MantisBT

View Issue Details Jump to Notes ] Issue History ] Print ]
IDProjectCategoryView StatusDate SubmittedLast Update
0000230Hall D OnlineControlspublic2012-04-04 15:362013-03-19 13:08
Reporterwolin 
Assigned Tospiegel 
PrioritynormalSeveritymajorReproducibilityN/A
StatusresolvedResolutionfixed 
PlatformOSOS Version
Summary0000230: Design and build new breakout box for solenoid controls testing
DescriptionDesign and construct four-coil breakout box for the solenoid controls system.
TagsNo tags attached.
Work by outside group for Hall DNo
Estimated man-weeks6
Percentage complete0
Actual man-weeks0
Attached Files

- Relationships

-  Notes
(0000488)
wolin (administrator)
2013-03-19 13:08

Completed a while ago.

- Issue History
Date Modified Username Field Change
2012-04-04 15:36 wolin New Issue
2012-04-04 15:36 wolin Work by outside group for Hall D => No
2012-04-04 15:36 wolin Estimated man-weeks => 6
2012-04-04 15:36 wolin Percentage complete => 0
2012-04-04 15:36 wolin Actual man-weeks => 0
2012-04-04 15:36 wolin Status new => assigned
2012-04-04 15:36 wolin Assigned To => spiegel
2012-04-05 09:00 wolin Summary Desing and build new breakout box for solenoid controls testing => Design and build new breakout box for solenoid controls testing
2012-04-05 11:22 spiegel Status assigned => acknowledged
2013-03-19 13:08 wolin Note Added: 0000488
2013-03-19 13:08 wolin Status acknowledged => resolved
2013-03-19 13:08 wolin Resolution open => fixed


Copyright © 2000 - 2024 MantisBT Team
Powered by Mantis Bugtracker