Anonymous | Login | Signup for a new account | 2025-05-14 10:44 EDT | ![]() |
My View | View Issues | Change Log | Roadmap |
View Issue Details [ Jump to Notes ] | [ Issue History ] [ Print ] | ||||||||||||
ID | Project | Category | View Status | Date Submitted | Last Update | ||||||||
0000337 | Hall D Online | Magnets | public | 2013-04-03 16:24 | 2013-07-18 09:14 | ||||||||
Reporter | wolin | ||||||||||||
Assigned To | wolin | ||||||||||||
Priority | normal | Severity | feature | Reproducibility | N/A | ||||||||
Status | feedback | Resolution | open | ||||||||||
Platform | OS | OS Version | |||||||||||
Summary | 0000337: Refurbish Danfysik power supply for production running | ||||||||||||
Description | Refurbish our boards, return Hall C boards, replace other components as needed, get Danfysik techs out here to check everything. | ||||||||||||
Tags | No tags attached. | ||||||||||||
Work by outside group for Hall D | No | ||||||||||||
Estimated man-weeks | 2 | ||||||||||||
Percentage complete | 0 | ||||||||||||
Actual man-weeks | 0 | ||||||||||||
Attached Files | |||||||||||||
![]() |
|
(0000508) wolin (administrator) 2013-04-03 16:25 |
Danfysik techs will be here this summer to work on supplies in other halls. Tim is organizing for them to work on our supply as well. |
(0000517) wolin (administrator) 2013-05-16 17:10 |
Need to tune for 25H instead of 2H (done for Hall A). Need to program ramp profile to get smooth voltage profile, including no overshoot. Probably need timer to inhibit quench detection when the contacter is first closed for (say) 100 ms. |
(0000533) wolin (administrator) 2013-06-14 10:19 edited on: 2013-06-14 10:20 |
Parts for tuning for 25H on the way from Danfysik. Giles figured out how to program hardware ramp profiles. Dave B will think about doing the same in the PLC. Note that the hardware has many constraints, including the number of points per profile and the number of profiles stored. The PLC has no constraints. Note that we'll need profiles for ramping up AND down. Further the PLC could generate ramp profiles on the fly based on start/end currents and number of steps, so nothing would need to be stored. |
(0000534) wolin (administrator) 2013-06-14 10:21 |
Waiting for parts to arrive. |
(0000545) wolin (administrator) 2013-06-25 16:59 |
Parts here, not sure if we'll install them before or after solenoid test. |
(0000553) wolin (administrator) 2013-07-18 09:13 |
Since we had innumerable delays in the cryo plant all parts were installed, FPGA programs were updated, etc. |
(0000554) wolin (administrator) 2013-07-18 09:14 |
We still probably want Danfysik techs to come out and go over the whole power supply. |
![]() |
|||
Date Modified | Username | Field | Change |
2013-04-03 16:24 | wolin | New Issue | |
2013-04-03 16:24 | wolin | Work by outside group for Hall D | => No |
2013-04-03 16:24 | wolin | Estimated man-weeks | => 2 |
2013-04-03 16:24 | wolin | Percentage complete | => 0 |
2013-04-03 16:24 | wolin | Actual man-weeks | => 0 |
2013-04-03 16:24 | wolin | Status | new => assigned |
2013-04-03 16:24 | wolin | Assigned To | => wolin |
2013-04-03 16:25 | wolin | Note Added: 0000508 | |
2013-04-03 16:25 | wolin | Status | assigned => acknowledged |
2013-05-16 17:10 | wolin | Note Added: 0000517 | |
2013-06-14 10:19 | wolin | Note Added: 0000533 | |
2013-06-14 10:20 | wolin | Note Edited: 0000533 | |
2013-06-14 10:21 | wolin | Note Added: 0000534 | |
2013-06-14 10:21 | wolin | Status | acknowledged => feedback |
2013-06-25 16:59 | wolin | Note Added: 0000545 | |
2013-07-18 09:13 | wolin | Note Added: 0000553 | |
2013-07-18 09:14 | wolin | Note Added: 0000554 |