center of the magnet poles 2cm below beamline<br />
* Magnet pole gap is clear of all materials, Cu/W can fill in coil regions<br />
<br />
== Action Items ==</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=March_26,_2024_KLONG_CPS_Design_Meeting&diff=125291March 26, 2024 KLONG CPS Design Meeting2024-03-27T18:07:26Z<p>Whitey: /* Minutes */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Tuesday, March 26, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/February_27,_2024_KLONG_CPS_Design_Meeting<br />
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)<br />
** Copper Absorber updated [[media:Copper absorber.pdf]]<br />
** Tagger Hall Layout (Stephanie/Keith)<br />
* De-gaussing of Tagger magnet (all)<br />
** Run test with an existing dipole magnet at magnet measurement (Tim, Joe Meyers)<br />
* Magnet update (Josh/Stephanie) [[media:CPS Magnet Design.pdf]]<br />
<br />
== Minutes ==<br />
* Reviewed minutes from last meeting<br />
* Discussed progress on 3D model<br />
** Discussed possibility of removing borated poly layer from the back side when moving CPS out of beamline<br />
*** Pavel will check radiation levels<br />
*** It will make more clearance for GlueX reinstall<br />
** Ok to have a gap upstream of copper absorber for water lines - total shielding thickness still needed<br />
** On downstream end, keep center Cu/W inner block up against the absorber (inside of the water lines) OK for gap outside this<br />
* Need to set the center of the magnet poles 2cm below beamline<br />
<br />
== Action Items ==</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=March_26,_2024_KLONG_CPS_Design_Meeting&diff=125290March 26, 2024 KLONG CPS Design Meeting2024-03-27T18:07:13Z<p>Whitey: /* Minutes */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Tuesday, March 26, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/February_27,_2024_KLONG_CPS_Design_Meeting<br />
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)<br />
** Copper Absorber updated [[media:Copper absorber.pdf]]<br />
** Tagger Hall Layout (Stephanie/Keith)<br />
* De-gaussing of Tagger magnet (all)<br />
** Run test with an existing dipole magnet at magnet measurement (Tim, Joe Meyers)<br />
* Magnet update (Josh/Stephanie) [[media:CPS Magnet Design.pdf]]<br />
<br />
== Minutes ==<br />
* Reviewed minutes from last meeting<br />
* Discussed progress on 3D model<br />
** Discussed possibility of removing borated poly layer from the back side when moving CPS out of beamline<br />
*** Pavel will check radiation levels<br />
*** It will make more clearance for GlueX reinstall<br />
** Ok to have a gap upstream of copper absorber for water lines - total shielding thickness still needed<br />
** On downstream end, keep center Cu/W inner block up against the absorber (inside of the water lines) OK for gap outside this<br />
** Need to set the center of the magnet poles 2cm below beamline<br />
<br />
== Action Items ==</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=March_26,_2024_KLONG_CPS_Design_Meeting&diff=125289March 26, 2024 KLONG CPS Design Meeting2024-03-27T18:06:24Z<p>Whitey: /* Minutes */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Tuesday, March 26, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/February_27,_2024_KLONG_CPS_Design_Meeting<br />
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)<br />
** Copper Absorber updated [[media:Copper absorber.pdf]]<br />
** Tagger Hall Layout (Stephanie/Keith)<br />
* De-gaussing of Tagger magnet (all)<br />
** Run test with an existing dipole magnet at magnet measurement (Tim, Joe Meyers)<br />
* Magnet update (Josh/Stephanie) [[media:CPS Magnet Design.pdf]]<br />
<br />
== Minutes ==<br />
* Reviewed minutes from last meeting<br />
* Discussed progress on 3D model<br />
** Discussed possibility of removing borated poly layer from the back side when moving CPS out of beamline<br />
*** Pavel will check radiation levels<br />
*** It will make more clearance for GlueX reinstall<br />
** Ok to have a gap upstream of copper absorber for water lines - total shielding thickness still needed<br />
** On downstream end, keep center Cu/W inner block up against the absorber (inside of the water lines) OK for gap outside this<br />
<br />
== Action Items ==</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=March_26,_2024_KLONG_CPS_Design_Meeting&diff=125275March 26, 2024 KLONG CPS Design Meeting2024-03-26T19:26:50Z<p>Whitey: /* Minutes */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Tuesday, March 26, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/February_27,_2024_KLONG_CPS_Design_Meeting<br />
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)<br />
** Copper Absorber updated [[media:Copper absorber.pdf]]<br />
** Tagger Hall Layout (Stephanie/Keith)<br />
* De-gaussing of Tagger magnet (all)<br />
** Run test with an existing dipole magnet at magnet measurement (Tim, Joe Meyers)<br />
* Magnet update (Josh/Stephanie) [[media:CPS Magnet Design.pdf]]<br />
<br />
== Minutes ==<br />
* Reviewed minutes from last meeting<br />
* Discussed progress on 3D model<br />
** Discussed possibility of removing borated poly layer from the back side when moving CPS out of beamline<br />
*** Pavel will check radiation levels<br />
*** It will make more clearance for GlueX reinstall<br />
** Ok to have a gap upstream of copper absorber for water lines - total shielding thickness still needed<br />
** On downstream end, keep center Cu/W inner block up against the absorber (inside of the water lines)<br />
<br />
== Action Items ==</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=File:CPS_Magnet_requirements.pdf&diff=125261File:CPS Magnet requirements.pdf2024-03-26T15:55:22Z<p>Whitey: </p>
<hr />
<div></div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=February_27,_2024_KLONG_CPS_Design_Meeting&diff=125260February 27, 2024 KLONG CPS Design Meeting2024-03-26T15:55:07Z<p>Whitey: /* Agenda */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Monday, February 27, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/February_12,_2024_KLONG_CPS_Design_Meeting<br />
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)<br />
** Copper Absorber updated [[media:Copper absorber.pdf]]<br />
** Tagger Hall Layout (Stephanie/Keith)<br />
** Possible cross section [[media:Baseline cross section.jpeg]]<br />
* De-gaussing of Tagger magnet (all)<br />
** Run test with an existing dipole magnet at magnet measurement (Tim, Joe Meyers)<br />
* Magnet update (Josh/Stephanie) [[media:CPS Magnet requirements.pdf]]<br />
<br />
== Minutes ==<br />
* Looked at 3D model and discussed the copper absorber geometry and hall layout<br />
* Decided it would be a good idea to 3D print the absorber to ensure we have the correct geometry and recheck thermal models<br />
* The "decommissioning" volume (<10tons) was discussed and possible plans include pre assembly outside tagger hall or assemble in place<br />
* Discussed the deGaussing of the tagger and need for reply to Patricia by March 1. The plan is to work with magnet measurement group to set up a test of a similar dipole to develop the method.<br />
* Discussed magnet design progress, Josh and Stephanie are working on details including the coil design<br />
<br />
== Action Items ==<br />
* Engineering group to meet separately to progress the detail design of the "decommissioning" section (Tim)<br />
* Josh and Stephanie to continue detail magnet design<br />
* 3D print the copper absorber to ensure we have the geometry correct (Keith/Bobby)<br />
* Run thermal models of the updated absorber geometry (Hovanes/Tim)<br />
* Develop plan for testing the deGauss procedure with Magnet measurement group and send email to Patrizia (Tim)</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=March_26,_2024_KLONG_CPS_Design_Meeting&diff=125253March 26, 2024 KLONG CPS Design Meeting2024-03-26T13:07:39Z<p>Whitey: Created page with "== Meeting Time and Place == Tuesday, March 26, 2024, 1pm Hall D Counting House * Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whi..."</p>
<hr />
<div>== Meeting Time and Place ==<br />
Tuesday, March 26, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/February_27,_2024_KLONG_CPS_Design_Meeting<br />
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)<br />
** Copper Absorber updated [[media:Copper absorber.pdf]]<br />
** Tagger Hall Layout (Stephanie/Keith)<br />
* De-gaussing of Tagger magnet (all)<br />
** Run test with an existing dipole magnet at magnet measurement (Tim, Joe Meyers)<br />
* Magnet update (Josh/Stephanie) [[media:CPS Magnet Design.pdf]]<br />
<br />
== Minutes ==<br />
<br />
== Action Items ==</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=KLONG_CPS_Design_Meetings&diff=125252KLONG CPS Design Meetings2024-03-26T13:05:48Z<p>Whitey: </p>
<hr />
<div>* [[January 16, 2024 KLONG CPS Design Meeting]]<br />
* [[February 12, 2024 KLONG CPS Design Meeting]]<br />
* [[February 27, 2024 KLONG CPS Design Meeting]]<br />
* [[March 26, 2024 KLONG CPS Design Meeting]]</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=February_27,_2024_KLONG_CPS_Design_Meeting&diff=125035February 27, 2024 KLONG CPS Design Meeting2024-03-08T16:58:04Z<p>Whitey: /* Action Items */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Monday, February 27, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/February_12,_2024_KLONG_CPS_Design_Meeting<br />
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)<br />
** Copper Absorber updated [[media:Copper absorber.pdf]]<br />
** Tagger Hall Layout (Stephanie/Keith)<br />
** Possible cross section [[media:Baseline cross section.jpeg]]<br />
* De-gaussing of Tagger magnet (all)<br />
** Run test with an existing dipole magnet at magnet measurement (Tim, Joe Meyers)<br />
* Magnet update (Josh/Stephanie) [[media:CPS Magnet Design.pdf]]<br />
<br />
== Minutes ==<br />
* Looked at 3D model and discussed the copper absorber geometry and hall layout<br />
* Decided it would be a good idea to 3D print the absorber to ensure we have the correct geometry and recheck thermal models<br />
* The "decommissioning" volume (<10tons) was discussed and possible plans include pre assembly outside tagger hall or assemble in place<br />
* Discussed the deGaussing of the tagger and need for reply to Patricia by March 1. The plan is to work with magnet measurement group to set up a test of a similar dipole to develop the method.<br />
* Discussed magnet design progress, Josh and Stephanie are working on details including the coil design<br />
<br />
== Action Items ==<br />
* Engineering group to meet separately to progress the detail design of the "decommissioning" section (Tim)<br />
* Josh and Stephanie to continue detail magnet design<br />
* 3D print the copper absorber to ensure we have the geometry correct (Keith/Bobby)<br />
* Run thermal models of the updated absorber geometry (Hovanes/Tim)<br />
* Develop plan for testing the deGauss procedure with Magnet measurement group and send email to Patrizia (Tim)</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=February_27,_2024_KLONG_CPS_Design_Meeting&diff=125034February 27, 2024 KLONG CPS Design Meeting2024-03-08T16:54:34Z<p>Whitey: /* Minutes */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Monday, February 27, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/February_12,_2024_KLONG_CPS_Design_Meeting<br />
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)<br />
** Copper Absorber updated [[media:Copper absorber.pdf]]<br />
** Tagger Hall Layout (Stephanie/Keith)<br />
** Possible cross section [[media:Baseline cross section.jpeg]]<br />
* De-gaussing of Tagger magnet (all)<br />
** Run test with an existing dipole magnet at magnet measurement (Tim, Joe Meyers)<br />
* Magnet update (Josh/Stephanie) [[media:CPS Magnet Design.pdf]]<br />
<br />
== Minutes ==<br />
* Looked at 3D model and discussed the copper absorber geometry and hall layout<br />
* Decided it would be a good idea to 3D print the absorber to ensure we have the correct geometry and recheck thermal models<br />
* The "decommissioning" volume (<10tons) was discussed and possible plans include pre assembly outside tagger hall or assemble in place<br />
* Discussed the deGaussing of the tagger and need for reply to Patricia by March 1. The plan is to work with magnet measurement group to set up a test of a similar dipole to develop the method.<br />
* Discussed magnet design progress, Josh and Stephanie are working on details including the coil design<br />
<br />
== Action Items ==<br />
*</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=February_27,_2024_KLONG_CPS_Design_Meeting&diff=125033February 27, 2024 KLONG CPS Design Meeting2024-03-08T16:53:39Z<p>Whitey: /* Minutes */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Monday, February 27, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/February_12,_2024_KLONG_CPS_Design_Meeting<br />
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)<br />
** Copper Absorber updated [[media:Copper absorber.pdf]]<br />
** Tagger Hall Layout (Stephanie/Keith)<br />
** Possible cross section [[media:Baseline cross section.jpeg]]<br />
* De-gaussing of Tagger magnet (all)<br />
** Run test with an existing dipole magnet at magnet measurement (Tim, Joe Meyers)<br />
* Magnet update (Josh/Stephanie) [[media:CPS Magnet Design.pdf]]<br />
<br />
== Minutes ==<br />
* Looked at 3D model and discussed the copper absorber geometry and hall layout<br />
* Decided it would be a good idea to 3D print the absorber to ensure we have the correct geometry and recheck thermal models<br />
* The "decommissioning" volume (<10tons) was discussed and possible plans include pre assembly outside tagger hall or assemble in place<br />
* Discussed the deGaussing of the tagger and need for reply to Patricia by March 1. The plan is to work with magnet measurement group to set up a test of a similar dipole to develop the method.<br />
<br />
== Action Items ==<br />
*</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=File:Copper_absorber.pdf&diff=124894File:Copper absorber.pdf2024-02-27T14:18:25Z<p>Whitey: </p>
<hr />
<div></div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=February_27,_2024_KLONG_CPS_Design_Meeting&diff=124893February 27, 2024 KLONG CPS Design Meeting2024-02-27T12:23:09Z<p>Whitey: /* Agenda */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Monday, February 27, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/February_12,_2024_KLONG_CPS_Design_Meeting<br />
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)<br />
** Copper Absorber updated [[media:Copper absorber.pdf]]<br />
** Tagger Hall Layout (Stephanie/Keith)<br />
** Possible cross section [[media:Baseline cross section.jpeg]]<br />
* De-gaussing of Tagger magnet (all)<br />
** Run test with an existing dipole magnet at magnet measurement (Tim, Joe Meyers)<br />
* Magnet update (Josh/Stephanie) [[media:CPS Magnet Design.pdf]]<br />
<br />
== Minutes ==<br />
*<br />
<br />
== Action Items ==<br />
*</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=February_27,_2024_KLONG_CPS_Design_Meeting&diff=124892February 27, 2024 KLONG CPS Design Meeting2024-02-27T12:22:37Z<p>Whitey: Created page with "== Meeting Time and Place == Monday, February 27, 2024, 1pm Hall D Counting House * Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim W..."</p>
<hr />
<div>== Meeting Time and Place ==<br />
Monday, February 27, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/January_16,_2024_KLONG_CPS_Design_Meeting<br />
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)<br />
** Copper Absorber updated [[media:Copper absorber.pdf]]<br />
** Tagger Hall Layout (Stephanie/Keith)<br />
** Possible cross section [[media:Baseline cross section.jpeg]]<br />
* De-gaussing of Tagger magnet (all)<br />
** Run test with an existing dipole magnet at magnet measurement (Tim, Joe Meyers)<br />
* Magnet update (Josh/Stephanie) [[media:CPS Magnet Design.pdf]]<br />
<br />
<br />
== Minutes ==<br />
*<br />
<br />
== Action Items ==<br />
*</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=KLONG_CPS_Design_Meetings&diff=124891KLONG CPS Design Meetings2024-02-27T12:16:40Z<p>Whitey: </p>
<hr />
<div>* [[January 16, 2024 KLONG CPS Design Meeting]]<br />
* [[February 12, 2024 KLONG CPS Design Meeting]]<br />
* [[February 27, 2024 KLONG CPS Design Meeting]]</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=GlueX-Collaboration-Feb-2024&diff=124806GlueX-Collaboration-Feb-20242024-02-21T16:55:50Z<p>Whitey: /* Wednesday, February 21 */</p>
<hr />
<div>== GlueX Winter 2024 Collaboration Meeting ==<br />
<br />
<font size="+1">February 21-23, 2024 Hybrid </font><br />
<br />
The GlueX Collaboration Meeting will be held jointly online and in person at Florida State University.<br />
<br />
To connect to the meeting, please go to [https://halldweb.jlab.org/wiki-private/index.php/Connect_to_ZoomGov_Meetings the listing of Zoom meetings on the private Wiki] and select the GlueX/Hall D Biweekly Meeting link at the top of the list.<br />
<br />
For remote participation from JLab we reserved the following rooms in CEBAF Center:<br />
* Wed: 1:30pm - 6pm F326-327<br />
* Thu: 9am - 6pm F224-225<br />
* Fri: 9am - 5pm F326-327<br />
<br />
== Registration ==<br />
<br />
Please register for the meeting [https://forms.gle/FPo8thHY4j6THMFm9 using this link]. Note that there is a $30 registration fee for in-person participants to offset the cost of refreshments for breaks.<br />
<br />
== Travel Logistics ==<br />
<br />
The in-person session will be hosted at Florida State University. It is recommended to make travel arrangements well in advance. The meeting is during the Florida state legislative session which can place some demand on travel infrastructure.<br />
<br />
* [http://hadron.physics.fsu.edu/~sdobbs/suggested_hotels.html Suggested Hotels & Other Logistics]<br />
<br />
== Special Events ==<br />
<br />
The meeting will be immediately preceded by a [[Workshop on Polarized Target Studies with Real Photons in Hall D]], which will take place on Wednesday morning.<br />
<br />
== Agenda ==<br />
<br />
<br />
<br />
=== Wednesday, February 21 ===<br />
<br />
* '''Session I: Overview and Collaboration Business''' (Chair: Justin Stevens)<br />
** 13:30 (10+5): [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=6364 Opening Remarks (Matt Shepherd)]<br />
** 13:45 (20+5): [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=6348 Hall D Status Report (Eugene Chudakov)]<br />
** 14:10 (15+5): [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=6351 Report from the Collaboration Board (Naomi Jarvis)]<br />
** 14:30 (20+5): Status of Charged Pion Polarizability Reconstruction and Analysis (Albert Fabrizi)<br />
** 14:55 (20+5): [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=6350 Summary of Production, Monitoring, and Calibration Activities (Naomi Jarvis)]<br />
<br />
*''15:25 - 15:55: Coffee Break''<br />
<br />
* '''Session II: Engineering and FCAL2''' (Chair: Eugene Chudakov)<br />
** 15:50 (20+5): [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=6366 Hall D Engineering Overview ](Tim Whitlatch) <br />
** 16:15 (20+5): [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=6365 FCAL Assembly] (Malte Albrecht)<br />
** 16:40 (20+5): ECAL Assembly (Sasha Somov)<br />
** 17:05 (20+5): [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=6347 FCAL2 Software and Analysis] (Simon Taylor)<br />
** 17:30 (15+5): [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=6349 Tracking and Alignment Update] (Simon Taylor)<br />
<br />
=== Thursday, February 22 ===<br />
<br />
* '''Session I: Software and Analysis''' (Chair: Malte Albrecht)<br />
** 9:00 (20+5): Software Report / Summary of SciComp Review (Alex Austregesilo)<br />
** 9:25 (20+5): Status of Hydra (Torri Jeske)<br />
** 9:50 (20+5): Report from the Physics Coordinator (Sean Dobbs)<br />
** 10:15 (15+5): &eta; Cross Section (Jon Zarling)<br />
<br />
* ''10:35 - 11:00: Coffee Break''<br />
<br />
* '''Session II: Cross Sections''' (Chair: Sean Dobbs)<br />
** 11:00 (20+5): &phi;&eta; (Darius Darulis)<br />
** 11:25 (20+5): &Xi; Analyses (Jesse Hernandez/Volker Crede)<br />
** 11:50 (15+5): &gamma; p &rarr; &eta;'K&Lambda; (Matt Shepherd)<br />
<br />
* ''12:10 - 13:30: Lunch''<br />
<br />
* '''Session III: Amplitude Analysis''' (Chair: Volker Crede)<br />
** 13:30 (20+5): &omega; Dalitz Plot Analysis (Saheli Rakshit/Volker Crede) <br />
** 13:55 (20+5): &eta;' Dalitz Plot Analysis (Olga Cortes) <br />
** 14:20 (20+5): &Lambda;(1405) Overview (Reinhard Schumacher)<br />
** 14:45 (30+5): Ambiguities in 2 Pseudoscalar and Vector Pseudoscalar (Edmundo Barriga, Jiawei Guo, Kevin Scheuer)<br />
<br />
* ''15:20 - 15:40: Coffee Break''<br />
<br />
* '''Session IV: Amplitude Analysis and Beam Asymmetries''' (Chair: Naomi Jarvis)<br />
** 15:40 (20+5): a<sub>2</sub> Cross section (Malte)<br />
** 16:05 (20+5): Non-parametric PWA (Lawrence)<br />
** 16:30 (20+5): Polarized Moments (Boris Grube)<br />
** 16:55 (20+5): &eta; Beam Asymmetry (Tolga Erbora)<br />
** 17:20 (20+5): &eta;’ Beam Asymmetry (Churamani Paudel)<br />
<br />
=== Friday, February 23 ===<br />
<br />
* '''Session I: Cross Sections''' (Chair: Simon Taylor)<br />
** 09:00 (20+5): Cross Section Systematics (Justin Stevens)<br />
** 09:25 (20+5): f<sub>1</sub>(1285) (Tyler Viducic) <br />
** 09:50 (15+5): f<sub>1</sub>(1420) (Daniel Barton)<br />
** 10:10 (20+5): K<sup>+</sup>K<sup>-</sup>&pi;<sup>0</sup> Analysis (Mike Dugger)<br />
<br />
* ''10:35 - 10:55: Coffee Break''<br />
<br />
* '''Session II: Amplitude Analysis''' (Chair: Alex Austregesilo)<br />
** 10:55 (20+5): &Delta;<sup>++</sup> SDMEs (Farah Afzal)<br />
** 11:20 (20+5): &omega;&pi;<sup>-</sup>&Delta;<sup>++</sup> (Amy Schertz)<br />
** 11:45 (20+5): &omega;&pi;<sup>0</sup> (Kevin Scheuer)<br />
<br />
* ''12:10 - 13:30: Lunch''<br />
<br />
* '''Session III: Future Plans''' (Chair: Matt Shepherd)<br />
** 13:30 (25+5): Summary of Polarized Target Workshop and Beam Polarization Proposal (Mark Dalton) <br />
** 14:00 (20+5): Charmonium in future GlueX running and Gravitational Form Factors (Lubomir Pentchev)<br />
** 14:25 (20): [Open/Discussion of GlueX-III Proposal]<br />
<br />
* ''14:45 - 15:15: Coffee Break''<br />
<br />
* '''Session IV: Cross Sections''' (Chair: Sean Dobbs)<br />
** 15:15 (20+5): Towards understanding the physics behind the &gamma;<sup>4</sup>He &rarr; &eta; <sup>4</sup>He process(es) (Igal Jaeglé)<br />
** 15:40 (20+5): Extracting the &eta; &rarr; &gamma; &gamma; yields in the &gamma;<sup>4</sup>He &rarr; &eta; <sup>4</sup>He process(es) (Drew Smith)<br />
** 16:05: Closing Remarks</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=February_12,_2024_KLONG_CPS_Design_Meeting&diff=124661February 12, 2024 KLONG CPS Design Meeting2024-02-12T20:32:22Z<p>Whitey: /* Action Items */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Monday, February 12, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/January_16,_2024_KLONG_CPS_Design_Meeting<br />
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)<br />
** 3D model cross section with dimensions [[media:Dimensioned CPS cross section.png]]<br />
** Possible cross section [[media:Baseline cross section.jpeg]]<br />
* De-gaussing of Tagger magnet (all)<br />
** [[media:tagger_magnet_degaussing_4KLF.pdf | Tagger magnet degaussing requirements]] (Hovanes)<br />
* Magnet update (Josh) [[media:CPS Magnet Design.pdf]]<br />
* Discuss path forward (Tim/all)<br />
<br />
== Minutes ==<br />
* Reviewed minutes from last meeting<br />
* Looked over Keith's 3D model with dimensions<br />
** Pavel to take a closer look to ensure they correspond to his conceptual design<br />
** Need to get accurate dimensions for the 20% Cu/80% W pieces<br />
** Looked at installation in tagger building and discussed space issues<br />
** Need to bring in magnet and girder into the 3D model<br />
** Borated Poly layer is not needed below the CPU<br />
** Outer lead layer may not be needed below the CPU - it may still be needed to prevent concrete activation<br />
** the support stand for the final decommissioning portion (< 10 tons) may be heavy concrete<br />
* Discussed deGauss of tagger magnet, need plan to present to Patrizia by Mar 1<br />
* Josh presented the Magnet spec and design<br />
** Need to verify low power ops (35V) of power supply will be stable enough - Josh to check with Onish<br />
** Start modelling the magnet in NX and making drawings<br />
<br />
== Action Items ==<br />
* Verify W-Cu piece dimensions (Keith/Pavel)<br />
* Bring in Magnet and upstream girder into the model and move permanent magnet into position (Stephanie/Keith)<br />
* Progress on the detailed mechanical design of the decommissioning portion of CPS and present to Pavel for re-analysis (Keith/Tim)<br />
* Develop concept for shielding on the lower half of the CPS for Pavel to look at (Keith/Tim)<br />
* Start NX 3D magnet design and drawings (Stephanie)<br />
* Get with Onish on Power Supply stability at low power (Josh)<br />
* Get with Joe Meyers on deGauss technique and produce short write up for Patrizia (Tim)<br />
* Determine initial installation plans for CPS components (Josh/Stephanie/Keith/Tim)</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=February_12,_2024_KLONG_CPS_Design_Meeting&diff=124660February 12, 2024 KLONG CPS Design Meeting2024-02-12T20:30:41Z<p>Whitey: /* Action Items */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Monday, February 12, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/January_16,_2024_KLONG_CPS_Design_Meeting<br />
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)<br />
** 3D model cross section with dimensions [[media:Dimensioned CPS cross section.png]]<br />
** Possible cross section [[media:Baseline cross section.jpeg]]<br />
* De-gaussing of Tagger magnet (all)<br />
** [[media:tagger_magnet_degaussing_4KLF.pdf | Tagger magnet degaussing requirements]] (Hovanes)<br />
* Magnet update (Josh) [[media:CPS Magnet Design.pdf]]<br />
* Discuss path forward (Tim/all)<br />
<br />
== Minutes ==<br />
* Reviewed minutes from last meeting<br />
* Looked over Keith's 3D model with dimensions<br />
** Pavel to take a closer look to ensure they correspond to his conceptual design<br />
** Need to get accurate dimensions for the 20% Cu/80% W pieces<br />
** Looked at installation in tagger building and discussed space issues<br />
** Need to bring in magnet and girder into the 3D model<br />
** Borated Poly layer is not needed below the CPU<br />
** Outer lead layer may not be needed below the CPU - it may still be needed to prevent concrete activation<br />
** the support stand for the final decommissioning portion (< 10 tons) may be heavy concrete<br />
* Discussed deGauss of tagger magnet, need plan to present to Patrizia by Mar 1<br />
* Josh presented the Magnet spec and design<br />
** Need to verify low power ops (35V) of power supply will be stable enough - Josh to check with Onish<br />
** Start modelling the magnet in NX and making drawings<br />
<br />
== Action Items ==<br />
* Verify W-Cu piece dimensions (Keith/Pavel)<br />
* Bring in Magnet and upstream girder into the model and move permanent magnet into position (Stephanie/Keith)<br />
* Progress on the detailed mechanical design of the decommissioning portion of CPS and present to Pavel for re-analysis (Keith/Tim)<br />
* Develop concept for shielding on the lower half of the CPS for Pavel to look at (Keith/Tim)<br />
* Start NX 3D magnet design and drawings (Stephanie)<br />
* Get with Onish on Power Supply stability at low power (Josh)<br />
* Get with Joe Meyers on deGauss technique and produce short write up for Patrizia (Tim)</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=February_12,_2024_KLONG_CPS_Design_Meeting&diff=124659February 12, 2024 KLONG CPS Design Meeting2024-02-12T20:24:52Z<p>Whitey: /* Minutes */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Monday, February 12, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/January_16,_2024_KLONG_CPS_Design_Meeting<br />
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)<br />
** 3D model cross section with dimensions [[media:Dimensioned CPS cross section.png]]<br />
** Possible cross section [[media:Baseline cross section.jpeg]]<br />
* De-gaussing of Tagger magnet (all)<br />
** [[media:tagger_magnet_degaussing_4KLF.pdf | Tagger magnet degaussing requirements]] (Hovanes)<br />
* Magnet update (Josh) [[media:CPS Magnet Design.pdf]]<br />
* Discuss path forward (Tim/all)<br />
<br />
== Minutes ==<br />
* Reviewed minutes from last meeting<br />
* Looked over Keith's 3D model with dimensions<br />
** Pavel to take a closer look to ensure they correspond to his conceptual design<br />
** Need to get accurate dimensions for the 20% Cu/80% W pieces<br />
** Looked at installation in tagger building and discussed space issues<br />
** Need to bring in magnet and girder into the 3D model<br />
** Borated Poly layer is not needed below the CPU<br />
** Outer lead layer may not be needed below the CPU - it may still be needed to prevent concrete activation<br />
** the support stand for the final decommissioning portion (< 10 tons) may be heavy concrete<br />
* Discussed deGauss of tagger magnet, need plan to present to Patrizia by Mar 1<br />
* Josh presented the Magnet spec and design<br />
** Need to verify low power ops (35V) of power supply will be stable enough - Josh to check with Onish<br />
** Start modelling the magnet in NX and making drawings<br />
<br />
== Action Items ==</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=File:CPS_Magnet_Design.pdf&diff=124656File:CPS Magnet Design.pdf2024-02-12T17:07:47Z<p>Whitey: </p>
<hr />
<div></div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=February_12,_2024_KLONG_CPS_Design_Meeting&diff=124655February 12, 2024 KLONG CPS Design Meeting2024-02-12T17:07:35Z<p>Whitey: /* Agenda */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Monday, February 12, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/January_16,_2024_KLONG_CPS_Design_Meeting<br />
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)<br />
** 3D model cross section with dimensions [[media:Dimensioned CPS cross section.png]]<br />
** Possible cross section [[media:Baseline cross section.jpeg]]<br />
* De-gaussing of Tagger magnet (all)<br />
** [[media:tagger_magnet_degaussing_4KLF.pdf | Tagger magnet degaussing requirements]] (Hovanes)<br />
* Magnet update (Josh) [[media:CPS Magnet Design.pdf]]<br />
* Discuss path forward (Tim/all)<br />
<br />
== Minutes ==<br />
<br />
== Action Items ==</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=File:Dimensioned_CPS_cross_section.png&diff=124640File:Dimensioned CPS cross section.png2024-02-09T18:28:08Z<p>Whitey: </p>
<hr />
<div></div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=February_12,_2024_KLONG_CPS_Design_Meeting&diff=124639February 12, 2024 KLONG CPS Design Meeting2024-02-09T18:27:19Z<p>Whitey: /* Agenda */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Monday, February 12, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/January_16,_2024_KLONG_CPS_Design_Meeting<br />
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)<br />
** 3D model cross section with dimensions [[media:Dimensioned CPS cross section.png]]<br />
** Possible cross section [[media:Baseline cross section.jpeg]]<br />
* De-gaussing of Tagger magnet (all)<br />
* Magnet update (Josh)<br />
* Discuss path forward (Tim/all)<br />
<br />
== Minutes ==<br />
<br />
== Action Items ==</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=February_12,_2024_KLONG_CPS_Design_Meeting&diff=124600February 12, 2024 KLONG CPS Design Meeting2024-02-08T17:42:41Z<p>Whitey: /* Agenda */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Monday, February 12, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/January_16,_2024_KLONG_CPS_Design_Meeting<br />
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)<br />
** 3D model cross section with dimensions<br />
** Possible cross section [[media:Baseline cross section.jpeg]]<br />
* De-gaussing of Tagger magnet (all)<br />
* Magnet update (Josh)<br />
* Discuss path forward (Tim/all)<br />
<br />
== Minutes ==<br />
<br />
== Action Items ==</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=February_12,_2024_KLONG_CPS_Design_Meeting&diff=124599February 12, 2024 KLONG CPS Design Meeting2024-02-08T17:38:16Z<p>Whitey: /* Agenda */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Monday, February 12, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/January_16,_2024_KLONG_CPS_Design_Meeting<br />
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)<br />
** 3D model cross section with dimensions<br />
** Possible cross section [[media:Baseline cross section.jpeg]]<br />
* De-gaussing of Tagger magnet<br />
* Magnet update (Josh)<br />
* Discuss path forward (Tim/all)<br />
<br />
== Minutes ==<br />
<br />
== Action Items ==</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=February_12,_2024_KLONG_CPS_Design_Meeting&diff=124594February 12, 2024 KLONG CPS Design Meeting2024-02-07T20:57:58Z<p>Whitey: /* Agenda */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Monday, February 12, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/January_16,_2024_KLONG_CPS_Design_Meeting<br />
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)<br />
** 3D model cross section with dimensions<br />
** Possible cross section [[media:Baseline cross section.jpeg]]<br />
* Magnet update (Josh)<br />
* Discuss path forward (Tim/all)<br />
<br />
== Minutes ==<br />
<br />
== Action Items ==</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=File:Baseline_cross_section.jpeg&diff=124593File:Baseline cross section.jpeg2024-02-07T20:56:43Z<p>Whitey: </p>
<hr />
<div></div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=February_12,_2024_KLONG_CPS_Design_Meeting&diff=124592February 12, 2024 KLONG CPS Design Meeting2024-02-07T20:54:58Z<p>Whitey: /* Agenda */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Monday, February 12, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/January_16,_2024_KLONG_CPS_Design_Meeting<br />
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)<br />
** Possible cross section [[media:Baseline cross section.jpeg]]<br />
* Magnet update (Josh)<br />
* Discuss path forward (Tim/all)<br />
<br />
== Minutes ==<br />
<br />
== Action Items ==</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=February_12,_2024_KLONG_CPS_Design_Meeting&diff=124591February 12, 2024 KLONG CPS Design Meeting2024-02-07T20:53:12Z<p>Whitey: /* Agenda */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Monday, February 12, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/January_16,_2024_KLONG_CPS_Design_Meeting<br />
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)<br />
** Possible cross section <br />
* Magnet update (Josh)<br />
* Discuss path forward (Tim/all)<br />
<br />
== Minutes ==<br />
<br />
== Action Items ==</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=February_12,_2024_KLONG_CPS_Design_Meeting&diff=124590February 12, 2024 KLONG CPS Design Meeting2024-02-07T20:50:38Z<p>Whitey: /* Action Items */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Monday, February 12, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/January_16,_2024_KLONG_CPS_Design_Meeting<br />
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)<br />
* Magnet update (Josh)<br />
* Discuss path forward (Tim/all)<br />
<br />
== Minutes ==<br />
<br />
== Action Items ==</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=February_12,_2024_KLONG_CPS_Design_Meeting&diff=124589February 12, 2024 KLONG CPS Design Meeting2024-02-07T20:50:27Z<p>Whitey: /* Minutes */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Monday, February 12, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/January_16,_2024_KLONG_CPS_Design_Meeting<br />
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)<br />
* Magnet update (Josh)<br />
* Discuss path forward (Tim/all)<br />
<br />
== Minutes ==<br />
<br />
== Action Items ==<br />
* Pavel to check into exporting his model in a compatible format for NX ( Open Scad etc...<br />
* Stephanie to look into importable files from her end<br />
* Tim to provide stp file of copper absorber from ANSYS for Designers (complete)<br />
* Tim to setup bi-weekly meetings<br />
* Tim to set up and Engineer/Designer detailed meeting</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=February_12,_2024_KLONG_CPS_Design_Meeting&diff=124588February 12, 2024 KLONG CPS Design Meeting2024-02-07T20:48:28Z<p>Whitey: /* Agenda */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Monday, February 12, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/January_16,_2024_KLONG_CPS_Design_Meeting<br />
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)<br />
* Magnet update (Josh)<br />
* Discuss path forward (Tim/all)<br />
<br />
== Minutes ==<br />
<br />
* Discussed background of the project and the goal of getting the design completed in a little over a year<br />
* Pavel presented the current conceptual design based on his analysis<br />
** Copper radiator <br />
*** Operate remotely<br />
*** 300 micron repeatability<br />
*** 2 thicknesses plus blank<br />
*** 2cm diameter?<br />
*** rad hard materials (no encoder)<br />
*** maybe proximity switch/LVDT for positions<br />
** Need to develop a complete thermal model as design progresses<br />
** Use of a steel core for support<br />
** overall alignment of magnet and radiator to be within a few hundred microns<br />
** Ability to move the assembly (with out magnets) completely out of the beam to the north wall<br />
** Ability to crane or forklift the core out during decommissioning<br />
** Total weight approximately 90 tonnes<br />
** Need temperature sensors on copper, lead and steel<br />
** Need to fine tune the thermal calcs on copper absorber<br />
** Need water temperature and flow meters<br />
** US magnet to be designed to 2x current plus 10%<br />
** Need tungsten block to absorb the electron beam on magnet failure<br />
** Consult with Hall C folks on their design experience of a CPS<br />
** Josh fine tuning the magnet design<br />
*** Moving coils 12cm from beamline<br />
*** maybe less steel<br />
<br />
== Action Items ==<br />
* Pavel to check into exporting his model in a compatible format for NX ( Open Scad etc...<br />
* Stephanie to look into importable files from her end<br />
* Tim to provide stp file of copper absorber from ANSYS for Designers (complete)<br />
* Tim to setup bi-weekly meetings<br />
* Tim to set up and Engineer/Designer detailed meeting</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=February_12,_2024_KLONG_CPS_Design_Meeting&diff=124587February 12, 2024 KLONG CPS Design Meeting2024-02-07T20:46:59Z<p>Whitey: Created page with "== Meeting Time and Place == Monday, February 12, 2024, 1pm Hall D Counting House * Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim W..."</p>
<hr />
<div>== Meeting Time and Place ==<br />
Monday, February 12, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* Review minutes from last meeting <br />
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)<br />
<br />
** Pavel Presentation [[media:Conceptual Design of CPS Eng.Mtg. 01-16-24.pdf]]<br />
* Magnet update (Josh)<br />
* Develop path forward for final design (meetings/schedule etc...) (all)<br />
<br />
== Minutes ==<br />
<br />
* Discussed background of the project and the goal of getting the design completed in a little over a year<br />
* Pavel presented the current conceptual design based on his analysis<br />
** Copper radiator <br />
*** Operate remotely<br />
*** 300 micron repeatability<br />
*** 2 thicknesses plus blank<br />
*** 2cm diameter?<br />
*** rad hard materials (no encoder)<br />
*** maybe proximity switch/LVDT for positions<br />
** Need to develop a complete thermal model as design progresses<br />
** Use of a steel core for support<br />
** overall alignment of magnet and radiator to be within a few hundred microns<br />
** Ability to move the assembly (with out magnets) completely out of the beam to the north wall<br />
** Ability to crane or forklift the core out during decommissioning<br />
** Total weight approximately 90 tonnes<br />
** Need temperature sensors on copper, lead and steel<br />
** Need to fine tune the thermal calcs on copper absorber<br />
** Need water temperature and flow meters<br />
** US magnet to be designed to 2x current plus 10%<br />
** Need tungsten block to absorb the electron beam on magnet failure<br />
** Consult with Hall C folks on their design experience of a CPS<br />
** Josh fine tuning the magnet design<br />
*** Moving coils 12cm from beamline<br />
*** maybe less steel<br />
<br />
== Action Items ==<br />
* Pavel to check into exporting his model in a compatible format for NX ( Open Scad etc...<br />
* Stephanie to look into importable files from her end<br />
* Tim to provide stp file of copper absorber from ANSYS for Designers (complete)<br />
* Tim to setup bi-weekly meetings<br />
* Tim to set up and Engineer/Designer detailed meeting</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=KLONG_CPS_Design_Meetings&diff=124586KLONG CPS Design Meetings2024-02-07T20:45:06Z<p>Whitey: </p>
<hr />
<div>* [[January 16, 2024 KLONG CPS Design Meeting]]<br />
* [[February 12, 2024 KLONG CPS Design Meeting]]</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=January_16,_2024_KLONG_CPS_Design_Meeting&diff=124400January 16, 2024 KLONG CPS Design Meeting2024-01-19T20:01:19Z<p>Whitey: /* Action Items */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Tuesday January 16, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* State goals of meetings (Tim/Hovanes)<br />
* Review Pavel's current design parameters for the entire CPT (Pavel)<br />
** Pavel Presentation [[media:Conceptual Design of CPS Eng.Mtg. 01-16-24.pdf]]<br />
* Magnet update (Josh)<br />
* Develop path forward for final design (meetings/schedule etc...) (all)<br />
<br />
== Minutes ==<br />
<br />
* Discussed background of the project and the goal of getting the design completed in a little over a year<br />
* Pavel presented the current conceptual design based on his analysis<br />
** Copper radiator <br />
*** Operate remotely<br />
*** 300 micron repeatability<br />
*** 2 thicknesses plus blank<br />
*** 2cm diameter?<br />
*** rad hard materials (no encoder)<br />
*** maybe proximity switch/LVDT for positions<br />
** Need to develop a complete thermal model as design progresses<br />
** Use of a steel core for support<br />
** overall alignment of magnet and radiator to be within a few hundred microns<br />
** Ability to move the assembly (with out magnets) completely out of the beam to the north wall<br />
** Ability to crane or forklift the core out during decommissioning<br />
** Total weight approximately 90 tonnes<br />
** Need temperature sensors on copper, lead and steel<br />
** Need to fine tune the thermal calcs on copper absorber<br />
** Need water temperature and flow meters<br />
** US magnet to be designed to 2x current plus 10%<br />
** Need tungsten block to absorb the electron beam on magnet failure<br />
** Consult with Hall C folks on their design experience of a CPS<br />
** Josh fine tuning the magnet design<br />
*** Moving coils 12cm from beamline<br />
*** maybe less steel<br />
<br />
== Action Items ==<br />
* Pavel to check into exporting his model in a compatible format for NX ( Open Scad etc...<br />
* Stephanie to look into importable files from her end<br />
* Tim to provide stp file of copper absorber from ANSYS for Designers (complete)<br />
* Tim to setup bi-weekly meetings<br />
* Tim to set up and Engineer/Designer detailed meeting</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=January_16,_2024_KLONG_CPS_Design_Meeting&diff=124399January 16, 2024 KLONG CPS Design Meeting2024-01-19T20:00:51Z<p>Whitey: /* Action Items */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Tuesday January 16, 2024, 1pm Hall D Counting House<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
<br />
* State goals of meetings (Tim/Hovanes)<br />
* Review Pavel's current design parameters for the entire CPT (Pavel)<br />
** Pavel Presentation [[media:Conceptual Design of CPS Eng.Mtg. 01-16-24.pdf]]<br />
* Magnet update (Josh)<br />
* Develop path forward for final design (meetings/schedule etc...) (all)<br />
<br />
== Minutes ==<br />
<br />
* Discussed background of the project and the goal of getting the design completed in a little over a year<br />
* Pavel presented the current conceptual design based on his analysis<br />
** Copper radiator <br />
*** Operate remotely<br />
*** 300 micron repeatability<br />
*** 2 thicknesses plus blank<br />
*** 2cm diameter?<br />
*** rad hard materials (no encoder)<br />
*** maybe proximity switch/LVDT for positions<br />
** Need to develop a complete thermal model as design progresses<br />
** Use of a steel core for support<br />
** overall alignment of magnet and radiator to be within a few hundred microns<br />
** Ability to move the assembly (with out magnets) completely out of the beam to the north wall<br />
** Ability to crane or forklift the core out during decommissioning<br />
** Total weight approximately 90 tonnes<br />
** Need temperature sensors on copper, lead and steel<br />
** Need to fine tune the thermal calcs on copper absorber<br />
** Need water temperature and flow meters<br />
** US magnet to be designed to 2x current plus 10%<br />
** Need tungsten block to absorb the electron beam on magnet failure<br />
** Consult with Hall C folks on their design experience of a CPS<br />
** Josh fine tuning the magnet design<br />
*** Moving coils 12cm from beamline<br />
*** maybe less steel<br />
<br />
== Action Items ==<br />
* Pavel to check into exporting his model in a compatible format for NX ( Open Scad etc...<br />
* Stephanie to look into importable files from her end<br />
* Tim to provide stp file from ANSYS for Designers (complete)<br />
* Tim to setup bi-weekly meetings<br />
* Tim to set up and Engineer/Designer detailed meeting</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=January_18,_2024_KLONG_KPT_post_Review_Design_Meeting&diff=124398January 18, 2024 KLONG KPT post Review Design Meeting2024-01-19T17:47:29Z<p>Whitey: /* Minutes/Actions */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Thursday January 18, 2024, 1pm<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Igor Strakovsky, Tim Whitlatch, Vitaly Baturin, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
Discuss changes being made as a result of the review last fall<br />
<br />
** link to KLF wiki https://wiki.jlab.org/klproject/index.php/Main_Page<br />
<br />
<br />
== Minutes/Actions ==<br />
<br />
* Tungsten absorber changed from 15.2 cm square to 14.2 cm square<br />
* Is existing 10" Kapton window adequate for KLONG radiation dosage? (Igor/Tim)<br />
** Kapton is good for 6x10^9 RADS<br />
* Is there enough space for a profiler and active collimator?<br />
** Assume current AC and new profiler<br />
** Bring AC and profiler 3D models into existing KPT model (Keith)<br />
* Need to flip the location of the KPT assy to move north upon reinstall of GlueX (Keith)<br />
* Need to address thermal fatigue of tungsten and beryllium by June (Tim)<br />
* The review recommended an FMEA be performed for system failures such as cooling and power (Tim)<br />
* Need to develop a plan for decommissioning and design but not procure the needed items (Tim)<br />
* Make sure the tungsten composition is defined properly in power deposition and thermal models (Tim/Vitaly<br />
* Hall A had some experience with tungsten heating<br />
* We need to make sure RADCON approves the current design (Hovanes)<br />
* Need to reissue overall layout for review (Keith)<br />
<br />
== Action Items ==</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=January_18,_2024_KLONG_KPT_post_Review_Design_Meeting&diff=124397January 18, 2024 KLONG KPT post Review Design Meeting2024-01-19T17:47:02Z<p>Whitey: /* Minutes/Actions */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Thursday January 18, 2024, 1pm<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Igor Strakovsky, Tim Whitlatch, Vitaly Baturin, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
Discuss changes being made as a result of the review last fall<br />
<br />
** link to KLF wiki https://wiki.jlab.org/klproject/index.php/Main_Page<br />
<br />
<br />
== Minutes/Actions ==<br />
<br />
* Tungsten absorber changed from 15.2 cm square to 14.2 cm square<br />
* Is existing 10" Kapton window adequate for KLONG radiation dosage? (Igor/Tim)<br />
** Kapton is good for 6ee9 RADS<br />
* Is there enough space for a profiler and active collimator?<br />
** Assume current AC and new profiler<br />
** Bring AC and profiler 3D models into existing KPT model (Keith)<br />
* Need to flip the location of the KPT assy to move north upon reinstall of GlueX (Keith)<br />
* Need to address thermal fatigue of tungsten and beryllium by June (Tim)<br />
* The review recommended an FMEA be performed for system failures such as cooling and power (Tim)<br />
* Need to develop a plan for decommissioning and design but not procure the needed items (Tim)<br />
* Make sure the tungsten composition is defined properly in power deposition and thermal models (Tim/Vitaly<br />
* Hall A had some experience with tungsten heating<br />
* We need to make sure RADCON approves the current design (Hovanes)<br />
* Need to reissue overall layout for review (Keith)<br />
<br />
== Action Items ==</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=January_18,_2024_KLONG_KPT_post_Review_Design_Meeting&diff=124370January 18, 2024 KLONG KPT post Review Design Meeting2024-01-18T20:02:14Z<p>Whitey: </p>
<hr />
<div>== Meeting Time and Place ==<br />
Thursday January 18, 2024, 1pm<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Igor Strakovsky, Tim Whitlatch, Vitaly Baturin, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
Discuss changes being made as a result of the review last fall<br />
<br />
** link to KLF wiki https://wiki.jlab.org/klproject/index.php/Main_Page<br />
<br />
<br />
== Minutes/Actions ==<br />
<br />
* Tungsten absorber changed from 15.2 cm square to 14.2 cm square<br />
* Is existing 10" Kapton window adequate for KLONG radiation dosage? (Igor/Tim)<br />
* Is there enough space for a profiler and active collimator?<br />
** Assume current AC and new profiler<br />
** Bring AC and profiler 3D models into existing KPT model (Keith)<br />
* Need to flip the location of the KPT assy to move north upon reinstall of GlueX (Keith)<br />
* Need to address thermal fatigue of tungsten and beryllium by June (Tim)<br />
* The review recommended an FMEA be performed for system failures such as cooling and power (Tim)<br />
* Need to develop a plan for decommissioning and design but not procure the needed items (Tim)<br />
* Make sure the tungsten composition is defined properly in power deposition and thermal models (Tim/Vitaly<br />
* Hall A had some experience with tungsten heating<br />
* We need to make sure RADCON approves the current design (Hovanes)<br />
* Need to reissue overall layout for review (Keith)<br />
<br />
== Action Items ==</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=January_18,_2024_KLONG_KPT_post_Review_Design_Meeting&diff=124369January 18, 2024 KLONG KPT post Review Design Meeting2024-01-18T20:01:50Z<p>Whitey: /* Meeting Time and Place */</p>
<hr />
<div>== Meeting Time and Place ==<br />
Thursday January 18, 2024, 1pm<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Igor Strakovsky, Tim Whitlatch, Vitaly Baturin, Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
Discuss changes being made as a result of the review last fall<br />
<br />
** link to KLF wiki https://wiki.jlab.org/klproject/index.php/Main_Page<br />
<br />
<br />
== Minutes/Actions ==<br />
<br />
* Tungsten absorber changed from 15.2 cm square to 14.2 cm square<br />
* Is existing 10" Kapton window adequate for KLONG radiation dosage? (Igor/Tim)<br />
* Is there enough space for a profiler and active collimator?<br />
** Assume current AC and new profiler<br />
** Bring AC and profiler 3D models into existing KPT model (Keith)<br />
* Need to flip the location of the KPT assy to move north upon reinstall of GlueX (Keith)<br />
* Need to address thermal fatigue of tungsten and beryllium by June (Tim)<br />
* The review recommended an FMEA be performed for system failures such as cooling and power (Tim)<br />
* Need to develop a plan for decommissioning and design but not procure the needed items (Tim)<br />
* Make sure the tungsten composition is defined properly in power deposition and thermal models (Tim/Vitaly<br />
* Hall A had some experience with tungsten heating<br />
* We need to make sure RADCON approves the current design (Hovanes)<br />
* Need to reissue overall layout for review (Keith)<br />
<br />
== Action Items ==</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=January_18,_2024_KLONG_KPT_post_Review_Design_Meeting&diff=124368January 18, 2024 KLONG KPT post Review Design Meeting2024-01-18T20:01:29Z<p>Whitey: </p>
<hr />
<div>== Meeting Time and Place ==<br />
Thursday January 18, 2024, 1pm<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Igor Strakovsky, Tim Whitlatch, Vitaly Baturin,<br />
Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
Discuss changes being made as a result of the review last fall<br />
<br />
** link to KLF wiki https://wiki.jlab.org/klproject/index.php/Main_Page<br />
<br />
<br />
== Minutes/Actions ==<br />
<br />
* Tungsten absorber changed from 15.2 cm square to 14.2 cm square<br />
* Is existing 10" Kapton window adequate for KLONG radiation dosage? (Igor/Tim)<br />
* Is there enough space for a profiler and active collimator?<br />
** Assume current AC and new profiler<br />
** Bring AC and profiler 3D models into existing KPT model (Keith)<br />
* Need to flip the location of the KPT assy to move north upon reinstall of GlueX (Keith)<br />
* Need to address thermal fatigue of tungsten and beryllium by June (Tim)<br />
* The review recommended an FMEA be performed for system failures such as cooling and power (Tim)<br />
* Need to develop a plan for decommissioning and design but not procure the needed items (Tim)<br />
* Make sure the tungsten composition is defined properly in power deposition and thermal models (Tim/Vitaly<br />
* Hall A had some experience with tungsten heating<br />
* We need to make sure RADCON approves the current design (Hovanes)<br />
* Need to reissue overall layout for review (Keith)<br />
<br />
== Action Items ==</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=January_18,_2024_KLONG_KPT_post_Review_Design_Meeting&diff=124367January 18, 2024 KLONG KPT post Review Design Meeting2024-01-18T19:59:57Z<p>Whitey: Created page with "== Meeting Time and Place == Thursday January 18, 2024, 1pm Zoom https://jlab-org.zoomgov.com/j/1611857466?pwd=VEZndTZzdDdNOUdJU3NxblRLcVoxdz09&from=addon * Invited - Hova..."</p>
<hr />
<div>== Meeting Time and Place ==<br />
Thursday January 18, 2024, 1pm<br />
<br />
Zoom https://jlab-org.zoomgov.com/j/1611857466?pwd=VEZndTZzdDdNOUdJU3NxblRLcVoxdz09&from=addon<br />
<br />
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Igor Strakovsky, Tim Whitlatch, Vitaly Baturin,<br />
Eugene Chudakov, Josh Ballard<br />
<br />
== Agenda ==<br />
Discuss changes being made as a result of the review last fall<br />
<br />
** link to KLF wiki https://wiki.jlab.org/klproject/index.php/Main_Page<br />
<br />
<br />
== Minutes/Actions ==<br />
<br />
* Tungsten absorber changed from 15.2 cm square to 14.2 cm square<br />
* Is existing 10" Kapton window adequate for KLONG radiation dosage? (Igor/Tim)<br />
* Is there enough space for a profiler and active collimator?<br />
** Assume current AC and new profiler<br />
** Bring AC and profiler 3D models into existing KPT model (Keith)<br />
* Need to flip the location of the KPT assy to move north upon reinstall of GlueX (Keith)<br />
* Need to address thermal fatigue of tungsten and beryllium by June (Tim)<br />
* The review recommended an FMEA be performed for system failures such as cooling and power (Tim)<br />
* Need to develop a plan for decommissioning and design but not procure the needed items (Tim)<br />
* Make sure the tungsten composition is defined properly in power deposition and thermal models (Tim/Vitaly<br />
* Hall A had some experience with tungsten heating<br />
* We need to make sure RADCON approves the current design (Hovanes)<br />
* Need to reissue overall layout for review (Keith)<br />
<br />
== Action Items ==</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=KLONG_KPT_Design_Meetings&diff=124366KLONG KPT Design Meetings2024-01-18T19:38:39Z<p>Whitey: </p>
<hr />
<div>* [[June 10, 2021 KLONG Design Meeting]]<br />
* [[June 24, 2021 KLONG Design Meeting]]<br />
* [[July 08, 2021 KLONG Design Meeting]]<br />
* [[July 22, 2021 KLONG Design Meeting]]<br />
* [[August 19, 2021 KLONG Design Meeting]]<br />
* [[September 2, 2021 KLONG Design Meeting]]<br />
* [[October 14, 2021 KLONG Design Meeting]]<br />
* [[December 09, 2021 KLONG Design Meeting]]<br />
* [[January 20, 2022 KLONG Phase II Design Meeting]]<br />
* [[February 17, 2022 KLONG Phase II Design Meeting]]<br />
* [[March 03, 2022 KLONG Phase II Design Meeting]]<br />
* [[April 14, 2022 KLONG Phase II Design Meeting]]<br />
* [[January 18, 2024 KLONG KPT post Review Design Meeting]]</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=Meetings&diff=124365Meetings2024-01-18T19:37:17Z<p>Whitey: /* Technical and Hardware Meetings */</p>
<hr />
<div><br />
== High Level Meetings ==<br />
<br />
<table><tr><br />
<td width=300 valign="top"><br />
<br />
Quick Reference: [https://halldweb.jlab.org/wiki-private/index.php/Connect_to_ZoomGov_Meetings GlueX ZoomGov (private)]<br />
* [[GlueX-Collaboration-Meetings | GlueX Collaboration Meetings]]<br />
** [[GlueX-Collaboration-Feb-2024 | February 2024 Meeting]]<br />
** [[Workshop on Polarized Target Studies with Real Photons in Hall D]] (Wednesday 21 February 2024, Hybrid)<br />
* [[Hall-D Weekly Meeting | GlueX Biweekly Meetings]]<br />
* [https://halldweb.jlab.org/wiki-private/index.php/Production_and_Analysis_Working_Group Calibration and Production Meetings (private)]<br />
* [https://halldweb.jlab.org/wiki-private/index.php/Physics_Working_Group_Meetings Physics Working Group Meetings (private)]<br />
* [https://halldweb.jlab.org/wiki-private/index.php/Open_Analysis_Discussions Tuesday Afternoon Open Analysis Discussion (private)]<br />
* [https://halldweb.jlab.org/wiki-private/index.php/GlueX_Practice_Talks Practice Talks (private)]<br />
* Run Coordination<br />
** [[Run_Coordination_Meetings:Spring2023 | Spring 2023 Run (GlueX)]]<br />
** [[Run_Coordination_Meetings:Fall2022|Run Coordination Meetings: Fall 2022 Run (PrimEx)]]<br />
* [[GlueX Phase III Planning]]<br />
* [[Software Tutorials/Workshops]]<br />
* [[Reviews | GlueX Project Reviews]]<br />
* [[Collaboration Board | Collaboration Board Meetings]]<br />
</td><br />
<td width=300 valign="top"><br />
[[Image:JLB_5981.jpg|300px]]<br />
</td><br />
</tr><br />
</table><br />
<br />
== Technical and Hardware Meetings ==<br />
<br />
<table><tr><br />
<td width=300 valign="top"><br />
Quick Reference: [https://halldweb.jlab.org/wiki-private/index.php/Connect_to_ZoomGov_Meetings GlueX ZoomGov (private)]<br />
* [[Calorimetry Meetings]]<br />
* [[JEF Meetings|JLab Eta Factory (JEF) Hardware and Physics]] <br />
* [https://halldweb.jlab.org/wiki-private/index.php/Tracking Tracking Meetings (private)]<br />
* [[Tagged Beam Group Biweekly Meetings| Photon Beam and Tagger]]<br />
* [[GlueX Time-of-Flight Bi-Weekly Meetings|Time-of-Flight]]<br />
* [[Start Counter Bi-Weekly Meetings|Start Counter]]<br />
* [[GlueX PID Bi-Weekly Meetings|PID Working Group]]<br />
* [[GlueX Upgrade PID Meetings|Detection of Internally Reflected Cherenkov light (DIRC)]]<br />
* Engineering<br />
** [[FCAL 2 Installation Meetings]]<br />
** [[FCAL 2 Design Meetings]]<br />
** [[JLAB Engineering Design and Fab meeting]]<br />
** [[KLONG KPT Design Meetings]]<br />
** [[KLONG CPS Design Meetings]]<br />
* Offline Software<br />
** [[GlueX Offline Software Meetings]]<br />
** [[GlueX Software Review Meetings]]<br />
** [https://halldweb1.jlab.org/wiki/index.php/HallD_AI/ML_Meetings Hall D AI/ML Meetings]<br />
* [[Controls_Meetings | Online Controls Meetings]]<br />
</td><br />
<td width=300 valign="top"><br />
[[Image:Painted_magnet.jpg|275px]]<br />
</td><br />
</tr><br />
</table><br />
<br />
== Topical Analysis Meetings ==<br />
<br />
<table><br />
<tr><br />
<td width=300 valign="top"><br />
=== Analysis Working Groups ===<br />
* [https://halldweb.jlab.org/wiki-private/index.php/Amplitude_Analysis_Working_Group_Meetings Amplitude Analysis Working Group (private)]<br />
* [https://halldweb.jlab.org/wiki-private/index.php/Beam_Asymmetry_Private &Sigma; Working Group Meetings (private)]<br />
* [https://halldweb.jlab.org/wiki-private/index.php/Cross_Section_Working_Group_Meetings Cross Section Working Group (private)]<br />
* [https://halldweb.jlab.org/wiki-private/index.php/Dilepton_Working_Group_Meetings Dilepton Working Group (private)] <br />
* [https://halldweb.jlab.org/wiki-private/index.php/PrimEx-Eta_Weekly_Meeting PrimEx &eta; Working Group (private)]<br />
* [[JEF Meetings|JLab Eta Factory (JEF) Hardware and Physics]] <br />
* [[Π_polarizability_Meetings | Pion Polarizability Working Group]]<br />
</td><br />
<td valign="top"><br />
=== Other Meetings and Discussions ===<br />
* [https://halldweb.jlab.org/wiki-private/index.php/Light_Meson_Decays Light Meson Decays Discussions (private)]<br />
* [https://halldweb.jlab.org/wiki-private/index.php/Vector_Pseudoscalar_Working_Group_Meetings Vector Pseudoscalar Discussions (private)]<br />
* [https://halldweb.jlab.org/wiki-private/index.php/Open_Analysis_Discussions Tuesday Afternoon Open Analysis Discussion (private)]<br />
</td><br />
</tr><br />
</table><br />
<br />
== The Archives ==<br />
<br />
<div class="toccolours mw-collapsible mw-collapsed"><br />
Click "expand" to the right to see the archive &rarr;<br />
<div class="mw-collapsible-content"><br />
<br />
=== Workshop Archive ===<br />
* [[Two-Meson Photoproduction Workshop]], September 18, 2019<br />
* Joint GlueX-PANDA Workshop [https://www.jlab.org/conference/gluex-panda2019] May 3-5, 2019<br />
* HIPS [https://www.jlab.org/conferences/HIPS2017/] February 6-7, 2017.<br />
* YSTAR [https://www.jlab.org/conferences/YSTAR2016/ Workshop] November 16-17, 2016. mini-Proceedings [https://arxiv.org/pdf/1701.07346v1.pdf].<br />
* [[GlueX_Physics_Workshop_2016|The May Physics / Analysis Workshop]] May 2016.<br />
* [https://www.jlab.org/conferences/photoproduction16/ Nuclear Photoproduction with GlueX] April 28-29, 2016.<br />
* K<sub>L</sub> [https://www.jlab.org/conferences/kl2016/ Workshop] February 1-3, 2016. mini-Proceedings [https://arxiv.org/pdf/1604.02141v1.pdf].<br />
* Photon-hadron physics with the GlueX detector at JLab ([http://www.jlab.org/Hall-D/meetings/php2008/program.html Program]) (2008).<br />
<br />
=== Old Meetings Archive ===<br />
<br />
The list below contains bullets and links that have been pruned from the various subcategories above over the years. Many of these items link to a page that has links of agendas from many years ago. If for some reason a particular activity below becomes "reactivated" then please relocate the page from the list below to an appropriate table of active meetings at the top of the page.<br />
<br />
* [https://www.jlab.org/Hall-D/workshop_old.html GlueX Meetings from 2000-2007]: these are archived on the Hall D web site<br />
* [[May 2008 Subsystem Review | May 2008 Subsystems Review]]<br />
* [[GlueX-Online-Workshop-2009 | GlueX Online Workshop]] July 2009 at CNU<br />
* [[12 GeV Trigger/Online Workshop | 12 GeV Trigger/Online Workshop]] July 2010 at CNU<br />
* [[Electronics Trigger Meetings|Trigger Electronics Meeting Minutes]]<br />
* [[Tracking Meetings|Tracking Meetings - public wiki]]<br />
* [[FDC_Meetings | FDC Meetings (Tracking)]]<br />
* [[FADC_FPGA_Programming_Meetings|FA125 Meetings (Tracking)]]<br />
* [[DC and PID Review]]<br />
* [[GlueX Target Meetings]]<br />
* [[Solenoid Meetings]]<br />
* [[Special meeting on planning for a stable TAC run 4/6/2018]]<br />
* [[PID Progress|PID Progress (from 2007 workshop)]]<br />
* [[May 2007 PID Workshop]]<br />
* [[July 2007 PID Workshop]]<br />
* [[GlueX Data Challenge Meetings]]<br />
* [[February 2009 Tutorial]]<br />
* [[GlueX Calibration Working Group Meetings]]<br />
* [[GlueX Analysis Workshop 2013]] ([https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2272 Report] on the Wokshop)<br />
* [[GlueX Physics Workshop 2016]]<br />
* [[GlueX Containers Meetings]]<br />
* [[HDGeant4 Meetings]]<br />
* [[GlueX/Hall-D Installation Meetings]]<br />
* [[BCAL Installation Schedule]]<br />
* [[Geant4 Upgrade Meetings]]<br />
* [[FCAl DAQ Meetings]]<br />
* [[DIRC Review Meeting]]<br />
* [[GlueX Upgrade Meetings | GlueX Upgrade from 2012]] <br />
* [[Electronics_Trigger_Meetings|Electronics Trigger Meetings]]<br />
* [[Electronics Workshops/Pre-meetings| Electronics Workshops/Pre-meetings]]<br />
* [[fADC FPGA Programming Meetings]]<br />
* [[Connect to Bluejeans Meetings]] (deprecated)<br />
* [[GlueX Communications]]<br />
* [[JLab Contacts for Meetings]]<br />
* [[Transitioning from BlueJeans to Zoom]]<br />
* [[Want to connect? Read here first]]<br />
* [[Analysis Working Group Meetings| Production & Analysis Meetings (old public agendas)]]<br />
* [[Physics Simulation Meetings | Physics Simulation Meetings (old)]] <br />
* [[Physics Working Group Meetings | Physics Working Group Meetings (old public agendas)]] <br />
* [https://halldweb.jlab.org/wiki-private/index.php/Eta/Eta-prime_Private Eta and Eta-prime and related analyses]<br />
* [https://halldweb.jlab.org/wiki-private/index.php/Hyperon_Informal_Working_Group Hyperon Informal Working Group]<br />
* [https://halldweb.jlab.org/wiki-private/index.php/Hyperon_Working_Group Hyperon Working Group (private)] inactive: analyses transitioned to other working groups<br />
* [[Practice Talks | Practice Talks (old public page)]]<br />
* [https://halldweb.jlab.org/wiki-private/index.php/Private:Shift_Policy_for_GlueX Shift Policy Meetings (2014)]<br />
* [[Ad Hoc Meetings]]<br />
* [[PAC Presentations | PAC39 Preparations]]<br />
* [[Calorimetry Archives]]<br />
* [[CPP Design Meetings]]<br />
* [[ Trigger Commissioning Meetings|Trigger Commissioning Meetings]]<br />
* [[Level-3 Trigger Meetings]]<br />
* [[Trigger Working Group Meetings]]<br />
* [[GlueX/Primex Meetings (old)]]<br />
* [[Trigger/DAQ/Monitoring/Controls Meetings|Online Working Group Meetings]]<br />
* [[Run_Coordination_Meetings:Spring2023|Run Coordination Meetings: Spring 2023 Run (GlueX)]]<br />
* [[Run_Coordination_Meetings:Fall2022|Run Coordination Meetings: Fall 2022 Run (PrimEx)]]<br />
* [[Run_Coordination_Meetings:Summer2022|Run Coordination Meetings: Summer 2022 Run]]<br />
* [[Run Coordination Meetings:Fall2021|Run Coordination Meetings: Fall 2021 Run]]<br />
* [[Run Coordination Meetings:Summer2021|Run Coordination Meetings: Summer 2021 Run]]<br />
* [[Run Coordination Meetings:Summer2020|Run Coordination Meetings: Summer 2020 Run]]<br />
* [[Run Coordination Meetings:Fall2019 Run|Run Coordination Meetings: Fall 2019 / Spring 2020 Run]]<br />
* [[Run Coordination Meetings:Spring2019 Run|Run Coordination Meetings: Spring 2019 Run ]]<br />
* [[Run Coordination Meetings:Fall2018 Run|Run Coordination Meetings: Fall 2018 Run]]<br />
* [[Run Coordination Meetings:Fall2017 Spring2018 Run|Run Coordination Meetings: Spring 2018 Run]]<br />
* [[Run Coordination Meetings: Spring 2017 Run]]<br />
* [[Run Coordination Meetings: Fall 2016 Run]]<br />
* [[Run Coordination Meetings: Spring 2016 Run]]<br />
* [[Run Coordination Meetings: Fall 2015 Run]]<br />
* [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Spring_run Run Coordination Meetings: Spring 2015 run]<br />
* [[Key Performance Parameters]]<br />
* [https://halldweb.jlab.org/hdops/wiki/index.php/Post-thanksgiving_period Post-Thanksgiving Running (Fall 2014)]<br />
* [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Fall_run Run Coordination Meetings: Fall 2014 run]<br />
* [[Pi0 polarizability Meetings|Neutral Pion Polarizability Meetings]]<br />
* [[TRD| TRD from 20016]]<br />
<br />
</div><br />
</div></div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=KLONG_KPT_Design_Meetings&diff=124364KLONG KPT Design Meetings2024-01-18T19:36:38Z<p>Whitey: Created page with "* June 10, 2021 KLONG Design Meeting * June 24, 2021 KLONG Design Meeting * July 08, 2021 KLONG Design Meeting * July 22, 2021 KLONG Design Meeting * August..."</p>
<hr />
<div>* [[June 10, 2021 KLONG Design Meeting]]<br />
* [[June 24, 2021 KLONG Design Meeting]]<br />
* [[July 08, 2021 KLONG Design Meeting]]<br />
* [[July 22, 2021 KLONG Design Meeting]]<br />
* [[August 19, 2021 KLONG Design Meeting]]<br />
* [[September 2, 2021 KLONG Design Meeting]]<br />
* [[October 14, 2021 KLONG Design Meeting]]<br />
* [[December 09, 2021 KLONG Design Meeting]]<br />
* [[January 20, 2022 KLONG Phase II Design Meeting]]<br />
* [[February 17, 2022 KLONG Phase II Design Meeting]]<br />
* [[March 03, 2022 KLONG Phase II Design Meeting]]<br />
* [[April 14, 2022 KLONG Phase II Design Meeting]]</div>Whiteyhttps://halldweb1.jlab.org/wiki/index.php?title=Meetings&diff=124363Meetings2024-01-18T19:36:09Z<p>Whitey: /* Technical and Hardware Meetings */</p>
<hr />
<div><br />
== High Level Meetings ==<br />
<br />
<table><tr><br />
<td width=300 valign="top"><br />
<br />
Quick Reference: [https://halldweb.jlab.org/wiki-private/index.php/Connect_to_ZoomGov_Meetings GlueX ZoomGov (private)]<br />
* [[GlueX-Collaboration-Meetings | GlueX Collaboration Meetings]]<br />
** [[GlueX-Collaboration-Feb-2024 | February 2024 Meeting]]<br />
** [[Workshop on Polarized Target Studies with Real Photons in Hall D]] (Wednesday 21 February 2024, Hybrid)<br />
* [[Hall-D Weekly Meeting | GlueX Biweekly Meetings]]<br />
* [https://halldweb.jlab.org/wiki-private/index.php/Production_and_Analysis_Working_Group Calibration and Production Meetings (private)]<br />
* [https://halldweb.jlab.org/wiki-private/index.php/Physics_Working_Group_Meetings Physics Working Group Meetings (private)]<br />
* [https://halldweb.jlab.org/wiki-private/index.php/Open_Analysis_Discussions Tuesday Afternoon Open Analysis Discussion (private)]<br />
* [https://halldweb.jlab.org/wiki-private/index.php/GlueX_Practice_Talks Practice Talks (private)]<br />
* Run Coordination<br />
** [[Run_Coordination_Meetings:Spring2023 | Spring 2023 Run (GlueX)]]<br />
** [[Run_Coordination_Meetings:Fall2022|Run Coordination Meetings: Fall 2022 Run (PrimEx)]]<br />
* [[GlueX Phase III Planning]]<br />
* [[Software Tutorials/Workshops]]<br />
* [[Reviews | GlueX Project Reviews]]<br />
* [[Collaboration Board | Collaboration Board Meetings]]<br />
</td><br />
<td width=300 valign="top"><br />
[[Image:JLB_5981.jpg|300px]]<br />
</td><br />
</tr><br />
</table><br />
<br />
== Technical and Hardware Meetings ==<br />
<br />
<table><tr><br />
<td width=300 valign="top"><br />
Quick Reference: [https://halldweb.jlab.org/wiki-private/index.php/Connect_to_ZoomGov_Meetings GlueX ZoomGov (private)]<br />
* [[Calorimetry Meetings]]<br />
* [[JEF Meetings|JLab Eta Factory (JEF) Hardware and Physics]] <br />
* [https://halldweb.jlab.org/wiki-private/index.php/Tracking Tracking Meetings (private)]<br />
* [[Tagged Beam Group Biweekly Meetings| Photon Beam and Tagger]]<br />
* [[GlueX Time-of-Flight Bi-Weekly Meetings|Time-of-Flight]]<br />
* [[Start Counter Bi-Weekly Meetings|Start Counter]]<br />
* [[GlueX PID Bi-Weekly Meetings|PID Working Group]]<br />
* [[GlueX Upgrade PID Meetings|Detection of Internally Reflected Cherenkov light (DIRC)]]<br />
* Engineering<br />
** [[FCAL 2 Installation Meetings]]<br />
** [[FCAL 2 Design Meetings]]<br />
** [[JLAB Engineering Design and Fab meeting]]<br />
** [[KLONG Design Meetings]]<br />
** [[KLONG KPT Design Meetings]]<br />
** [[KLONG CPS Design Meetings]]<br />
* Offline Software<br />
** [[GlueX Offline Software Meetings]]<br />
** [[GlueX Software Review Meetings]]<br />
** [https://halldweb1.jlab.org/wiki/index.php/HallD_AI/ML_Meetings Hall D AI/ML Meetings]<br />
* [[Controls_Meetings | Online Controls Meetings]]<br />
</td><br />
<td width=300 valign="top"><br />
[[Image:Painted_magnet.jpg|275px]]<br />
</td><br />
</tr><br />
</table><br />
<br />
== Topical Analysis Meetings ==<br />
<br />
<table><br />
<tr><br />
<td width=300 valign="top"><br />
=== Analysis Working Groups ===<br />
* [https://halldweb.jlab.org/wiki-private/index.php/Amplitude_Analysis_Working_Group_Meetings Amplitude Analysis Working Group (private)]<br />
* [https://halldweb.jlab.org/wiki-private/index.php/Beam_Asymmetry_Private &Sigma; Working Group Meetings (private)]<br />
* [https://halldweb.jlab.org/wiki-private/index.php/Cross_Section_Working_Group_Meetings Cross Section Working Group (private)]<br />
* [https://halldweb.jlab.org/wiki-private/index.php/Dilepton_Working_Group_Meetings Dilepton Working Group (private)] <br />
* [https://halldweb.jlab.org/wiki-private/index.php/PrimEx-Eta_Weekly_Meeting PrimEx &eta; Working Group (private)]<br />
* [[JEF Meetings|JLab Eta Factory (JEF) Hardware and Physics]] <br />
* [[Π_polarizability_Meetings | Pion Polarizability Working Group]]<br />
</td><br />
<td valign="top"><br />
=== Other Meetings and Discussions ===<br />
* [https://halldweb.jlab.org/wiki-private/index.php/Light_Meson_Decays Light Meson Decays Discussions (private)]<br />
* [https://halldweb.jlab.org/wiki-private/index.php/Vector_Pseudoscalar_Working_Group_Meetings Vector Pseudoscalar Discussions (private)]<br />
* [https://halldweb.jlab.org/wiki-private/index.php/Open_Analysis_Discussions Tuesday Afternoon Open Analysis Discussion (private)]<br />
</td><br />
</tr><br />
</table><br />
<br />
== The Archives ==<br />
<br />
<div class="toccolours mw-collapsible mw-collapsed"><br />
Click "expand" to the right to see the archive &rarr;<br />
<div class="mw-collapsible-content"><br />
<br />
=== Workshop Archive ===<br />
* [[Two-Meson Photoproduction Workshop]], September 18, 2019<br />
* Joint GlueX-PANDA Workshop [https://www.jlab.org/conference/gluex-panda2019] May 3-5, 2019<br />
* HIPS [https://www.jlab.org/conferences/HIPS2017/] February 6-7, 2017.<br />
* YSTAR [https://www.jlab.org/conferences/YSTAR2016/ Workshop] November 16-17, 2016. mini-Proceedings [https://arxiv.org/pdf/1701.07346v1.pdf].<br />
* [[GlueX_Physics_Workshop_2016|The May Physics / Analysis Workshop]] May 2016.<br />
* [https://www.jlab.org/conferences/photoproduction16/ Nuclear Photoproduction with GlueX] April 28-29, 2016.<br />
* K<sub>L</sub> [https://www.jlab.org/conferences/kl2016/ Workshop] February 1-3, 2016. mini-Proceedings [https://arxiv.org/pdf/1604.02141v1.pdf].<br />
* Photon-hadron physics with the GlueX detector at JLab ([http://www.jlab.org/Hall-D/meetings/php2008/program.html Program]) (2008).<br />
<br />
=== Old Meetings Archive ===<br />
<br />
The list below contains bullets and links that have been pruned from the various subcategories above over the years. Many of these items link to a page that has links of agendas from many years ago. If for some reason a particular activity below becomes "reactivated" then please relocate the page from the list below to an appropriate table of active meetings at the top of the page.<br />
<br />
* [https://www.jlab.org/Hall-D/workshop_old.html GlueX Meetings from 2000-2007]: these are archived on the Hall D web site<br />
* [[May 2008 Subsystem Review | May 2008 Subsystems Review]]<br />
* [[GlueX-Online-Workshop-2009 | GlueX Online Workshop]] July 2009 at CNU<br />
* [[12 GeV Trigger/Online Workshop | 12 GeV Trigger/Online Workshop]] July 2010 at CNU<br />
* [[Electronics Trigger Meetings|Trigger Electronics Meeting Minutes]]<br />
* [[Tracking Meetings|Tracking Meetings - public wiki]]<br />
* [[FDC_Meetings | FDC Meetings (Tracking)]]<br />
* [[FADC_FPGA_Programming_Meetings|FA125 Meetings (Tracking)]]<br />
* [[DC and PID Review]]<br />
* [[GlueX Target Meetings]]<br />
* [[Solenoid Meetings]]<br />
* [[Special meeting on planning for a stable TAC run 4/6/2018]]<br />
* [[PID Progress|PID Progress (from 2007 workshop)]]<br />
* [[May 2007 PID Workshop]]<br />
* [[July 2007 PID Workshop]]<br />
* [[GlueX Data Challenge Meetings]]<br />
* [[February 2009 Tutorial]]<br />
* [[GlueX Calibration Working Group Meetings]]<br />
* [[GlueX Analysis Workshop 2013]] ([https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2272 Report] on the Wokshop)<br />
* [[GlueX Physics Workshop 2016]]<br />
* [[GlueX Containers Meetings]]<br />
* [[HDGeant4 Meetings]]<br />
* [[GlueX/Hall-D Installation Meetings]]<br />
* [[BCAL Installation Schedule]]<br />
* [[Geant4 Upgrade Meetings]]<br />
* [[FCAl DAQ Meetings]]<br />
* [[DIRC Review Meeting]]<br />
* [[GlueX Upgrade Meetings | GlueX Upgrade from 2012]] <br />
* [[Electronics_Trigger_Meetings|Electronics Trigger Meetings]]<br />
* [[Electronics Workshops/Pre-meetings| Electronics Workshops/Pre-meetings]]<br />
* [[fADC FPGA Programming Meetings]]<br />
* [[Connect to Bluejeans Meetings]] (deprecated)<br />
* [[GlueX Communications]]<br />
* [[JLab Contacts for Meetings]]<br />
* [[Transitioning from BlueJeans to Zoom]]<br />
* [[Want to connect? Read here first]]<br />
* [[Analysis Working Group Meetings| Production & Analysis Meetings (old public agendas)]]<br />
* [[Physics Simulation Meetings | Physics Simulation Meetings (old)]] <br />
* [[Physics Working Group Meetings | Physics Working Group Meetings (old public agendas)]] <br />
* [https://halldweb.jlab.org/wiki-private/index.php/Eta/Eta-prime_Private Eta and Eta-prime and related analyses]<br />
* [https://halldweb.jlab.org/wiki-private/index.php/Hyperon_Informal_Working_Group Hyperon Informal Working Group]<br />
* [https://halldweb.jlab.org/wiki-private/index.php/Hyperon_Working_Group Hyperon Working Group (private)] inactive: analyses transitioned to other working groups<br />
* [[Practice Talks | Practice Talks (old public page)]]<br />
* [https://halldweb.jlab.org/wiki-private/index.php/Private:Shift_Policy_for_GlueX Shift Policy Meetings (2014)]<br />
* [[Ad Hoc Meetings]]<br />
* [[PAC Presentations | PAC39 Preparations]]<br />
* [[Calorimetry Archives]]<br />
* [[CPP Design Meetings]]<br />
* [[ Trigger Commissioning Meetings|Trigger Commissioning Meetings]]<br />
* [[Level-3 Trigger Meetings]]<br />
* [[Trigger Working Group Meetings]]<br />
* [[GlueX/Primex Meetings (old)]]<br />
* [[Trigger/DAQ/Monitoring/Controls Meetings|Online Working Group Meetings]]<br />
* [[Run_Coordination_Meetings:Spring2023|Run Coordination Meetings: Spring 2023 Run (GlueX)]]<br />
* [[Run_Coordination_Meetings:Fall2022|Run Coordination Meetings: Fall 2022 Run (PrimEx)]]<br />
* [[Run_Coordination_Meetings:Summer2022|Run Coordination Meetings: Summer 2022 Run]]<br />
* [[Run Coordination Meetings:Fall2021|Run Coordination Meetings: Fall 2021 Run]]<br />
* [[Run Coordination Meetings:Summer2021|Run Coordination Meetings: Summer 2021 Run]]<br />
* [[Run Coordination Meetings:Summer2020|Run Coordination Meetings: Summer 2020 Run]]<br />
* [[Run Coordination Meetings:Fall2019 Run|Run Coordination Meetings: Fall 2019 / Spring 2020 Run]]<br />
* [[Run Coordination Meetings:Spring2019 Run|Run Coordination Meetings: Spring 2019 Run ]]<br />
* [[Run Coordination Meetings:Fall2018 Run|Run Coordination Meetings: Fall 2018 Run]]<br />
* [[Run Coordination Meetings:Fall2017 Spring2018 Run|Run Coordination Meetings: Spring 2018 Run]]<br />
* [[Run Coordination Meetings: Spring 2017 Run]]<br />
* [[Run Coordination Meetings: Fall 2016 Run]]<br />
* [[Run Coordination Meetings: Spring 2016 Run]]<br />
* [[Run Coordination Meetings: Fall 2015 Run]]<br />
* [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Spring_run Run Coordination Meetings: Spring 2015 run]<br />
* [[Key Performance Parameters]]<br />
* [https://halldweb.jlab.org/hdops/wiki/index.php/Post-thanksgiving_period Post-Thanksgiving Running (Fall 2014)]<br />
* [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Fall_run Run Coordination Meetings: Fall 2014 run]<br />
* [[Pi0 polarizability Meetings|Neutral Pion Polarizability Meetings]]<br />
* [[TRD| TRD from 20016]]<br />
<br />
</div><br />
</div></div>Whitey