Click the Last Maintenance date to update when the last maintenance was performed
Click the Task to EDIT the long description of this task
Click here to add a new item to the Hall D maintenance maintainer
TASK | Primary Contact | Secondary Contact | PERIOD (days) | NEXT MAINTENANCE | LAST MAINTENANCE |
pump #6 Spare(Hall) | keithb@jlab.org | bunton@jlab.org | 365 | 01/18/24 | 01/18/23 |
Turbopump #6 F223476 HiPace 400 Serial # 15179920 Change/inspect oil cartridge 4 years Backing Pump Penta 35 serial # 21660399 Change oil annually (if dirty), wipe down exterior of pumps. Run up pump and record ultimate pressure after 1 hour. Oil is P3 Oil was changed on 01/04/2017 8912 hrs on Turbopump After 1hr of pumping pressure was 2.3 -7 2/7/2019 checked 10/23/2020 oil changed on backing pump and oil cartridge changed on turbo. 9108 hrs. 8-4-2021 Oil Changed 1/18/23 Pump is ready for use on Hall D upper platform. |