Hall D Maintenance Status

Click the Last Maintenance date to update when the last maintenance was performed

Click the Task to view the long description of the task

Click here to add a new item to the Hall D maintenance maintainer

TASK Primary Contact Secondary Contact PERIOD (days) NEXT MAINTENANCE LAST MAINTENANCE
180 05/29/20 12/01/19
100ft/Lb Torque Wrch keithb@jlab.org dallen@jlab.org 365 12/21/21 12/21/20
150ft/lb Torque Wrch keithb@jlab.org dallen@jlab.org 365 12/21/21 12/21/20
250inlb Torque Wrenc keithb@jlab.org dallen@jlab.org 365 12/21/21 12/21/20
400ft/lb Torque Wren keithb@jlab.org dallen@jlab.org 365 12/21/21 12/21/20
90inlb Torque Wrench keithb@jlab.org dallen@jlab.org 365 12/21/21 12/21/20
Air Comp. Filter dallen@jlab.org bunton@jlab.org 365 12/06/22 12/06/21
Air Comp. Oil dallen@jlab.org bunton@jlab.org 365 12/06/22 12/06/21
Air System Relief spiegel@jlab.org whitey@jlab.org 1095 07/18/22 07/19/19
Air Tank Inspect spiegel@jlab.org whitey@jlab.org 1825 08/01/26 08/02/21
Air Tank Relief spiegel@jlab.org whitey@jlab.org 1095 07/18/22 07/19/19
Alcohol Bubbler dallen@jlab.org zihlmann@jlab.org 25 11/15/21 10/21/21
Alcohol Frig Coolent dallen@jlab.org spiegel@jlab.org 365 01/25/22 01/25/21
Ascroft 200PSI Gauge bunton@jlab.org jfoyles@jlab.org 350 03/23/21 04/07/20
Ascroft 60PSI Gauge bunton@jlab.org jfoyles@jlab.org 350 03/23/21 04/07/20
Ashcroft Gauge 600lb bunton@jlab.org jfoyles@jlab.org 330 03/03/21 04/07/20
Battery change out bunton@jlab.org spiegel@jlab.org 180 01/11/22 07/15/21
BCAL DE-GASING VALVE jfoyles@jlab.org dallen@jlab.org 720 11/08/22 11/18/20
BCAL DS Chiller Filt jfoyles@jlab.org dallen@jlab.org 220 10/24/21 03/18/21
BCAL DS Loop Filter jfoyles@jlab.org dallen@jlab.org 220 10/24/21 03/18/21
BCAL US Chiller Filt jfoyles@jlab.org dallen@jlab.org 220 10/24/21 03/18/21
BCAL US Loop Filter jfoyles@jlab.org dallen@jlab.org 220 10/24/21 03/18/21
COMPCAL Chiller Filt jfoyles@jlab.org bunton@jlab.org 180 10/16/21 04/19/21
Crane Wire Rope Visu jfoyles@jlab.org bunton@jlab.org 30 09/15/21 08/16/21
Danfysik Ann. Maint. bunton@jlab.org stevensm@jlab.org 365 07/22/22 07/22/21
Detector Agon 12 Pk. dallen@jlab.org pentchev@jlab.org 45 12/05/21 10/21/21
Detector CO2 Bottles dallen@jlab.org pentchev@jlab.org 31 11/21/21 10/21/21
DIRC ACME Grease keithb@jlab.org stevensm@jlab.org 365 07/31/22 07/31/21
DIRC N2 Purge Filter spiegel@jlab.org stevensm@jlab.org 1095 07/30/24 07/31/21
DIRC N2 Relif Valves keithb@jlab.org stevensm@jlab.org 1500 09/08/25 07/31/21
DIRC Opl. Box Filter jrsteven@jlab.org bunton@jlab.org 180 12/12/20 06/15/20
DIRC UV lamp replace keithb@jlab.org dallen@jlab.org 730 06/16/22 06/16/20
DIRC water filter keithb@jlab.org stevensm@jlab.org 368 08/12/22 08/09/21
DIRC water pump keithb@jlab.org stevensm@jlab.org 180 01/27/22 07/31/21
DIRC water quality keithb@jlab.org stevensm@jlab.org 100 11/19/21 08/11/21
Emergency Lighting keithb@jlab.org bunton@jlab.org 30 09/08/21 08/09/21
FCAL BL pump keithb@jlab.org dallen@jlab.org 360 07/26/22 07/31/21
FCAW Performance Log jfoyles@jlab.org 170 05/20/21 12/01/20
FDC Chiller Filter jfoyles@jlab.org dallen@jlab.org 180 04/12/22 10/14/21
Flood Gates Maint. jfoyles@jlab.org dallen@jlab.org 365 06/28/22 06/28/21
Gas Shed ODH bunton@jlab.org dallen@jlab.org 365 03/08/22 03/08/21
Gases Relief Valves spiegel@jlab.org whitey@jlab.org 1095 10/27/23 10/27/20
Goni Chnfal Rail Isp jfoyles@jlab.org stevensm@jlab.org 365 07/12/22 07/12/21
Goni electronics boa keithb@jlab.org stevensm@jlab.org 910 03/08/22 09/10/19
Goni Grease keithb@jlab.org stevensm@jlab.org 545 09/19/22 03/23/21
GTAW Performance Log jfoyles@jlab.org 170 05/20/21 12/01/20
Hall D LCW Filter jfoyles@jlab.org dallen@jlab.org 350 03/03/22 03/18/21
Hall D Motor Drives bunton@jlab.org jfoyles@jlab.org 182 02/28/22 08/30/21
hallduserspassword sandoval@jlab.org 160 05/19/21 12/10/20
He Valve Membrane CK dallen@jlab.org bunton@jlab.org 31 11/12/21 10/12/21
Inst. Air Dryer dallen@jlab.org bunton@jlab.org 45 11/13/21 09/29/21
LCW Filters-BLGD 200 jfoyles@jlab.org dallen@jlab.org 350 06/14/22 06/29/21
LCW Filters-Tagger jfoyles@jlab.org dallen@jlab.org 350 06/14/22 06/29/21
Leak Detector #1 keithb@jlab.org bunton@jlab.org 365 08/08/22 08/08/21
Leak Detector #2 keithb@jlab.org bunton@jlab.org 365 12/01/21 12/01/20
PLC (CPU) Battery sandoval@jlab.org spiegel@jlab.org 730.5 11/29/21 11/30/19
Pump #1 Spare(ESB) keithb@jlab.org bunton@jlab.org 365 07/22/21 07/22/20
Pump #10 CRYO Tank keithb@jlab.org bunton@jlab.org 365 08/04/22 08/04/21
pump #2 Solenoid Man keithb@jlab.org bunton@jlab.org 360 07/25/22 07/30/21
Pump #3 Pair Spec keithb@jlab.org bunton@jlab.org 365 07/30/22 07/30/21
Pump #4 Spare(Hall) keithb@jlab.org bunton@jlab.org 365 07/30/22 07/30/21
Pump #5 Collimator C keithb@jlab.org bunton@jlab.org 365 08/04/22 08/04/21
pump #6 Spare(Hall) keithb@jlab.org bunton@jlab.org 365 08/04/22 08/04/21
pump #7 Goniometer keithb@jlab.org bunton@jlab.org 365 08/09/22 08/09/21
Pump #8 Tagger Magne keithb@jlab.org bunton@jlab.org 365 08/04/22 08/04/21
Pump #9 Tagger East keithb@jlab.org bunton@jlab.org 365 08/04/22 08/04/21
Pump out Saguaro stevensm@jlab.org keithb@jlab.org 350 10/07/21 10/22/20
PXI ADC Calibration beng@jlab.org zihlmann@jlab.org 365 08/13/22 08/13/21
PXI timestamp sync beng@jlab.org zihlmann@jlab.org 180 01/11/22 07/15/21
Refig. Thermometer dallen@jlab.org bunton@jlab.org 365 01/27/22 01/27/21
Replace Gas Shed UPS spiegel@jlab.org stevensm@jlab.org 1825 08/24/22 08/25/17
Roots Blower keithb@jlab.org bunton@jlab.org 365 08/13/22 08/13/21
SMAW Performance Log jfoyles@jlab.org 170 05/20/21 12/01/20
Solenoid warmup whitey@jlab.org stevensm@jlab.org 730 01/19/22 01/20/20
Swap DS BCAL Chiller jfoyles@jlab.org bunton@jlab.org 350 10/26/21 11/10/20
Swap FDC chiller jfoyles@jlab.org bunton@jlab.org 350 09/21/21 10/06/20
Swap US BCAL Chiller jfoyles@jlab.org bunton@jlab.org 350 10/06/21 10/21/20
Tagger Mtr. Coupling bunton@jlab.org jfoyles@jlab.org 182 02/28/22 08/30/21
Tagger Thin Window i bunton@jlab.org whitey@jlab.org 365 11/09/21 11/09/20
Target Chiller Filte jfoyles@jlab.org bunton@jlab.org 180 01/25/22 07/29/21
Test hovanes@jlab.org hovanes.egiyan@gmail.com 60 11/05/21 09/06/21
Vacuum Pump #003 keithb@jlab.org bunton@jlab.org 365 08/11/22 08/11/21
Vacuum Pump #004 keithb@jlab.org bunton@jlab.org 365 07/22/21 07/22/20
Vacuum Pump #005 keithb@jlab.org bunton@jlab.org 365 08/03/22 08/03/21
Vacuum pump #006 keithb@jlab.org bunton@jlab.org 365 07/22/21 07/22/20
VXS/VME AIR FILTERS sandoval@jlab.org stanisla@jlab.org 180 12/02/21 06/05/21